[go: up one dir, main page]

CN111711364B - Self-adaptive leading edge blanking circuit based on high-precision load current detection technology - Google Patents

Self-adaptive leading edge blanking circuit based on high-precision load current detection technology Download PDF

Info

Publication number
CN111711364B
CN111711364B CN202010588499.8A CN202010588499A CN111711364B CN 111711364 B CN111711364 B CN 111711364B CN 202010588499 A CN202010588499 A CN 202010588499A CN 111711364 B CN111711364 B CN 111711364B
Authority
CN
China
Prior art keywords
primary
switch
voltage
sampling
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010588499.8A
Other languages
Chinese (zh)
Other versions
CN111711364A (en
Inventor
罗萍
邓成达
唐天缘
周先立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Electronic Science and Technology of China
Original Assignee
University of Electronic Science and Technology of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Electronic Science and Technology of China filed Critical University of Electronic Science and Technology of China
Priority to CN202010588499.8A priority Critical patent/CN111711364B/en
Publication of CN111711364A publication Critical patent/CN111711364A/en
Application granted granted Critical
Publication of CN111711364B publication Critical patent/CN111711364B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of DC power input into DC power output
    • H02M3/22Conversion of DC power input into DC power output with intermediate conversion into AC
    • H02M3/24Conversion of DC power input into DC power output with intermediate conversion into AC by static converters
    • H02M3/28Conversion of DC power input into DC power output with intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate AC
    • H02M3/325Conversion of DC power input into DC power output with intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate AC using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of DC power input into DC power output with intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate AC using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33507Conversion of DC power input into DC power output with intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate AC using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters
    • H02M3/33523Conversion of DC power input into DC power output with intermediate conversion into AC by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate AC using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters with galvanic isolation between input and output of both the power stage and the feedback loop
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/32Means for protecting converters other than automatic disconnection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0048Circuits or arrangements for reducing losses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/10Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Dc-Dc Converters (AREA)

Abstract

一种基于高精度负载电流检测技术的自适应前沿消隐电路,包括高精度负载电流检测模块和自适应前沿消隐时间设置模块。其中高精度负载电流检测模块用于获得与原边反馈反激变换器的负载电流和工作频率成正比的信号并传输给自适应前沿消隐时间设置模块;自适应前沿消隐时间设置模块根据原边反馈反激变换器的负载电流和工作频率产生自适应前消隐信号控制膝点电压的采样时刻,在原边反馈反激变换器工作在轻载或者低频情况时使得自适应前沿消隐信号的使能时间变短,在原边反馈反激变换器工作在重载或者高频时使得自适应前沿消隐信号的使能时间变长。本发明能够避免误采样,提高原边反馈反激变换器输出电压精度,同时降低了电压采样的轻载功耗。

Figure 202010588499

An adaptive leading edge blanking circuit based on high-precision load current detection technology includes a high-precision load current detection module and an adaptive leading edge blanking time setting module. Among them, the high-precision load current detection module is used to obtain the signal proportional to the load current and operating frequency of the primary side feedback flyback converter and transmit it to the adaptive leading edge blanking time setting module; the adaptive leading edge blanking time setting module is based on the original The load current and operating frequency of the side feedback flyback converter generate an adaptive front blanking signal to control the sampling time of the knee point voltage. When the primary side feedback flyback converter works at light load or low frequency, the adaptive front blanking signal The enabling time becomes shorter, and the enabling time of the adaptive leading edge blanking signal becomes longer when the primary-side feedback flyback converter operates under heavy load or high frequency. The invention can avoid wrong sampling, improve the output voltage precision of the primary side feedback flyback converter, and reduce light-load power consumption of voltage sampling at the same time.

Figure 202010588499

Description

一种基于高精度负载电流检测技术的自适应前沿消隐电路An Adaptive Leading Edge Blanking Circuit Based on High Precision Load Current Detection Technology

技术领域technical field

本发明属于集成电路领域与开关电源领域,更具体来说,涉及一种基于高精度负载电流检测技术的自适应前沿消隐电路。The invention belongs to the field of integrated circuits and switching power supplies, and more specifically relates to an adaptive leading edge blanking circuit based on high-precision load current detection technology.

背景技术Background technique

传统的反激变换器调节主要分为原边反馈调节和副边反馈调节,其中,副边反馈调节方式需要光耦器件以及相关电路组件,增加系统成本,且结构复杂,原边反馈调节方式利用原边绕组或辅助绕组进行反馈调节,更具有广阔的应用范围。中小功率反激变换器大多数工作在断续模式,通过采样辅助绕组上的膝点电压从而达到调节输出电压的目的,进而控制系统恒压输出。Traditional flyback converter adjustment is mainly divided into primary-side feedback adjustment and secondary-side feedback adjustment. Among them, the secondary-side feedback adjustment method requires optocoupler devices and related circuit components, which increases system cost and has a complex structure. The primary-side feedback adjustment method uses The primary winding or the auxiliary winding is used for feedback adjustment, which has a wider range of applications. Most of the small and medium power flyback converters work in discontinuous mode. By sampling the knee point voltage on the auxiliary winding, the purpose of adjusting the output voltage is achieved, and then the constant voltage output of the system is controlled.

如图1所示为传统原边反馈反激变换器系统的架构图,原边反馈反激变换器的输入电压为VIN,输出电压为VOUT,其中的VBUS为母线电压。原边反馈反激变换器主要包括由原边绕组NP、副边绕组NS和辅助绕组NA组成的变压器T,与原边绕组同名端连接的原边开关管S0、与副边绕组同名端连接的整流二极管D2,整流二极管D2阳极接副边绕组同名端,阴极接系统输出端,与原边开关管S0漏极和原边绕组异名端连接的有钳位电容CCLAMP、钳位电阻RCLAMP和钳位二极管D1Figure 1 shows the architecture diagram of a traditional primary-side feedback flyback converter system. The input voltage of the primary-side feedback flyback converter is V IN , the output voltage is V OUT , and V BUS is the bus voltage. The primary side feedback flyback converter mainly includes a transformer T composed of primary winding N P , secondary winding N S and auxiliary winding N A , the primary switching tube S 0 connected to the same terminal of the primary winding, and the secondary winding The rectifier diode D2 connected to the end of the same name, the anode of the rectifier diode D2 is connected to the end of the same name of the secondary winding, the cathode is connected to the output end of the system, and there is a clamping capacitor C connected to the drain of the primary switching tube S0 and the opposite end of the primary winding CLAMP , clamp resistor R CLAMP and clamp diode D 1 .

原边反馈调节的反激变换器系统中,在原边开关管S0关断时,副边绕组电感能量开始给负载供电,当副边电流降为零时,输出线路阻抗影响达到最小,此时对应辅助绕组的信号VAUX波形上电压为膝点电压VKNEE,反激变换器对膝点电压VKNEE进行采样保持,经过等效关系转换,得到输出电压信息,用作原边反馈反激变换器的恒定电压输出,所以准确采样膝点电压信息至关重要。In the flyback converter system with primary side feedback adjustment, when the primary side switch S 0 is turned off, the inductance energy of the secondary winding starts to supply power to the load, and when the secondary side current drops to zero, the influence of the output line impedance reaches the minimum, at this time The voltage on the waveform corresponding to the signal V AUX of the auxiliary winding is the knee point voltage V KNEE , the flyback converter samples and holds the knee point voltage V KNEE , and converts through the equivalent relationship to obtain the output voltage information, which is used as the primary side feedback flyback conversion The constant voltage output of the device, so it is very important to accurately sample the knee point voltage information.

在原边开关管导通阶段,输入电压给原边电感充电,绝大部分能量储存在励磁电感中;但原边绕组存在少量磁通没有通过磁芯耦合到副边绕组,而是通过空气闭合返回到原边,从而产生漏感,因此,原边漏感能量并不是完全传输到副边,部分能量在漏感、寄生电容中,在原边功率管关断时,导致辅助绕组产生振荡,随着负载电流增大,振荡越剧烈,容易导致膝点电压误采样。During the conduction phase of the primary side switch tube, the input voltage charges the primary side inductance, and most of the energy is stored in the excitation inductance; however, there is a small amount of magnetic flux in the primary side winding that is not coupled to the secondary side winding through the magnetic core, but returns through air closure Therefore, the leakage inductance energy of the primary side is not completely transmitted to the secondary side, and part of the energy is in the leakage inductance and parasitic capacitance. When the power tube of the primary side is turned off, the auxiliary winding will oscillate. As the load current increases, the oscillation becomes more severe, which easily leads to false sampling of the knee point voltage.

具体来说,原边反馈反激变换器中变压器存在漏感,漏感能量无法传输到副边,绝大部分漏感能量将被图1中原边反馈反激变换器的箝位二极管D1、箝位电容CCLAMP和箝位电阻RCLAMP三者组成的RCD电路吸收消耗,但由于钳位二极管正向导通压降和反向恢复等寄生效应,漏感能量无法完全被消耗,仍存在一部分漏感能量储存在系统的寄生电感、电容中;当原边功率管关断时,这一部分能量在回路中产生谐振,并在原边绕组和辅助绕组波形上产生高频震荡,容易导致电压误采样,从而直接反激变换器影响输出电压精度。Specifically, there is leakage inductance in the transformer in the primary side feedback flyback converter, and the leakage inductance energy cannot be transmitted to the secondary side. Most of the leakage inductance energy will be clamped by the clamping diode D 1 , The RCD circuit composed of the clamping capacitor C CLAMP and the clamping resistor R CLAMP absorbs and consumes, but due to the parasitic effects such as the forward voltage drop and reverse recovery of the clamping diode, the leakage inductance energy cannot be completely consumed, and there is still a part of the leakage The inductive energy is stored in the parasitic inductance and capacitance of the system; when the primary power tube is turned off, this part of the energy resonates in the loop, and produces high-frequency oscillations on the primary winding and auxiliary winding waveforms, which easily leads to voltage missampling. Thus the direct flyback converter affects the output voltage accuracy.

漏感储存的能量主要与漏感值、流过漏感的电流值以及电流变化率dI/dt相关,经过等效关系,流过漏感的电流大小可等效为负载的轻重,当系统变压器确定后,漏感值本身较小,不会产生较大的波动,漏感能量主要受负载电流和工作频率影响。在每个开关周期内,辅助绕组上电压振荡随负载电流的变化而变化。当负载为轻载且工作频率较低时,流过漏感的电流较小,同时电流变化率较小,因此储存在漏感的能量较小,在原边功率管关断时,漏感能量在辅助绕组上产生的振荡幅值较低,振荡衰减时间较短;当负载为重载且工作频率较高时,流过漏感的电流较大,同时电流变化率较大,因此储存在漏感的能量较高,在原边功率管关断时,漏感能量在辅助绕组上产生的振荡幅值较高,振荡衰减时间较长。The energy stored in the leakage inductance is mainly related to the leakage inductance value, the current value flowing through the leakage inductance, and the current change rate dI/dt. Through the equivalent relationship, the magnitude of the current flowing through the leakage inductance can be equivalent to the weight of the load. When the system transformer After being determined, the leakage inductance value itself is small and will not produce large fluctuations, and the leakage inductance energy is mainly affected by the load current and operating frequency. During each switching cycle, the voltage oscillation on the auxiliary winding varies with the load current. When the load is light and the operating frequency is low, the current flowing through the leakage inductance is small, and the current change rate is small, so the energy stored in the leakage inductance is small. When the primary side power tube is turned off, the leakage inductance energy is The oscillation amplitude generated on the auxiliary winding is low, and the oscillation decay time is short; when the load is heavy and the operating frequency is high, the current flowing through the leakage inductance is large, and the current change rate is large, so it is stored in the leakage inductance The energy of the leakage inductance is relatively high, and when the power tube of the primary side is turned off, the oscillation amplitude generated by the leakage inductance energy on the auxiliary winding is relatively high, and the oscillation attenuation time is relatively long.

传统的反激变换器电流检测电路通过检测原边电流峰值来直接反映负载电流信息,但当系统工作频率变化时,漏感能量受电流变化率影响较大,传统的原边电流峰值检测电路无法检测包含工作频率信息的负载电流参数,可能导致前沿消隐时间信号无法有效地屏蔽辅助绕组高频振荡,导致膝点电压误采样。The traditional flyback converter current detection circuit directly reflects the load current information by detecting the peak current of the primary side, but when the operating frequency of the system changes, the leakage inductance energy is greatly affected by the current change rate, and the traditional peak current detection circuit of the primary side cannot Detecting the load current parameters including the operating frequency information may cause the leading-edge blanking time signal to be unable to effectively shield the high-frequency oscillation of the auxiliary winding, resulting in false sampling of the knee point voltage.

为解决辅助绕组波形振荡对电压采样产生的影响,传统做法是加入一段固定时间的前沿消隐时间或者检测到振荡波形小于阈值再延迟一段固定时间采样,上述做法都引入了一段固定消隐时间信号,但是,当负载电流变大或系统工作频率升高时,过短的前沿消隐时间可能不足以屏蔽辅助绕组的电压振荡;当负载电流变小或系统工作频率降低时,设置过长的前沿消隐时间不仅将导致系统功耗随之上升,更可能将辅助绕组电压波形完全屏蔽掉,影响系统电压反馈调节。In order to solve the impact of auxiliary winding waveform oscillation on voltage sampling, the traditional method is to add a fixed period of leading edge blanking time or to delay sampling for a fixed period of time when the oscillation waveform is detected to be less than the threshold. The above methods have introduced a period of fixed blanking time signal , however, when the load current becomes larger or the system operating frequency increases, the too short leading edge blanking time may not be enough to shield the voltage oscillation of the auxiliary winding; The blanking time will not only increase the power consumption of the system, but also completely shield the voltage waveform of the auxiliary winding, which will affect the system voltage feedback regulation.

发明内容Contents of the invention

针对上述原边反馈反激变换器中膝点电压检测技术中由于前沿消隐时间固定导致的膝点电压采样不准确问题,本发明提出了一种基于高精度负载电流检测技术的自适应前沿消隐电路,能够根据原边反馈反激变换器的负载电流和工作频率产生自动调节的自适应前消隐信号控制原边反馈反激变换器的膝点电压采样,能够提高膝点电压采样的准确度,同时降低了电路功耗。Aiming at the inaccurate knee point voltage sampling problem caused by the fixed leading edge blanking time in the knee point voltage detection technology of the above-mentioned primary side feedback flyback converter, the present invention proposes an adaptive leading edge blanking technology based on high-precision load current detection technology. The hidden circuit can generate an automatically adjusted adaptive pre-blanking signal according to the load current and operating frequency of the primary-side feedback flyback converter to control the knee-point voltage sampling of the primary-side feedback flyback converter, which can improve the accuracy of the knee-point voltage sampling degree, while reducing circuit power consumption.

本发明的技术方案为:Technical scheme of the present invention is:

一种基于高精度负载电流检测技术的自适应前沿消隐电路,能够用于产生自适应前消隐信号控制原边反馈反激变换器的膝点电压采样;所述自适应前沿消隐电路包括高精度负载电流检测模块和自适应前沿消隐时间设置模块,An adaptive leading edge blanking circuit based on high-precision load current detection technology, which can be used to generate an adaptive front blanking signal to control the knee point voltage sampling of the primary side feedback flyback converter; the adaptive leading edge blanking circuit includes High-precision load current detection module and adaptive leading edge blanking time setting module,

所述高精度负载电流检测模块包括原边电流峰值采样单元、第一电压-电流转换单元、消磁时间积分单元和平均值单元,The high-precision load current detection module includes a primary current peak sampling unit, a first voltage-current conversion unit, a degaussing time integration unit and an average value unit,

所述原边电流峰值采样单元用于在所述原边反馈反激变换器的原边开关管导通时采样所述原边开关管源端电压获得采样电压,在所述原边开关管关断时将得到的所述采样电压的峰值进行保持,所述原边电流峰值采样单元在所述原边开关管的每个开关周期开始时将所述采样电压清零;The primary-side current peak sampling unit is used to sample the source terminal voltage of the primary-side switching tube to obtain a sampling voltage when the primary-side switching tube of the primary-side feedback flyback converter is turned on, and to obtain a sampling voltage when the primary-side switching tube is turned off. Hold the obtained peak value of the sampling voltage when it is off, and the primary current peak sampling unit clears the sampling voltage to zero at the beginning of each switching cycle of the primary switching tube;

所述第一电压-电流转换单元用于将所述原边电流峰值采样单元输出的所述采样电压转换为对应的采样电流;The first voltage-current conversion unit is used to convert the sampling voltage output by the primary current peak sampling unit into a corresponding sampling current;

所述消磁时间积分单元包括第五开关、第六开关、第七开关和第三电容,第五开关一端连接所述采样电流,另一端连接第三电容的一端并作为所述消磁时间积分单元的输出端,第三电容的另一端接地;第六开关接在所述消磁时间积分单元的输出端和地之间,第七开关接在所述消磁时间积分单元的输出端和地之间;其中第五开关仅在副边绕组消磁时间内闭合,所述副边绕组消磁时间为从所述原边开关管关断到所述原边反馈反激变换器副边绕组的电流降为零的时间;第六开关仅在所述原边开关管刚关断时闭合,第七开关仅在所述原边反馈反激变换器副边绕组的电流降为零时闭合;The degaussing time integration unit includes a fifth switch, a sixth switch, a seventh switch and a third capacitor, one end of the fifth switch is connected to the sampling current, and the other end is connected to one end of the third capacitor and serves as the degaussing time integration unit. The output terminal, the other end of the third capacitor is grounded; the sixth switch is connected between the output terminal of the degaussing time integration unit and the ground, and the seventh switch is connected between the output terminal of the degaussing time integration unit and the ground; wherein The fifth switch is closed only during the degaussing time of the secondary winding, and the degaussing time of the secondary winding is the time from when the primary switching tube is turned off to when the current of the secondary winding of the primary feedback flyback converter drops to zero ; The sixth switch is only closed when the primary side switch tube is just turned off, and the seventh switch is only closed when the current of the secondary winding of the primary side feedback flyback converter drops to zero;

所述平均值单元用于将所述消磁时间积分单元的输出信号进行滤波和求平均值后产生所述高精度负载电流检测模块的输出信号,所述高精度负载电流检测模块的输出信号与所述原边反馈反激变换器的负载电流和工作频率成正比;The average value unit is used to filter and average the output signal of the degaussing time integration unit to generate the output signal of the high-precision load current detection module, and the output signal of the high-precision load current detection module is consistent with the The load current of the primary side feedback flyback converter is proportional to the operating frequency;

所述自适应前沿消隐时间设置模块包括第一开关、第一电流源、第二电流源、第二电压-电流转换单元、第一电容、第一反相器和第二反相器,The adaptive leading edge blanking time setting module includes a first switch, a first current source, a second current source, a second voltage-current conversion unit, a first capacitor, a first inverter and a second inverter,

第一电流源为恒定电流源;第二电压-电流转换单元用于将所述高精度负载电流检测模块的输出信号转换为对应的电流信号作用在第二电流源上,使得第二电流源的电流值与所述高精度负载电流检测模块的输出信号成正比;The first current source is a constant current source; the second voltage-current conversion unit is used to convert the output signal of the high-precision load current detection module into a corresponding current signal to act on the second current source, so that the second current source The current value is proportional to the output signal of the high-precision load current detection module;

第一电容一端连接第一反相器的输入端并通过第一开关后接地,另一端接地;第一电容通过第一电流源进行充电,通过第二电流源进行放电;第一开关由所述原边开关管的栅极控制信号控制其开关动作;One end of the first capacitor is connected to the input end of the first inverter and grounded after passing through the first switch, and the other end is grounded; the first capacitor is charged by the first current source and discharged by the second current source; the first switch is controlled by the The gate control signal of the primary switch tube controls its switching action;

第二反相器的输入端连接第一反相器的输出端,其输出端输出所述自适应前消隐信号。The input end of the second inverter is connected to the output end of the first inverter, and the output end of the second inverter outputs the adaptive pre-blanking signal.

具体的,所述原边开关管的漏极连接所述原边反馈反激变换器中原边绕组的同名端,其源极连接所述原边电流峰值采样单元的输入端并通过采样电阻后接地;Specifically, the drain of the primary switching tube is connected to the same-named terminal of the primary winding in the primary feedback flyback converter, and its source is connected to the input terminal of the primary current peak sampling unit and grounded after passing through the sampling resistor ;

所述原边电流峰值采样单元包括第一运算放大器、第二开关、第二电容和第四开关,第一运算放大器的输入端作为所述原边电流峰值采样单元的输入端,其输出端通过第二开关后连接第二电容的一端并作为所述原边电流峰值采样单元的输出端输出所述采样电压,第二电容的另一端接地;第四开关接在所述原边电流峰值采样单元的输出端和地之间;第二开关由所述原边开关管的栅极控制信号控制其开关动作;第四开关仅在所述原边开关管的每个开关周期开始时闭合。The primary current peak sampling unit includes a first operational amplifier, a second switch, a second capacitor and a fourth switch, the input of the first operational amplifier is used as the input of the primary current peak sampling unit, and its output is passed through Connect one end of the second capacitor after the second switch and output the sampling voltage as the output terminal of the primary current peak sampling unit, and the other end of the second capacitor is grounded; the fourth switch is connected to the primary current peak sampling unit between the output terminal of the primary side switch and the ground; the switching action of the second switch is controlled by the gate control signal of the primary side switching tube; the fourth switch is only closed at the beginning of each switching cycle of the primary side switching tube.

具体的,所述平均值单元包括第二运算放大器、第一电阻和第四电容,第二运算放大器的输入端连接所述消磁时间积分单元的输出信号,其输出端连接第一电阻的一端,第一电阻的另一端输出所述高精度负载电流检测模块的输出信号并通过第四电容后接地。Specifically, the averaging unit includes a second operational amplifier, a first resistor and a fourth capacitor, the input of the second operational amplifier is connected to the output signal of the degaussing time integration unit, and its output is connected to one end of the first resistor, The other end of the first resistor outputs the output signal of the high-precision load current detection module and is grounded after passing through the fourth capacitor.

本发明的有益效果为:利用本发明产生的自适应前消隐信号控制原边反馈反激变换器的膝点电压采样,能够在原边反馈反激变换器的负载变重或系统工作频率提高的情况下将膝点电压采样所需的前沿消隐时间自适应同步变长,从而避免振荡导致膝点电压误采样;在原边反馈反激变换器的负载变轻或系统工作频率降低的情况下将膝点电压采样时所需的前沿消隐时间自适应同步变短,不会将辅助绕组电压波形完全屏蔽掉,也不影响系统电压反馈调节;当原边反馈反激变换器系统轻载或空载输出时,采用相对固定前沿消隐时间的膝点电压采样;本发明一方面能够使得原边反馈反激变换器的膝点电压采样更加准确,避免了辅助绕组高频噪声造成误采样,提高了原边反馈反激变换器输出电压精度和工作稳定性,另一方面,自适应控制膝点电压采样过程中的前沿消隐时间,可以降低电压采样电路轻载功耗,提升系统效率。The beneficial effects of the present invention are: the knee point voltage sampling of the primary-side feedback flyback converter is controlled by using the self-adaptive pre-blanking signal generated by the present invention, and the load of the primary-side feedback flyback converter becomes heavier or the operating frequency of the system increases In this case, the leading edge blanking time required for knee point voltage sampling will be lengthened adaptively and synchronously, so as to avoid the false sampling of knee point voltage caused by oscillation; when the load of the primary side feedback flyback converter becomes lighter or the operating frequency of the system is reduced, the The leading edge blanking time required for knee point voltage sampling is shortened adaptively and synchronously, which will not completely shield the auxiliary winding voltage waveform, and will not affect the system voltage feedback adjustment; when the primary side feedback flyback converter system is light-loaded or empty When the load is output, the knee point voltage sampling with a relatively fixed leading edge blanking time is adopted; on the one hand, the present invention can make the knee point voltage sampling of the primary side feedback flyback converter more accurate, avoiding false sampling caused by high-frequency noise of the auxiliary winding, and improving The output voltage accuracy and working stability of the primary-side feedback flyback converter are improved. On the other hand, the adaptive control of the leading edge blanking time in the knee point voltage sampling process can reduce the light-load power consumption of the voltage sampling circuit and improve system efficiency.

附图说明Description of drawings

图1为原边反馈反激变换器的电路框图。Figure 1 is a circuit block diagram of the primary side feedback flyback converter.

图2为采用本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路的原边反馈反激变换器电路框图。FIG. 2 is a circuit block diagram of a primary side feedback flyback converter using an adaptive leading edge blanking circuit based on high precision load current detection technology proposed by the present invention.

图3为本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路中高精度负载电流检测模块在实施例中的一种实现电路图。FIG. 3 is an implementation circuit diagram of a high-precision load current detection module in an embodiment of an adaptive leading edge blanking circuit based on high-precision load current detection technology proposed by the present invention.

图4为本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路中自适应前沿消隐时间设置模块在实施例中的一种实现电路图。FIG. 4 is an implementation circuit diagram of an adaptive leading edge blanking time setting module in an embodiment of an adaptive leading edge blanking circuit based on high-precision load current detection technology proposed by the present invention.

图5为采用本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路的原边反馈反激变换器轻载工作实例波形图。FIG. 5 is a waveform diagram of a light-load working example of a primary-side feedback flyback converter using an adaptive leading edge blanking circuit based on a high-precision load current detection technology proposed by the present invention.

图6为采用本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路的原边反馈反激变换器重载工作实例波形图。FIG. 6 is a waveform diagram of a heavy-load working example of a primary-side feedback flyback converter using an adaptive leading edge blanking circuit based on a high-precision load current detection technology proposed by the present invention.

图7为采用本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路的原边反馈反激变换器低频工作实例波形图。FIG. 7 is a waveform diagram of a low-frequency working example of a primary-side feedback flyback converter using an adaptive leading edge blanking circuit based on a high-precision load current detection technology proposed by the present invention.

图8为采用本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路的原边反馈反激变换器高频工作实例波形图。FIG. 8 is a waveform diagram of a high-frequency working example of a primary-side feedback flyback converter using an adaptive leading edge blanking circuit based on high-precision load current detection technology proposed by the present invention.

具体实施方式Detailed ways

为了使公众对本发明有更深入的了解,以下结合说明书附图对本发明的一个具体实施例作详细描述和分析,介绍本发明的工作原理及其实用性,但本发明并不仅限于此具体实施例。本发明涵盖了任何在本发明思想和范围上的修改、替代方法以及方案。In order to make the public have a deeper understanding of the present invention, a specific embodiment of the present invention will be described and analyzed in detail below in conjunction with the accompanying drawings, and the working principle and practicability of the present invention will be introduced, but the present invention is not limited to this specific embodiment . The present invention covers any modifications, alternative methods and schemes within the spirit and scope of the present invention.

如图2所示,本发明提出的一种基于高精度负载电流检测技术的自适应前沿消隐电路包括高精度负载电流检测模块201和自适应前沿消隐时间设置模块202。其中高精度负载电流检测模块201用于对原边反馈反激变换器的原边开关管S0的源极采样电阻RCS上端电压信号VCS采样,如图2所示,原边开关管S0的漏极连接原边反馈反激变换器中原边绕组的同名端,其源极通过采样电阻RCS后接地。高精度负载电流检测模块201产生包含原边反馈反激变换器的负载电流和系统工作频率信息的高精度负载电流检测模块的输出信号VSAMPLE送入自适应前沿消隐时间设置模块202。自适应前沿消隐时间设置模块202根据高精度负载电流检测模块201的输出信号VSAMPLE产生自适应前沿消隐信号VLEB送入膝点电压采样电路,用于控制原边反馈反激变换器在当前开关周期内膝点电压采样电路的采样时刻。膝点电压采样电路203的第一输入数据为辅助绕组电压信号VAUX,第二输入数据为自适应前沿消隐信号VLEB,输出数据为膝点电压采样信号VKNEE。波形调制驱动电路204输入数据为膝点电压采样信号VKNEE,输出数据为原边开关管的栅极控制信号VGATE,用于控制原边开关管S0的导通与关断。当自适应前沿消隐信号VLEB使能时,膝点电压采样电路停止对辅助绕组电压信号VAUX采样;当自适应前沿消隐信号VLEB不使能时,膝点电压采样电路开始对辅助绕组电压信号VAUX采样;利用本发明提出的自适应前沿消隐电路产生的自适应前沿消隐信号VLEB,其使能宽度与原边反馈反激变换器的负载电流和系统工作频率成正相关关系。As shown in FIG. 2 , an adaptive leading edge blanking circuit based on high-precision load current detection technology proposed by the present invention includes a high-precision load current detection module 201 and an adaptive leading edge blanking time setting module 202 . Among them, the high-precision load current detection module 201 is used to sample the voltage signal V CS at the upper end of the source sampling resistor R CS of the primary-side switching tube S0 of the primary-side feedback flyback converter, as shown in FIG. 2 , the primary-side switching tube S The drain of 0 is connected to the terminal with the same name of the primary winding in the primary feedback flyback converter, and its source is grounded after passing through the sampling resistor R CS . The high-precision load current detection module 201 generates the output signal V SAMPLE of the high-precision load current detection module including the load current of the primary-side feedback flyback converter and the system operating frequency information, and sends it to the adaptive leading edge blanking time setting module 202 . The adaptive leading edge blanking time setting module 202 generates an adaptive leading edge blanking signal V LEB according to the output signal V SAMPLE of the high-precision load current detection module 201 and sends it to the knee point voltage sampling circuit for controlling the primary side feedback flyback converter in The sampling time of the knee point voltage sampling circuit in the current switching cycle. The first input data of the knee voltage sampling circuit 203 is the auxiliary winding voltage signal V AUX , the second input data is the adaptive leading edge blanking signal V LEB , and the output data is the knee voltage sampling signal V KNEE . The input data of the waveform modulation drive circuit 204 is the knee point voltage sampling signal V KNEE , and the output data is the gate control signal V GATE of the primary switch, which is used to control the turn-on and turn-off of the primary switch S 0 . When the adaptive leading edge blanking signal V LEB is enabled, the knee point voltage sampling circuit stops sampling the auxiliary winding voltage signal V AUX ; when the adaptive leading edge blanking signal V LEB is disabled, the knee point voltage sampling circuit starts sampling the auxiliary winding voltage signal V AUX The winding voltage signal V AUX is sampled; the adaptive leading edge blanking signal V LEB generated by the adaptive leading edge blanking circuit proposed by the present invention is positively correlated with the load current and system operating frequency of the primary side feedback flyback converter with its enabling width relation.

如图3所示,高精度负载电流检测模块包括原边电流峰值采样单元、第一电压-电流转换单元、消磁时间积分单元和平均值单元,其中原边电流峰值采样单元用于接收原边开关管S0源极采样电阻上端电压信号VCS,在原边开关管S0导通时,对采样电阻上端电压信号VCS采样获得采样电压;在原边开关管S0关断时,原边电流峰值采样单元的电压保持值为采样电压峰值。图3所示给出了原边电流峰值采样单元的一种具体实现结构,包括第一运算放大器U3、第二开关S2、第二电容C2和第四开关S4,第一运算放大器U3的输入端作为原边电流峰值采样单元的输入端连接原边开关管S0源极采样电阻上端电压信号VCS,其输出端通过第二开关S2后连接第二电容C2的一端并作为原边电流峰值采样单元的输出端输出采样电压VCS_PK,第二电容C2的另一端接地;第四开关S4接在原边电流峰值采样单元的输出端和地之间。第二开关S2由原边开关管的栅极控制信号VGATE控制其开关动作;第四开关S4仅在原边开关管的每个开关周期开始时闭合清零第二电容C2上的电压即采样电压VCS_PKAs shown in Figure 3, the high-precision load current detection module includes a primary current peak sampling unit, a first voltage-current conversion unit, a degaussing time integration unit, and an average value unit, where the primary current peak sampling unit is used to receive the primary switch The voltage signal V CS at the upper end of the sampling resistor at the source of the tube S 0 , when the primary switch tube S 0 is turned on, samples the voltage signal V CS at the upper end of the sampling resistor to obtain the sampling voltage; when the primary switch tube S 0 is turned off, the peak value of the primary current The voltage hold value of the sampling unit is the peak value of the sampling voltage. Figure 3 shows a specific implementation structure of the primary current peak sampling unit, including the first operational amplifier U 3 , the second switch S 2 , the second capacitor C 2 and the fourth switch S 4 , the first operational amplifier The input terminal of U 3 is used as the input terminal of the primary current peak sampling unit to connect to the upper terminal voltage signal V CS of the source sampling resistor of the primary switching tube S 0 , and its output terminal is connected to one end of the second capacitor C 2 after passing through the second switch S 2 And as the output terminal of the primary current peak sampling unit to output the sampling voltage V CS_PK , the other end of the second capacitor C 2 is grounded; the fourth switch S 4 is connected between the output terminal of the primary current peak sampling unit and the ground. The switching action of the second switch S 2 is controlled by the gate control signal V GATE of the primary switching tube; the fourth switch S 4 is only closed at the beginning of each switching cycle of the primary switching tube to clear the voltage on the second capacitor C 2 That is, the sampling voltage V CS_PK .

第一电压-电流转换单元由于接收原边电流峰值采样单元输出的采样电压VCS_PK并转换为匹配该电压信息的电流信号,即采样电流。The first voltage-current conversion unit receives the sampling voltage V CS_PK output by the primary current peak sampling unit and converts it into a current signal matching the voltage information, that is, the sampling current.

消磁时间积分单元用于接收副边绕组消磁时间信号VTDIS和第一电压-电流转换单元输出的采样电流,通过电容积分得到反应原边反馈反激变换器的负载电流信息的电压信号。如图3所示,消磁时间积分单元包括第五开关S5、第六开关S6、第七开关S7和第三电容C3,第五开关S5一端连接第一电压-电流转换单元输出的采样电流,另一端连接第三电容C3的一端并作为消磁时间积分单元的输出端,第三电容C3的另一端接地;第六开关S6接在消磁时间积分单元的输出端和地之间,第七开关S7接在消磁时间积分单元的输出端和地之间。其中第五开关由副边绕组消磁时间信号VTDIS控制仅在副边绕组消磁时间内闭合,使得消磁时间积分单元在副边绕组消磁时间内进行电容积分,其中副边绕组消磁时间为从原边开关管S0关断到原边反馈反激变换器副边绕组的电流降为零的时间。第六开关S6仅在原边开关管S0刚关断时闭合,第七开关S7仅在原边反馈反激变换器副边绕组的电流降为零时闭合,使得第三电容C3上的电压在原边开关管S0刚关断时和原边反馈反激变换器副边绕组的电流降为零时清零。The degaussing time integration unit is used to receive the secondary winding degaussing time signal V TDIS and the sampling current output by the first voltage-current conversion unit, and obtain the voltage signal reflecting the load current information of the primary feedback flyback converter through capacitance integration. As shown in Figure 3, the degaussing time integration unit includes a fifth switch S 5 , a sixth switch S 6 , a seventh switch S 7 and a third capacitor C 3 , and one end of the fifth switch S 5 is connected to the output of the first voltage-current conversion unit The sampling current, the other end is connected to one end of the third capacitor C3 and used as the output end of the degaussing time integration unit, the other end of the third capacitor C3 is grounded; the sixth switch S6 is connected to the output end of the degaussing time integration unit and the ground Between, the seventh switch S7 is connected between the output terminal of the degaussing time integration unit and the ground. The fifth switch is controlled by the secondary winding degaussing time signal V TDIS and is only closed during the secondary winding degaussing time, so that the degaussing time integration unit performs capacitance integration within the secondary winding degaussing time, wherein the secondary winding degaussing time is from the primary side The time from when the switch tube S 0 is turned off to when the current of the secondary winding of the primary feedback flyback converter drops to zero. The sixth switch S6 is only closed when the primary side switch S0 is just turned off, and the seventh switch S7 is only closed when the current of the secondary winding of the primary side feedback flyback converter drops to zero, so that the third capacitor C3 The voltage is cleared when the primary side switching tube S 0 is just turned off and when the current of the secondary winding of the primary side feedback flyback converter drops to zero.

平均值单元接收消磁时间积分单元的输出信号VCH并进行滤波和求平均值后产生高精度负载电流检测模块的输出信号VSAMPLE,高精度负载电流检测模块的输出信号VSAMPLE与原边反馈反激变换器的负载电流和工作频率成正比。如图3所示给出了平均值单元的一种具体实现电路,包括第二运算放大器U4、第一电阻R4和第四电容C4,第二运算放大器U4的输入端连接消磁时间积分单元的输出信号VCH,其输出端连接第一电阻R4的一端,第一电阻R4的另一端输出高精度负载电流检测模块的输出信号VSAMPLE并通过第四电容C4后接地。The average value unit receives the output signal V CH of the degaussing time integration unit and performs filtering and averaging to generate the output signal V SAMPLE of the high-precision load current detection module. The output signal V SAMPLE of the high-precision load current detection module is inverted from the primary feedback The load current of the excitation converter is directly proportional to the operating frequency. As shown in Figure 3, a specific implementation circuit of the average value unit is given, including the second operational amplifier U 4 , the first resistor R 4 and the fourth capacitor C 4 , the input terminal of the second operational amplifier U 4 is connected to the degaussing time The output signal V CH of the integrating unit is connected to one end of the first resistor R 4 , and the other end of the first resistor R 4 outputs the output signal V SAMPLE of the high-precision load current detection module and is grounded after passing through the fourth capacitor C 4 .

本实施例中高精度负载电流检测模块的工作原理为:The working principle of the high-precision load current detection module in this embodiment is as follows:

第二开关S2通过原边开关管的栅极控制信号VGATE控制其开关状态,当第二开关S2闭合时,原边开关管源极采样电阻上端电压信号VCS传递至第二电容C2,第二电容C2上的电压为VCS_PK,清零信号VRT1控制第四开关S4,使得第四开关S4在原边开关管S0每个开关周期开始时闭合从而对第二电容C2上的电压VCS_PK进行清零;第二电容C2上的电压VCS_PK通过第一电压-电流转换单元转换为包含该电压信息的第三电流源I3;第五开关S5通过副边绕组消磁时间信号VTDIS控制其开关状态,使得第五开关S5仅在副边绕组消磁时间内(即从原边开关管S0关断到原边反馈反激变换器副边绕组的电流降为零的时间)闭合,当第五开关S5闭合时,第三电流源I3对第三电容C3积分,得到第三电容C3上端电压信号VCH即消磁时间积分单元的输出信号VCH;清零信号VRT2控制第六开关S6,在副边绕组开始消磁时将第六开关S6闭合从而对第三电容C3的电压VCH进行清零,清零信号VRT3控制第七开关S7,在消磁时间结束时将第七开关S7闭合从而对第三电容C3的电压VCH进行清零;第三电容C3上端电压信号VCH通过平均值单元得到最终的高精度负载电流检测模块的输出信号VSAMPLEThe second switch S 2 controls its switching state through the gate control signal V GATE of the primary switch tube. When the second switch S 2 is closed, the voltage signal V CS at the upper end of the source sampling resistor of the primary switch tube is transmitted to the second capacitor C 2 , the voltage on the second capacitor C 2 is V CS_PK , and the clearing signal V RT1 controls the fourth switch S 4 , so that the fourth switch S 4 is closed at the beginning of each switching cycle of the primary side switch S 0 so that the second capacitor The voltage V CS_PK on C 2 is cleared; the voltage V CS_PK on the second capacitor C 2 is converted into the third current source I 3 containing the voltage information through the first voltage-current conversion unit; the fifth switch S 5 is passed through the secondary The side winding degaussing time signal V TDIS controls its switch state, so that the fifth switch S 5 can only be turned off during the degaussing time of the secondary winding (that is, the current from the primary side switching tube S 0 to the secondary winding of the primary side feedback flyback converter time to zero) is closed, when the fifth switch S5 is closed, the third current source I3 integrates the third capacitor C3 to obtain the voltage signal VCH at the upper end of the third capacitor C3 , which is the output signal of the degaussing time integration unit V CH ; the clear signal V RT2 controls the sixth switch S 6 , and closes the sixth switch S 6 when the secondary winding starts to degauss, thereby clearing the voltage V CH of the third capacitor C 3 , and the clear signal V RT3 controls The seventh switch S 7 closes the seventh switch S 7 at the end of the degaussing time to clear the voltage V CH of the third capacitor C 3 ; the voltage signal V CH at the upper end of the third capacitor C 3 is obtained by the average value unit The output signal V SAMPLE of the high-precision load current detection module.

如图4所示,自适应前沿消隐时间设置模块包括第一开关S1、第一电流源I1、第二电流源I2、第二电压-电流转换单元、第一电容C1、第一反相器U1和第二反相器U2,第一电流源I1为恒定电流源;第二电压-电流转换单元用于将高精度负载电流检测模块的输出信号VSAMPLE转换为对应的电流信号作用在第二电流源I2上,使得第二电流源I2的电流值与高精度负载电流检测模块的输出信号VSAMPLE成正比;第一电容C1一端连接第一反相器U1的输入端并通过第一开关S1后接地,另一端接地;第一电容C1通过第一电流源I1进行充电,通过第二电流源I2进行放电;第一开关S1由原边开关管的栅极控制信号VGATE控制其开关动作;第二反相器U2的输入端连接第一反相器U1的输出端,其输出端输出自适应前消隐信号VLEBAs shown in Figure 4, the adaptive leading edge blanking time setting module includes a first switch S 1 , a first current source I 1 , a second current source I 2 , a second voltage-current conversion unit, a first capacitor C 1 , a second An inverter U 1 and a second inverter U 2 , the first current source I 1 is a constant current source; the second voltage-current conversion unit is used to convert the output signal V SAMPLE of the high-precision load current detection module into a corresponding The current signal acts on the second current source I2 , so that the current value of the second current source I2 is proportional to the output signal V SAMPLE of the high-precision load current detection module; one end of the first capacitor C1 is connected to the first inverter The input terminal of U1 is grounded after passing through the first switch S1 , and the other end is grounded; the first capacitor C1 is charged by the first current source I1 , and discharged by the second current source I2 ; the first switch S1 is controlled by The gate control signal V GATE of the primary switching tube controls its switching action; the input terminal of the second inverter U2 is connected to the output terminal of the first inverter U1 , and its output terminal outputs an adaptive front blanking signal V LEB .

第一电容C1和第一开关S1并联,由第一电流源I1对第一电容C1充电,第二电流源I2对第一电容C1放电,第一电容C1上的电压为VC1;第一反相器U1将第一电容C1上的电压VC1与其自身阈值电压作比较,当VC1大于第一反相器U1自身阈值电压时第一反相器U1输出反相,第一反相器U1的输出信号通过第二反相器U2反相整形就得到了自适应前沿消隐信号VLEB。当原边反馈反激变换器工作在轻载或者低频情况下,原边开关管S0源极采样电阻上端电压信号VCS峰值较小,电流变化率di/dt较低,因此高精度负载电流检测模块的输出电压VSAMPLE降低,从而使得自适应前沿消隐信号VLEB的使能时间变短,膝点电压采样电路停止对辅助绕组电压信号VAUX采样的时间变短,不会将辅助绕组电压波形完全屏蔽掉,不影响系统电压反馈调节。当原边反馈反激变换器工作在重载或者高频情况下,原边开关管S0源极采样电阻上端电压信号VCS信号峰值较大,电流变化率di/dt较高,因此高精度负载电流检测模块的输出电压VSAMPLE增大,从而使得自适应前沿消隐信号VLEB的使能时间变长,膝点电压采样电路停止对辅助绕组电压信号VAUX采样的时间变长,足以屏蔽辅助绕组的电压振荡。The first capacitor C1 and the first switch S1 are connected in parallel, the first capacitor C1 is charged by the first current source I1 , the second current source I2 discharges the first capacitor C1 , the voltage on the first capacitor C1 is V C1 ; the first inverter U1 compares the voltage V C1 on the first capacitor C1 with its own threshold voltage, and when V C1 is greater than the first inverter U1’s own threshold voltage, the first inverter U 1 output is inverted, and the output signal of the first inverter U 1 is inverted and shaped by the second inverter U 2 to obtain the adaptive leading edge blanking signal V LEB . When the primary-side feedback flyback converter works at light load or low frequency, the peak value of the voltage signal V CS at the upper end of the source sampling resistor of the primary-side switching tube S 0 is small, and the current change rate di/dt is low, so the high-precision load current The output voltage V SAMPLE of the detection module is reduced, so that the enabling time of the adaptive leading edge blanking signal V LEB is shortened, and the time for the knee point voltage sampling circuit to stop sampling the auxiliary winding voltage signal V AUX is shortened, and the auxiliary winding will not be The voltage waveform is completely shielded and does not affect the system voltage feedback regulation. When the primary side feedback flyback converter works under heavy load or high frequency, the peak value of the voltage signal V CS signal at the upper end of the source sampling resistor of the primary switching tube S 0 is relatively large, and the current change rate di/dt is relatively high, so the high precision The output voltage V SAMPLE of the load current detection module increases, so that the enabling time of the adaptive leading edge blanking signal V LEB becomes longer, and the time for the knee point voltage sampling circuit to stop sampling the auxiliary winding voltage signal V AUX becomes longer, which is enough to shield The voltage of the auxiliary winding oscillates.

如图5所示为本实施例轻载下的工作实例波形图,原边反馈反激变换器工作在电感电流断续模式下,当原边开关管S0关断时刻,变压器漏感遗留能量较小,因此电路寄生参数中存储的能量也相对较小,辅助绕组电压信号VAUX振荡幅值较小,衰减时间较短,通过本发明设置的自适应前沿消隐时间较短,使得膝点电压采样电路能准确采样。As shown in Figure 5, the waveform diagram of the working example under the light load of this embodiment, the primary side feedback flyback converter works in the inductor current discontinuous mode, when the primary side switching tube S0 is turned off, the residual energy of the transformer leakage inductance is small, so the energy stored in the parasitic parameters of the circuit is also relatively small, the auxiliary winding voltage signal V AUX oscillation amplitude is small, and the decay time is short, and the adaptive leading edge blanking time set by the present invention is short, so that the knee point The voltage sampling circuit can sample accurately.

如图6所示为本实施例重载下的工作实例波形图,当原边开关管S0关断时刻,变压器漏感遗留能量较大,因此电路寄生参数中存储的能量也相对较大,辅助绕组电压信号VAUX振荡幅值较大,衰减时间较长,通过本发明设置的自适应前沿消隐时间较长,避免了辅助绕组高频振荡造成误采样。As shown in Figure 6, it is the waveform diagram of the working example under the heavy load of the present embodiment. When the primary switch tube S0 is turned off, the energy left by the leakage inductance of the transformer is relatively large, so the energy stored in the circuit parasitic parameters is also relatively large. The amplitude of the auxiliary winding voltage signal V AUX is larger and the decay time is longer. The self-adaptive leading edge blanking time set by the present invention is longer, which avoids false sampling caused by the high-frequency oscillation of the auxiliary winding.

如图7所示为本实施例低频工作实例波形图,电路工作在电感电流断续模式下,当原边开关管S0关断时刻,变压器漏感遗留能量较小,因此电路寄生参数中存储的能量也相对较小,辅助绕组电压信号VAUX振荡幅值较小,衰减时间较短,通过本发明设置的自适应前沿消隐时间较短,使得膝点电压采样电路能准确采样。As shown in Figure 7, it is the waveform diagram of the low-frequency working example of the present embodiment. The circuit works in the inductive current discontinuous mode. When the primary switch tube S0 is turned off, the residual energy of the transformer leakage inductance is small, so the parasitic parameters stored in the circuit The energy of V AUX is relatively small, the amplitude of the auxiliary winding voltage signal V AUX is small, and the decay time is short. The adaptive leading edge blanking time set by the present invention is short, so that the knee point voltage sampling circuit can accurately sample.

如图8所示为本实施例高频工作实例波形图,当原边开关管S0关断时刻,变压器漏感遗留能量较大,因此电路寄生参数中存储的能量也相对较大,辅助绕组电压信号VAUX振荡幅值较大,衰减时间较长,通过本发明设置的自适应前沿消隐时间较长,避免了辅助绕组高频振荡造成误采样。As shown in Figure 8, it is the waveform diagram of the example of high-frequency operation of this embodiment. When the primary switch tube S0 is turned off, the residual energy of the transformer leakage inductance is relatively large, so the energy stored in the parasitic parameters of the circuit is also relatively large, and the auxiliary winding The oscillation amplitude of the voltage signal V AUX is relatively large, and the decay time is relatively long. The self-adaptive leading edge blanking time set by the present invention is relatively long, which avoids mis-sampling caused by high-frequency oscillation of the auxiliary winding.

从上述具体实施例可知,本发明提出的自适应前沿消隐电路根据原边反馈反激变换器的负载电流和系统工作频率信息来产生自适应前沿消隐信号,避免了外界输入因素和负载变动情况下系统膝点电压误采样。当负载变重或系统工作频率提高,原边开关管关断后,辅助绕组电压振荡幅值变大,衰减时间变长,本发明设置的系统膝点电压采样时所需的前沿消隐时间自适应同步变长,避免振荡导致膝点电压误采样;当负载变轻或系统工作频率降低,原边开关管关断后,辅助绕组电压振荡幅值变小,衰减时间变短,系统膝点电压采样时所需的前沿消隐时间自适应同步变短;当系统轻载或空载输出时,相对固定前沿消隐时间的膝点电压采样,功耗降低,系统效率得到提升,且减小了系统误采样概率,提高了原边反馈反激变换器的工作稳定性。本发明的一种基于高精度负载电流检测技术的自适应前沿消隐电路可适用于任何场合的原边反馈反激变换器系统。As can be seen from the above specific embodiments, the adaptive leading edge blanking circuit proposed by the present invention generates an adaptive leading edge blanking signal according to the load current of the primary side feedback flyback converter and the system operating frequency information, avoiding external input factors and load changes In this case, the knee point voltage of the system is wrongly sampled. When the load becomes heavier or the operating frequency of the system increases, after the primary switching tube is turned off, the amplitude of the auxiliary winding voltage oscillation becomes larger and the decay time becomes longer. Adapt to synchronous lengthening to avoid false sampling of the knee point voltage caused by oscillation; when the load becomes lighter or the operating frequency of the system decreases, and the primary side switch is turned off, the auxiliary winding voltage oscillation amplitude becomes smaller, the decay time becomes shorter, and the knee point voltage of the system The leading edge blanking time required for sampling is shortened adaptively and synchronously; when the system is light-loaded or no-load output, compared with the knee point voltage sampling with a fixed leading edge blanking time, the power consumption is reduced, the system efficiency is improved, and the The system error sampling probability improves the working stability of the primary side feedback flyback converter. The self-adaptive leading edge blanking circuit based on the high precision load current detection technology of the present invention can be applied to the primary side feedback flyback converter system in any occasion.

以上通过一个具体实施例,对本发明的一种基于高精度负载电流检测技术的自适应前沿消隐电路进行了详细描述和分析,本领域的普通技术人员可以根据本发明公开的这些技术启示做出各种不脱离本发明实质的其他各种具体变形和组合,这些变形和组合仍然在本发明的保护范围之内。Through a specific embodiment above, a kind of self-adaptive frontier blanking circuit based on high-precision load current detection technology of the present invention has been described and analyzed in detail, those of ordinary skill in the art can make according to these technical revelations disclosed in the present invention Various other specific modifications and combinations without departing from the essence of the present invention, these modifications and combinations are still within the protection scope of the present invention.

Claims (3)

1.一种基于高精度负载电流检测技术的自适应前沿消隐电路,能够用于产生自适应前消隐信号控制原边反馈反激变换器的膝点电压采样;其特征在于,所述自适应前沿消隐电路包括高精度负载电流检测模块和自适应前沿消隐时间设置模块,1. an adaptive leading edge blanking circuit based on high-precision load current detection technology, which can be used to generate adaptive front blanking signals to control the knee point voltage sampling of the primary side feedback flyback converter; it is characterized in that the automatic The adaptive leading edge blanking circuit includes a high-precision load current detection module and an adaptive leading edge blanking time setting module, 所述高精度负载电流检测模块包括原边电流峰值采样单元、第一电压-电流转换单元、消磁时间积分单元和平均值单元,The high-precision load current detection module includes a primary current peak sampling unit, a first voltage-current conversion unit, a degaussing time integration unit and an average value unit, 所述原边电流峰值采样单元用于在所述原边反馈反激变换器的原边开关管导通时采样所述原边开关管源端电压获得采样电压,在所述原边开关管关断时将得到的所述采样电压的峰值进行保持,所述原边电流峰值采样单元在所述原边开关管的每个开关周期开始时将所述采样电压清零;The primary-side current peak sampling unit is used to sample the source terminal voltage of the primary-side switching tube to obtain a sampling voltage when the primary-side switching tube of the primary-side feedback flyback converter is turned on, and to obtain a sampling voltage when the primary-side switching tube is turned off. Hold the obtained peak value of the sampling voltage when it is off, and the primary current peak sampling unit clears the sampling voltage to zero at the beginning of each switching cycle of the primary switching tube; 所述第一电压-电流转换单元用于将所述原边电流峰值采样单元输出的所述采样电压转换为对应的采样电流;The first voltage-current conversion unit is used to convert the sampling voltage output by the primary current peak sampling unit into a corresponding sampling current; 所述消磁时间积分单元包括第五开关、第六开关、第七开关和第三电容,第五开关一端连接所述采样电流,另一端连接第三电容的一端并作为所述消磁时间积分单元的输出端,第三电容的另一端接地;第六开关接在所述消磁时间积分单元的输出端和地之间,第七开关接在所述消磁时间积分单元的输出端和地之间;其中第五开关仅在副边绕组消磁时间内闭合,所述副边绕组消磁时间为从所述原边开关管关断到所述原边反馈反激变换器副边绕组的电流降为零的时间;第六开关仅在所述原边开关管刚关断时闭合,第七开关仅在所述原边反馈反激变换器副边绕组的电流降为零时闭合;The degaussing time integration unit includes a fifth switch, a sixth switch, a seventh switch and a third capacitor, one end of the fifth switch is connected to the sampling current, and the other end is connected to one end of the third capacitor and serves as the degaussing time integration unit. The output terminal, the other end of the third capacitor is grounded; the sixth switch is connected between the output terminal of the degaussing time integration unit and the ground, and the seventh switch is connected between the output terminal of the degaussing time integration unit and the ground; wherein The fifth switch is closed only during the degaussing time of the secondary winding, and the degaussing time of the secondary winding is the time from when the primary switching tube is turned off to when the current of the secondary winding of the primary feedback flyback converter drops to zero ; The sixth switch is only closed when the primary side switch tube is just turned off, and the seventh switch is only closed when the current of the secondary winding of the primary side feedback flyback converter drops to zero; 所述平均值单元用于将所述消磁时间积分单元的输出信号进行滤波和求平均值后产生所述高精度负载电流检测模块的输出信号,所述高精度负载电流检测模块的输出信号与所述原边反馈反激变换器的负载电流和工作频率成正比;The average value unit is used to filter and average the output signal of the degaussing time integration unit to generate the output signal of the high-precision load current detection module, and the output signal of the high-precision load current detection module is consistent with the The load current of the primary side feedback flyback converter is proportional to the operating frequency; 所述自适应前沿消隐时间设置模块包括第一开关、第一电流源、第二电流源、第二电压-电流转换单元、第一电容、第一反相器和第二反相器,The adaptive leading edge blanking time setting module includes a first switch, a first current source, a second current source, a second voltage-current conversion unit, a first capacitor, a first inverter and a second inverter, 第一电流源为恒定电流源;第二电压-电流转换单元用于将所述高精度负载电流检测模块的输出信号转换为对应的电流信号作用在第二电流源上,使得第二电流源的电流值与所述高精度负载电流检测模块的输出信号成正比;The first current source is a constant current source; the second voltage-current conversion unit is used to convert the output signal of the high-precision load current detection module into a corresponding current signal to act on the second current source, so that the second current source The current value is proportional to the output signal of the high-precision load current detection module; 第一电容一端连接第一反相器的输入端并通过第一开关后接地,另一端接地;第一电容通过第一电流源进行充电,通过第二电流源进行放电;第一开关由所述原边开关管的栅极控制信号控制其开关动作;One end of the first capacitor is connected to the input end of the first inverter and grounded after passing through the first switch, and the other end is grounded; the first capacitor is charged by the first current source and discharged by the second current source; the first switch is controlled by the The gate control signal of the primary switch tube controls its switching action; 第二反相器的输入端连接第一反相器的输出端,其输出端输出所述自适应前消隐信号。The input end of the second inverter is connected to the output end of the first inverter, and the output end of the second inverter outputs the adaptive pre-blanking signal. 2.根据权利要求1所述的基于高精度负载电流检测技术的自适应前沿消隐电路,其特征在于,所述原边开关管的漏极连接所述原边反馈反激变换器中原边绕组的同名端,其源极连接所述原边电流峰值采样单元的输入端并通过采样电阻后接地;2. The adaptive leading edge blanking circuit based on high-precision load current detection technology according to claim 1, wherein the drain of the primary switch tube is connected to the primary winding in the primary feedback flyback converter The terminal with the same name, its source is connected to the input terminal of the primary current peak sampling unit and grounded after passing through the sampling resistor; 所述原边电流峰值采样单元包括第一运算放大器、第二开关、第二电容和第四开关,第一运算放大器的输入端作为所述原边电流峰值采样单元的输入端,其输出端通过第二开关后连接第二电容的一端并作为所述原边电流峰值采样单元的输出端输出所述采样电压,第二电容的另一端接地;第四开关接在所述原边电流峰值采样单元的输出端和地之间;第二开关由所述原边开关管的栅极控制信号控制其开关动作;第四开关仅在所述原边开关管的每个开关周期开始时闭合。The primary current peak sampling unit includes a first operational amplifier, a second switch, a second capacitor and a fourth switch, the input of the first operational amplifier is used as the input of the primary current peak sampling unit, and its output is passed through Connect one end of the second capacitor after the second switch and output the sampling voltage as the output terminal of the primary current peak sampling unit, and the other end of the second capacitor is grounded; the fourth switch is connected to the primary current peak sampling unit between the output terminal of the primary side switch and the ground; the switching action of the second switch is controlled by the gate control signal of the primary side switching tube; the fourth switch is only closed at the beginning of each switching cycle of the primary side switching tube. 3.根据权利要求1或2所述的基于高精度负载电流检测技术的自适应前沿消隐电路,其特征在于,所述平均值单元包括第二运算放大器、第一电阻和第四电容,第二运算放大器的输入端连接所述消磁时间积分单元的输出信号,其输出端连接第一电阻的一端,第一电阻的另一端输出所述高精度负载电流检测模块的输出信号并通过第四电容后接地。3. the adaptive leading edge blanking circuit based on high-precision load current detection technology according to claim 1 or 2, is characterized in that, described average value unit comprises the second operational amplifier, the first resistance and the 4th electric capacity, the 3rd The input end of the two operational amplifiers is connected to the output signal of the degaussing time integration unit, and its output end is connected to one end of the first resistor, and the other end of the first resistor outputs the output signal of the high-precision load current detection module and passes through the fourth capacitor back to ground.
CN202010588499.8A 2020-06-24 2020-06-24 Self-adaptive leading edge blanking circuit based on high-precision load current detection technology Expired - Fee Related CN111711364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010588499.8A CN111711364B (en) 2020-06-24 2020-06-24 Self-adaptive leading edge blanking circuit based on high-precision load current detection technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010588499.8A CN111711364B (en) 2020-06-24 2020-06-24 Self-adaptive leading edge blanking circuit based on high-precision load current detection technology

Publications (2)

Publication Number Publication Date
CN111711364A CN111711364A (en) 2020-09-25
CN111711364B true CN111711364B (en) 2023-03-21

Family

ID=72543106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010588499.8A Expired - Fee Related CN111711364B (en) 2020-06-24 2020-06-24 Self-adaptive leading edge blanking circuit based on high-precision load current detection technology

Country Status (1)

Country Link
CN (1) CN111711364B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113433375A (en) * 2021-07-05 2021-09-24 电子科技大学 Knee point detection and sample hold circuit
CN114825960B (en) * 2022-04-26 2023-04-25 电子科技大学 Real-time self-adaptive front edge blanking circuit
CN115224950B (en) * 2022-08-23 2025-02-25 无锡市德科立光电子技术股份有限公司 A constant current control system for a large leakage inductor primary-side feedback flyback converter
CN115296511B (en) * 2022-10-08 2023-01-13 青岛鼎信通讯股份有限公司 An output voltage sampling method and circuit applicable to the electric power field
CN116131577B (en) * 2023-02-16 2023-10-17 西安致芯微电子有限公司 Sampling control system, method, controller and primary side feedback AC/DC converter
CN119200491A (en) * 2024-11-28 2024-12-27 杭州得明电子有限公司 Adaptive blanking timing circuit control method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364857A (en) * 2011-02-01 2012-02-29 杭州士兰微电子股份有限公司 A primary-side controlled constant current switching power supply controller and method
CN104836444A (en) * 2015-04-24 2015-08-12 矽力杰半导体技术(杭州)有限公司 Self-adaptive blanking time control method and circuit
CN105471270A (en) * 2016-01-22 2016-04-06 矽力杰半导体技术(杭州)有限公司 Control circuit and control method with self-adaptive blanking time
US9654014B1 (en) * 2015-12-30 2017-05-16 Infineon Technologies Austria Ag Adaptive leading edge blanking time generation for current-mode switch-mode power supplies
CN109980945A (en) * 2019-04-11 2019-07-05 电子科技大学 A kind of adaptive lead-edge-blanking control circuit based on current sample
CN110596449A (en) * 2019-09-05 2019-12-20 深圳市依崇微电子科技有限公司 Knee Point Voltage Sampling System and Method Based on Primary Side Feedback Flyback Converter

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7995358B2 (en) * 2006-01-24 2011-08-09 System General Corp. Control circuit including adaptive bias for transformer voltage detection of a power converter
US9647560B2 (en) * 2014-07-24 2017-05-09 Dialog Semiconductor Inc. Secondary-side dynamic load detection and communication device
CN105763061B (en) * 2014-12-17 2018-05-29 万国半导体(开曼)股份有限公司 Flyback converter output current counting circuit and computational methods
CN105759135B (en) * 2014-12-17 2018-11-13 万国半导体(开曼)股份有限公司 The circuit and method of load condition are judged in flyback converter

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364857A (en) * 2011-02-01 2012-02-29 杭州士兰微电子股份有限公司 A primary-side controlled constant current switching power supply controller and method
CN104836444A (en) * 2015-04-24 2015-08-12 矽力杰半导体技术(杭州)有限公司 Self-adaptive blanking time control method and circuit
US9654014B1 (en) * 2015-12-30 2017-05-16 Infineon Technologies Austria Ag Adaptive leading edge blanking time generation for current-mode switch-mode power supplies
CN106936296A (en) * 2015-12-30 2017-07-07 英飞凌科技奥地利有限公司 For the self adaptation lead-edge-blanking time generation of current-mode switched-mode power supply
CN105471270A (en) * 2016-01-22 2016-04-06 矽力杰半导体技术(杭州)有限公司 Control circuit and control method with self-adaptive blanking time
CN109980945A (en) * 2019-04-11 2019-07-05 电子科技大学 A kind of adaptive lead-edge-blanking control circuit based on current sample
CN110596449A (en) * 2019-09-05 2019-12-20 深圳市依崇微电子科技有限公司 Knee Point Voltage Sampling System and Method Based on Primary Side Feedback Flyback Converter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Yongjiang Bai等.A novel constant current and constant voltage adaptive blanking regulation scheme for primary-side controlled flyback converter.2016,第1-8页. *

Also Published As

Publication number Publication date
CN111711364A (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN111711364B (en) Self-adaptive leading edge blanking circuit based on high-precision load current detection technology
CN106533214B (en) Control circuit and control method of switching power supply converter
CN109980945B (en) An Adaptive Leading Edge Blanking Control Circuit Based on Current Sampling
US10333418B2 (en) Control device and control method
CN201435677Y (en) A flyback switching power supply
US6366476B1 (en) Switching power supply apparatus with active clamp circuit
US7965523B2 (en) Switching power supply device
US8917068B2 (en) Quasi-resonant controlling and driving circuit and method for a flyback converter
US6005782A (en) Flyback converter with soft switching using auxiliary switch and resonant circuit
CN103490636B (en) For the quasi-resonance control method of Switching Power Supply, system and device
CN112054659A (en) Zero-voltage-conduction flyback circuit and control method and control circuit thereof
US11664736B2 (en) Auto-tuned synchronous rectifier controller
TWI664801B (en) Switching power, control apparatus and control method
CN113162426A (en) Control method and controller of isolated converter
CN108418435B (en) Synchronous rectification flyback DC-DC power supply conversion device
CN113708631B (en) Flyback converter and control method thereof
CN112072921A (en) Primary side regulation control system and control method of double-clamping ZVS Buck-Boost converter
CN110460239B (en) Active clamp flyback converter
CN113162418B (en) Self-adaptive quasi-resonance detection circuit and method
US12081109B2 (en) Switching converter and control circuit thereof
US6407934B1 (en) DC/DC switching power supply with optimally timed synchronous rectifier
CN112350581A (en) Flyback circuit and control method and control circuit thereof
CN113708633B (en) Flyback converter control method, flyback converter and control device
CN114726221A (en) Zero-voltage turn-on flyback switching power supply and its control chip and control method
CN113346753B (en) Light and no-load control method and circuit of clamp asymmetric half-bridge flyback converter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230321

CF01 Termination of patent right due to non-payment of annual fee