CN112482155B - A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation - Google Patents
A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation Download PDFInfo
- Publication number
- CN112482155B CN112482155B CN202011330058.4A CN202011330058A CN112482155B CN 112482155 B CN112482155 B CN 112482155B CN 202011330058 A CN202011330058 A CN 202011330058A CN 112482155 B CN112482155 B CN 112482155B
- Authority
- CN
- China
- Prior art keywords
- road
- treatment layer
- layer
- rolling
- curing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C21/00—Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/06—Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/10—Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
- E01C7/14—Concrete paving
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H3/00—Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
- E01H3/04—Fixed devices, e.g. permanently- installed flushing means
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Road Repair (AREA)
Abstract
本发明公开了一种抑制扬尘环保运输的路邦胶路面施工方法,其特征在于,包括:下层固化处理层施工工艺及上层固化处理层施工工艺;下层固化处理层施工工艺包括准备碎石层、施工放样、备料拌和混合料、摊铺整平、碾压、养生;上层固化处理层施工工艺掺加水泥、掺加固化剂、拌和机二次拌和、整形、碾压、养生;经抑制扬尘环保运输的路邦胶路面施工方法完成后获得的路邦胶路面,由于路邦胶的存在,矿山运输车在重载运输下越压越结实,同时本身能有效的抑制扬尘,起到降尘的效果。解决水泥路面施工周期长及沥青路面不耐压的问题,避免了水泥路面和沥青路面容易起扬尘的情况发生。
The invention discloses a Lubang rubber pavement construction method for suppressing dust and environmental protection transportation. Construction lofting, material preparation and mixing, paving and leveling, rolling, and curing; the construction process of the upper solidified treatment layer is mixed with cement, mixed with curing agent, secondary mixing by mixer, shaping, rolling, and curing; Due to the existence of Lubang glue, the road-bonded glue road obtained after the construction method of the transported Lubang rubber pavement is carried out, and the mining trucks are more and more compacted under heavy-duty transportation. It solves the problems of long construction period of cement pavement and inability of asphalt pavement to withstand pressure, and avoids the occurrence of dust on cement pavement and asphalt pavement.
Description
技术领域technical field
本发明涉及一种抑制扬尘环保运输的路邦胶路面施工方法,属于道路施工技术领域。The invention relates to a road-bonding rubber pavement construction method for suppressing dust and environmental protection transportation, and belongs to the technical field of road construction.
背景技术Background technique
在矿山开采时,首先需要对道路进行施工建设,而后再将矿料通过运输车运输至矿区之外;目前常采用沥青、水泥对道路进行施工建设,水泥路面建设周期长,同时在运输车重载运输的重压下,水泥路面容易起扬尘,对道路周边居住的居民造成污染;沥青在运输车重载运输的重压下容易发生变形损坏,一旦出现损坏就会有碎石颗粒,重压的运输车滚轮与碎石颗粒摩擦也会容易起扬尘对道路周边居住的居民造成污染。When mining, the road needs to be constructed first, and then the ore material is transported outside the mining area by transport vehicles. At present, asphalt and cement are often used for road construction. The construction period of cement pavement is long, and the transport vehicles are heavy Under the heavy load of transportation, the cement pavement is easy to raise dust, causing pollution to the residents living around the road; the asphalt is prone to deformation and damage under the heavy load of the transport vehicle. The friction between the rollers of the transport vehicle and the gravel particles will also easily raise dust and cause pollution to the residents living around the road.
发明内容SUMMARY OF THE INVENTION
为解决上述技术问题,本发明提供了一种抑制扬尘环保运输的路邦胶路面施工方法。In order to solve the above-mentioned technical problems, the present invention provides a road construction method of Lubang rubber pavement for suppressing dust and environmental protection transportation.
本发明通过以下技术方案得以实现。The present invention is achieved through the following technical solutions.
本发明提供的一种抑制扬尘环保运输的路邦胶路面施工方法,其特征在于,包括:下层固化处理层施工工艺及上层固化处理层施工工艺;The present invention provides a road construction method for Lubang rubber pavement for suppressing dust and environmental protection transportation, which is characterized by comprising: a construction process for a lower solidified treatment layer and a construction technology for an upper solidified treatment layer;
下层固化处理层施工工艺包括准备碎石层、施工放样、备料拌和混合料、摊铺整平、碾压、养生;The construction process of the lower solidified treatment layer includes preparing the gravel layer, setting out the construction, preparing the material and mixing the mixture, paving and leveling, rolling, and curing;
上层固化处理层施工工艺掺加水泥、掺加固化剂、拌和机二次拌和、整形、碾压、养生。The construction process of the upper solidified treatment layer is adding cement, adding curing agent, secondary mixing by mixer, shaping, rolling, and health preservation.
本发明的有益效果在于:经抑制扬尘环保运输的路邦胶路面施工方法完成后获得的路邦胶路面,由于路邦胶的存在,矿山运输车在重载运输下越压越结实,同时本身能有效的抑制扬尘,起到降尘的效果。解决水泥路面施工周期长及沥青路面不耐压的问题,避免了水泥路面和沥青路面容易起扬尘的情况发生。The beneficial effect of the present invention is that: the road-bonding rubber pavement obtained after the road-bonding rubber pavement construction method for suppressing fugitive dust and environmental protection transportation is completed, due to the existence of the road-bonding glue, the mining truck is more compacted and stronger under heavy-load transportation, and at the same time, it can Effectively suppress dust, and play a role in dust reduction. It solves the problems of long construction period of cement pavement and inability of asphalt pavement to withstand pressure, and avoids the occurrence of dust on cement pavement and asphalt pavement.
附图说明Description of drawings
图1是路邦胶路面施工应用的运输道路结构俯视示意图;Figure 1 is a schematic top view of the haul road structure used in the construction and application of Lubang rubber pavement;
图2是路邦胶路面施工应用的运输道路结构安装路灯运输道路断面示意图;Figure 2 is a schematic cross-sectional view of the haul road structure and installation of street lamps used in the construction and application of Lubang rubber pavement;
图3是路邦胶路面施工应用的运输道路结构安装喷雾器运输道路断面示意图;Figure 3 is a schematic cross-sectional view of the haul road structure installation sprayer haul road used in the construction and application of Lubang rubber pavement;
图4是路邦胶路面施工应用的运输道路结构种植草皮、灌木运输道路断面示意图;Figure 4 is a schematic diagram of the cross-section of the transportation road structure planting turf and shrubs used in the construction and application of Lubang rubber pavement;
图5是路邦胶路面施工应用的运输道路结构DCS控制系统、喷雾器、粉尘探测器、收集池断面示意图;Figure 5 is a schematic cross-sectional view of the haul road structure DCS control system, sprayer, dust detector, and collection tank used in Lubang rubber pavement construction;
图6是路邦胶路面施工应用的运输道路结构排水沟安装调节装置结构示意图;Figure 6 is a schematic structural diagram of the installation and adjustment device for the drainage ditch of the transportation road structure used in the construction of Lubang rubber pavement;
具体实施方式Detailed ways
下面进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。The technical solutions of the present invention are further described below, but the claimed scope is not limited to the description.
本发明的一种抑制扬尘环保运输的路邦胶路面施工方法,包括下层固化处理层施工工艺及上层固化处理层施工工艺;The invention relates to a road construction method for Lubang rubber pavement for suppressing dust and environmental protection transportation, including a construction process for a lower solidified treatment layer and a construction technology for an upper solidified treatment layer;
下层固化处理层施工的工艺包括:The construction process of the lower curing treatment layer includes:
准备碎石层:将碎石进行整平铺设在路基上,采用12t或以上压路机静碾压至碎石层表面无轮迹为止,保证应有的路拱;Preparing the gravel layer: level the gravel on the roadbed, and use a 12t or more road roller to statically compact it until the surface of the gravel layer has no wheel marks, so as to ensure the proper road arch;
作为优选的,碎石层上铺筑防渗土工膜,铺设好后用砂袋压住,防渗土工膜间进行焊接后铺筑固化土,渗土工膜能避免水流防渗入碎石层内。Preferably, an anti-seepage geomembrane is laid on the gravel layer, which is pressed with sand bags after laying, and solidified soil is laid after welding between the anti-seepage geomembranes. The seepage geomembrane can prevent the water flow from seeping into the gravel layer. .
作为优选的,准备碎石层碾压时,部分碎石层如发生“弹簧”现象,应采用挖开、掺石灰或水泥重新回填进行处理,保证碾压后碎石层的强度。Preferably, when preparing the crushed stone layer for rolling, if a "spring" phenomenon occurs in part of the crushed stone layer, it should be processed by excavation, lime or cement refilling to ensure the strength of the crushed stone layer after rolling.
施工放样:在碎石层上恢复画出中线,中线直线段碎石层两侧每15~20m设置一个指示桩,指示桩上标记出需固化处理层边缘的设计高程,便于对施工进行明显提示。Construction stakeout: restore the center line on the gravel layer, and set up an indicator pile every 15-20m on both sides of the gravel layer in the straight line section of the center line. .
备料拌和混合料:首先,晾晒素土,并挑除树根、草皮等杂物;其次,按每一立方米素土:石灰:固化剂为7000:3000:1.5备料;再次,晾晒后的素土和石灰按比例70:30混合拌1~2遍并堆拌,其过程中使大粒径土自然滑落,然后用推土机排压、碾碎,至堆拌最大粒径不超过15mm为止;而后,加水拌和不少于3遍至均匀,含水量率为1~2%,灰土最大粒径不超过15mm为止,闷放1~2d;最后,将路帮胶固化剂与水按照150~200:1比例进行稀释后均匀喷洒入灰土中,待掺入路帮胶固化剂40min初凝后,继续不少于3遍拌匀。Prepare and mix the mixture: first, dry the plain soil, and pick out the roots, turf and other sundries; secondly, prepare materials according to each cubic meter of plain soil: lime: curing agent is 7000:3000:1.5; Soil and lime are mixed for 1 to 2 times at a ratio of 70:30 and piled up. During the process, the large-sized soil naturally slides down, and then the bulldozer is used to discharge pressure and crush until the maximum particle size of the pile does not exceed 15mm; then , add water and mix for no less than 3 times until uniform, the moisture content is 1-2%, the maximum particle size of the lime soil is not more than 15mm, and it is suffocated for 1-2d; 1 ratio is diluted and then sprayed into the lime soil evenly. After the initial setting of the road gang glue curing agent is added for 40 minutes, continue to mix for no less than 3 times.
作为优选的,素土与石灰堆拌时,第一次加70%~100%预定计量的石灰进行拌和,闷放1~2d;此后补足需要的石灰,再进行二次拌和,避免素土塑性指数较高,较难拌和,提高素土与石灰堆拌速度。Preferably, when plain soil is mixed with lime, add 70% to 100% of a predetermined amount of lime to mix for the first time, and let it stagnate for 1 to 2 days. The higher the index is, the more difficult it is to mix, and the mixing speed of plain soil and lime is improved.
摊铺整平:拌和混合料运到道路中,在直线段,平地机由两侧向路中心刮平;在平曲线,平地机由内侧向外侧进行刮平;用推土机在初平的路段上快速排压一遍,以暴露潜在的不平整;对于局部低洼处,应将其表层5cm以上翻松,并用新的拌和混合料进行找平;再用平地机整形一次,应将高出的料直接刮出路外,不应形成薄层填补现象;每次整形都应达到规定的坡度和路拱,并应注意接缝必须顺势平整。Paving and leveling: The mixed material is transported to the road. In the straight section, the grader is leveled from both sides to the center of the road; in the flat curve, the leveler is leveled from the inside to the outside; the bulldozer is used to level the road section at the beginning. Quickly release the pressure once to expose potential unevenness; for local low-lying places, the surface layer should be loosened by more than 5cm, and leveled with a new mixing mixture; then use a grader to shape again, and the raised material should be scraped directly Outside the way, there should be no thin layer filling phenomenon; each shaping should reach the specified slope and road arch, and it should be noted that the joints must be smoothed out.
碾压:整形后当混合料的含水量为最佳含水量为1%~2%时,应立即用轻型压路机并配合12t压路机进行碾压,静压两遍后,采用18t以上三轮压路机进行不挂振碾压,碾压时应由两侧向路中心碾压,需重叠1/2轮宽,后轮必须超过两段的接缝处,碾压6~8遍;压路机的碾压速度,头两遍以1.5~1.7km/h为宜,以后以2.0~2.5km/h为宜。Rolling: After shaping, when the optimum water content of the mixture is 1% to 2%, it should be rolled with a light-duty road roller and a 12t roller immediately. After static pressing twice, a three-wheel roller over 18t should be used Rolling without vibration, should be rolled from both sides to the center of the road, overlapping 1/2 of the wheel width, the rear wheel must exceed the joint of the two sections, and rolled 6 to 8 times; the rolling speed of the road roller , 1.5 ~ 1.7km/h is appropriate for the first two times, and 2.0 ~ 2.5km/h is appropriate after that.
作为优选的,在所述碾压的步骤中,应使各部分碾压到的次数尽量相同,路面的两侧应多压2~3遍;严禁压路机在已完成的或正在碾压的路段上调头或急刹车,应保证固化处理层表面不受破坏,碾压过程中,固化处理层的表面应始终保持湿润,如水分蒸发过快,应及时补洒少量水,但严禁洒大水碾压;在碾压结束之前,用平地机再终平一次,使其纵向顺适,路拱符合设计要求;终平应仔细进行,必须将局部高出部分刮除并扫出路外;对局部低洼之处,不在进行找补,可留待铺筑上层时处理。Preferably, in the rolling step, the number of times each part is rolled should be the same as possible, and the two sides of the road should be pressed more than 2 to 3 times; Turn around or brake suddenly, the surface of the cured layer should not be damaged. During the rolling process, the surface of the cured layer should always be kept moist. If the water evaporates too quickly, a small amount of water should be added in time, but it is strictly forbidden to sprinkle a lot of water for rolling. ; Before the end of the rolling, use a grader to finish leveling again to make it longitudinally comfortable and the road arch meets the design requirements; the final leveling should be carried out carefully, and the partially raised part must be scraped off and swept out of the road; At the place, no repairs are being carried out, and it can be left to be handled when the upper layer is paved.
养生:对碾压完成后的道路进行7天的洒水养护,洒水不应过湿或忽干忽湿,每次洒水后,应用两轮压路机将表层压实。Health preservation: The road after the rolling is carried out for 7 days of watering maintenance. The watering should not be too wet or dry and wet. After each watering, two-wheel road rollers should be used to compact the surface layer.
在已经完成的下层固化处理层上进行的上层固化处理层施工工艺包括:The construction process of the upper cured treatment layer on the completed lower cured treatment layer includes:
掺加水泥:在下层固化处理层表面上放置未起封水泥袋,将水泥粉均摊铺在下层固化处理层表面上后,表面应没有空白位置,也没有水分过分集中地点,而后摊铺的灰土与水泥按照体积比例为95:5拌和均匀,推土机排压正。Add cement: place unsealed cement bags on the surface of the lower solidified layer, and spread the cement powder evenly on the surface of the lower solidified layer. The lime soil and cement are mixed evenly according to the volume ratio of 95:5, and the bulldozer discharge pressure is positive.
掺加固化剂:路帮胶固化剂与水按照150~200:1稀释,均匀喷洒在排压后的石灰土层表面;作为优选的,喷洒固化剂水溶液时,喷洒应均匀,不遗漏,中途不停车,应防止喷洒量过大。Add curing agent: The road gang glue curing agent and water are diluted at a ratio of 150 to 200:1, and sprayed evenly on the surface of the lime soil layer after pressure relief; as an option, when spraying the curing agent aqueous solution, the spraying should be uniform and not omitted. Do not stop, should prevent excessive spraying.
拌和机二次拌和:拌和机对喷洒固化剂的石灰土层由两侧拌向中心进行搅拌,并破坏下层固化处理层,上、下层之间不得留有未掺拌的“素土”夹层,使得上、下两层的颗粒分子紧密吸附;Secondary mixing of the mixer: The mixer stirs the lime-soil layer sprayed with the curing agent from both sides to the center, and destroys the lower solidified layer. Make the particles in the upper and lower layers adsorb tightly;
作为优选的,破坏下层固化处理层深度为1cm;拌和应有重叠和翻透,并不得漏拌,且固化类混合料拌和颜色应一致,半和应不少于三遍或粒径不超过15mm止。Preferably, the depth of the damaged lower solidified treatment layer is 1cm; the mixing should overlap and penetrate, and must not be mixed, and the mixing color of the solidified mixture should be consistent, and the half-sum should not be less than three times or the particle size should not exceed 15mm end.
整形:再用平地机整形一次,应将高出料直接刮出路外,不应形成薄层填补现象;整形达到规定的坡度和路拱,并应注意接缝必须顺势平整。Shaping: Shaping again with a grader, the high discharge material should be scraped out of the road directly, and a thin layer should not be formed; the shaping should reach the specified slope and road arch, and it should be noted that the joints must be smoothed according to the trend.
碾压:整形后,当混合料的含水量为最佳含水量1%~2%时,应立即用轻型压路机并配合12t压路机全宽内进行碾压,静压两遍后,然后采用18t以上三轮压路机挂强振进行碾压,压路机的碾压速度,头两遍以1.5~1.7km/h为宜,以后以2.0~2.5km/h为宜;Rolling: After shaping, when the moisture content of the mixture is the optimum moisture content of 1% to 2%, it should be rolled immediately with a light-duty road roller in conjunction with the full width of a 12t roller. The three-wheel road roller is subjected to strong vibration for rolling, and the rolling speed of the road roller is preferably 1.5-1.7 km/h for the first two times, and 2.0-2.5 km/h for the later times;
作为优选的,在所述碾压时,严禁压路机在已完成的或正在碾压的路段上调头或急刹车,应保证固化剂固化水泥石灰碎石土表面不受破坏;在碾压结束之前,再终平一次,使其纵向顺适,路拱符合设计要求。Preferably, during the rolling, it is strictly forbidden for the road roller to turn around or brake suddenly on the completed or rolling road section, and it should be ensured that the surface of the cement, lime, and gravel soil cured by the curing agent is not damaged; It is leveled again to make it longitudinally comfortable, and the road arch meets the design requirements.
养生:对碾压完成后的道路进行7天的洒水养护,洒水不应过湿或忽干忽湿,每次洒水后,应用两轮压路机将表层压实。Health preservation: The road after the rolling is carried out for 7 days of watering maintenance. The watering should not be too wet or dry and wet. After each watering, two-wheel road rollers should be used to compact the surface layer.
作为优选的,在养生期间为了防止出现干缩裂缝,采用覆盖现场土或加盖土工膜保水养生措施,避免太阳爆晒,养生期间除洒水车外,应封闭交通;如塑性指数过大,为防止出现裂缝,洒水养生不得间断,尤其在高温下。Preferably, in order to prevent shrinkage cracks during the health preservation period, cover the site soil or cover with geomembrane for water retention and health preservation measures to avoid sun exposure. During the health preservation period, except for sprinklers, traffic should be closed; if the plasticity index is too large, the To prevent cracks, watering should not be interrupted, especially at high temperatures.
作为优选的,路帮胶固化剂要按150~200:1体积比用水稀释固化剂浓缩液,稀释浓溶液时,应把固化剂浓缩液加入水中,不要把水加到固化剂浓缩液中,防止稀释放热发生飞溅。As a preference, the road gang glue curing agent should be diluted with water in a volume ratio of 150-200:1. When diluting the concentrated solution, the curing agent concentrate should be added to water, and water should not be added to the curing agent concentrate. Prevents splashing due to exothermic dilution.
经上述抑制扬尘环保运输的路邦胶路面施工方法完成后获得的路邦胶路面,由于路邦胶的存在,矿山运输车在重载运输下越压越结实,同时本身能有效的抑制扬尘,起到降尘的效果。解决水泥路面施工存在周期长及沥青路面不耐压的问题,避免了水泥路面和沥青路面容易起扬尘的情况发生。After the above-mentioned road-bond rubber pavement construction method for suppressing dust and environmental protection transportation is completed, the road-bonding rubber pavement obtained. Due to the existence of road-bonding rubber, the mining trucks are more compacted and stronger under heavy-duty transportation, and at the same time, they can effectively suppress dust and reduce the occurrence of dust. to the effect of dust suppression. It solves the problems of long period of cement pavement construction and the inability of asphalt pavement to withstand pressure, and avoids the occurrence of dust on cement pavement and asphalt pavement.
作为本发明路邦胶路面的应用,下述提供了路邦胶路面施工后的路面使用在道路上的结构。As the application of the Lubang rubber pavement of the present invention, the following provides the structure of the road surface used on the road after the Lubang rubber pavement is constructed.
参见图1至图6所示。See Figures 1 to 6.
一种矿山作业智能节能环保安全运输道路结构,包括:边坡1,边坡1下部坡脚处设有排水沟2;排水沟2外侧为降低运输过程中扬尘的路邦胶路面3;路邦胶路面3的外侧设有安全防撞墙4;安全防撞墙4上安装多个间隔的路灯5、多个间隔的喷雾器6,路灯5与喷雾器6交叉间隔安装,边坡1外侧面至安全防撞墙4内面存存在使运输车通过的间隔空间;安全防撞墙4内部埋入供水管道、供电线和控制线12,避免供水管道、供电线和控制线占用其它空间;An intelligent, energy-saving, environment-friendly, and safe transportation road structure for mining operations, comprising: a
路灯5及边坡1上安装有粉尘探测器7,粉尘探测器7对路邦胶路面3路面上的粉尘进行探测,控制线12经路邦胶路面3、排水沟2底部连接粉尘探测器7;A
边坡1顶部设有收集池8,收集池8内安装有泵,泵经安装有电控阀的管道与喷雾器6连通;收集池8处于边坡1上的高位,利用重力势能对喷雾器6进行供水,降低泵的能源消耗,达到进一步节能的效果。The top of the
所述路邦胶路面3上层面以坡度系数i为2%向排水沟2倾斜的倾斜面,使得水流从路邦胶路面3上层面流至排水沟2内,提高路邦胶路面3的干燥耐磨程度和防滑安全性;所述排水沟2的末端设有蓄水池,蓄水池经管道和泵与收集池8连通。The upper layer of the
所述路灯5上的粉尘探测器7间隔10米;所述边坡1上的粉尘探测器7间隔20米。所述安全防撞墙4由边坡1开挖筛分后的土质堆砌而成,提高开挖时边坡1土质的利用,避免需要对土质再次转运运输花费的成本。The
所述防撞墙4的侧面种有种植有草皮9,其顶部种植有灌木10,两株灌木的间距为2.5米。间距要根据种植的灌木大小来确定;草皮9、灌木10能吸收运输车排放的尾气进行光合作用,草皮9错乱分布的草叶及灌木10错乱分布的树叶对运输车与路邦胶路面3摩擦产生的杂音声波进行吸收,进一步降低运输道路的噪音,草皮9、灌木10的植物蒸腾作用排出的水汽与运输车与路邦胶路面3摩擦产生的尘埃混合凝降,进一步降尘。The side of the crash wall 4 is planted with
所述安全防撞墙4的横截断面的锥形体,其高度为1.2至2米,提高安全防撞墙4对运输车防护,同时使安全防撞墙4本身结构稳定。The safety anti-collision wall 4 has a cone-shaped cross-section with a height of 1.2 to 2 meters, which improves the protection of the safety anti-collision wall 4 against transport vehicles, and at the same time makes the safety anti-collision wall 4 structurally stable.
还包括DCS控制系统,粉尘探测器7的数据输出端经控制线12与DCS控制系统的输入端连接,DCS控制系统的数据输出端经控制线12与喷雾器6、泵、电控阀数据输入端连接。It also includes a DCS control system. The data output end of the
所述多个喷雾器6两两间隔5米,可根据实际情况可以调整,喷雾器6由对雨水收集并处于高位的收集池8进行供水。The plurality of
所述收集池8内安装水位检测器11,水位检测器11经导线与DCS控制系统连接。A
所述边坡1及边坡1下部的坡脚坡度系数i为1:0.3,提高水流在边坡1流至排水沟2的流速,避免水体在边坡1上发生渗透造成边坡1塌方损坏。The slope coefficient i of the
所述排水沟2上安装有对雨水涌流起缓存的调节装置,调节装置包括两个本身可伸缩的板体21、顶部安装有可转动动滑轮22的支撑杆23、吸水体25,所述板体21由两个大小不同的板可伸缩套合,板体21上设有通孔,两个板体21可转动铰接,吸水海绵构成的吸水体25经绕在动滑轮22上的拉绳24与两个板体21铰接处固定,两个板体21分别对应分布在边坡1下部的坡脚、路邦胶路面3上;当下大雨时,吸水体25吸水达到一定重量后重力拉动两个板体21伸缩呈现倾斜,大雨水在边坡1形成的涌流在倾斜的板体21获得环形缓冲,同时,夹杂枯枝等杂质的涌流循环在板体21环形冲刷,板体21的通孔将雨水滤至排水沟2内,枯枝等杂质被混合在水流内运动,避免将板体21的通孔堵住,避免了排水沟2内出现枯枝等杂质堆积堵塞,同时降低大雨水在边坡1形成的涌流对边坡1下部的坡脚的冲刷,保证道路的性能安全。The
雨水停后,吸水体25脱水,板体21在重力下自动下降缩回形成平板盖在排水沟2上。After the rain stops, the
一种矿山作业智能节能环保安全运输道路的使用方法,包括步骤如下:A method for using intelligent, energy-saving, environment-friendly, and safe transportation roads for mining operations, comprising the following steps:
步骤一,对各个用电设备进行通电,粉尘检测器7对路邦胶路面3上运输车产生的粉尘进行检测,检测的数据通过控制线12与DCS控制系统连接;
步骤二,当粉尘检测器7检测的粉尘检测数据为≥10mg/m3时,DCS控制系统控制喷雾器6得水对路邦胶路面3进行喷雾降尘;
步骤三,当粉尘检测器7检测的粉尘检测数据为<10mg/m3时,DCS控制系统控制喷雾器6停水对路邦胶路面3进行喷雾降尘;
步骤四,收集池8内的水位检测器11检测到收集池8内的水位下降后,DCS控制系统发出报警信息,通过泵从蓄水池对收集池8进行补水或人工使用洒水车补水。Step 4: After the
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011330058.4A CN112482155B (en) | 2020-11-24 | 2020-11-24 | A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011330058.4A CN112482155B (en) | 2020-11-24 | 2020-11-24 | A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112482155A CN112482155A (en) | 2021-03-12 |
| CN112482155B true CN112482155B (en) | 2022-04-19 |
Family
ID=74933801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202011330058.4A Active CN112482155B (en) | 2020-11-24 | 2020-11-24 | A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112482155B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115217009B (en) * | 2022-08-22 | 2024-05-24 | 浙江华东工程建设管理有限公司 | Photovoltaic power plant environment-friendly road construction equipment and road structure |
| CN116791429A (en) * | 2023-06-26 | 2023-09-22 | 唐山三友矿山有限公司 | Mining area road restoration method |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2003200930B2 (en) * | 1998-08-06 | 2004-01-22 | Ecoflex Limited | Tyre foundation structure |
| CN210068238U (en) * | 2019-04-27 | 2020-02-14 | 南京同力建设集团股份有限公司 | Difficult tunnel escape canal that blocks up |
| CN111919629A (en) * | 2020-09-14 | 2020-11-13 | 中国科学院西北生态环境资源研究院 | A plant living system for side slope ecological remediation |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2422293A1 (en) * | 2000-09-15 | 2002-03-21 | Syngenta Participations Ag | Plant genes, the expression of which are altered by pathogen infection |
| US7588395B2 (en) * | 2005-01-13 | 2009-09-15 | Carpenter Thomas J | Erosion control transition mat |
| CN100535258C (en) * | 2007-08-24 | 2009-09-02 | 张京杰 | Using method for soil curing agent |
| CN101265060A (en) * | 2008-04-25 | 2008-09-17 | 天津市市政工程设计研究院 | A kind of soil stabilization material and its application method on heavy-duty soft ground |
| CN103011729A (en) * | 2012-10-12 | 2013-04-03 | 包钢集团巴润矿业有限责任公司 | Method for controlling pavement dust pollution of transportation road in mining area |
| CN103741567A (en) * | 2013-12-17 | 2014-04-23 | 柳州东风化工股份有限公司 | Method for curing base course and subbase of pavement by adopting soil stabilizing agent |
| CN108660890A (en) * | 2017-03-31 | 2018-10-16 | 上海道基环保科技有限公司 | Native construction method is stablized in a kind of road cement stabilization soil and environment-friendly water-based solidification |
| US20200100639A1 (en) * | 2018-10-01 | 2020-04-02 | International Business Machines Corporation | Robotic vacuum cleaners |
-
2020
- 2020-11-24 CN CN202011330058.4A patent/CN112482155B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2003200930B2 (en) * | 1998-08-06 | 2004-01-22 | Ecoflex Limited | Tyre foundation structure |
| CN210068238U (en) * | 2019-04-27 | 2020-02-14 | 南京同力建设集团股份有限公司 | Difficult tunnel escape canal that blocks up |
| CN111919629A (en) * | 2020-09-14 | 2020-11-13 | 中国科学院西北生态环境资源研究院 | A plant living system for side slope ecological remediation |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112482155A (en) | 2021-03-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106759825B (en) | Construction method of sponge urban green land water storage system | |
| JP5258898B2 (en) | Pavement body, pavement construction method | |
| CN112482155B (en) | A road construction method of road-bond rubber pavement for suppressing dust and environmental protection transportation | |
| CN209779370U (en) | Urban road rainwater is collected and is utilized and discharge system | |
| CN206928164U (en) | A kind of drainage type concrete road | |
| CN204589749U (en) | Novel ecological parking lot road structure | |
| CN205420953U (en) | Ground surface parking lawn | |
| CN206256454U (en) | A kind of massif ecological slope protection structure | |
| CN212671032U (en) | Greening roof structure | |
| CN107386048A (en) | Underground heat snow melt, noise reduction suitable for the north cut dirty rainwater-collecting ecological pavement | |
| CN104652238A (en) | Barrier-free base construction method for urban roads | |
| CN207362616U (en) | Permeable brick paving structure | |
| CN111535098A (en) | Rainwater drainage system for green belts and sidewalks of town roads and construction method | |
| CN107447620A (en) | A kind of penetrated asphalt pavement and its construction method | |
| CN105544342B (en) | A kind of urban road delay discharge structure based on porous pavement | |
| CN112030654A (en) | Exposed aggregate pervious concrete construction method for water environment treatment | |
| CN110240280B (en) | Rainwater purification system of garden road greening isolation belt | |
| CN207109486U (en) | A kind of water circulation dedusting greening road | |
| CN112459827B (en) | Intelligent energy-saving environment-friendly safe transportation road structure for mine operation | |
| CN107447617B (en) | A dust-proof curing process for temporary construction roads | |
| CN207512769U (en) | A kind of vertical greening retaining wall | |
| CN207143648U (en) | A kind of ubbase drain system of embedding careless brick surface layer | |
| CN209759936U (en) | Permeable pavement structure based on building rubbish crushed aggregates | |
| CN218711935U (en) | Artificial lawn without colloidal particles | |
| CN110924252A (en) | Road surface structure for preventing road dust and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Construction Method of Lubang Rubber Pavement for Suppressing Dust and Environmentally Friendly Transportation Granted publication date: 20220419 Pledgee: Shenzhen Deyuan Commercial Factoring Co.,Ltd. Pledgor: SINOHYDRO BUREAU 9 Co.,Ltd. Registration number: Y2025980021256 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |