[go: up one dir, main page]

CN112663595B - Adjusting and fixing device for first root locking section steel of underground continuous steel wall - Google Patents

Adjusting and fixing device for first root locking section steel of underground continuous steel wall Download PDF

Info

Publication number
CN112663595B
CN112663595B CN202011394074.XA CN202011394074A CN112663595B CN 112663595 B CN112663595 B CN 112663595B CN 202011394074 A CN202011394074 A CN 202011394074A CN 112663595 B CN112663595 B CN 112663595B
Authority
CN
China
Prior art keywords
section steel
rotating shaft
steel
section
special
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011394074.XA
Other languages
Chinese (zh)
Other versions
CN112663595A (en
Inventor
龚妍
范斌
王海俊
李耀良
钮文敖
丁东强
罗云峰
李吉勇
徐伟
高庆荣
朱德勇
顾蓓瑛
沈豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN202011394074.XA priority Critical patent/CN112663595B/en
Publication of CN112663595A publication Critical patent/CN112663595A/en
Application granted granted Critical
Publication of CN112663595B publication Critical patent/CN112663595B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to an adjusting and fixing device for a head root locking port section steel of an underground continuous steel wall, which comprises a rotating shaft fixing base, a rotating shaft, an inclined stay bar and a head root locking port section steel special top segment, wherein the head root locking port section steel special top segment is fixedly connected to the top end of the head root section steel through a connecting plate and a bolt, so that the head root locking port section steel special top segment is higher than the ground; the upper surface of the special top section of the first locking notch section steel is fixedly connected with a rotating shaft fixing base and a rotating shaft; an inclined stay bar is connected between the special top section of the first-root lock-notch steel and the guide wall, the verticality of the first-root steel is adjusted through the special top section of the first-root lock-notch steel, and the first-root steel is fixed. By using the invention, the first section steel can be accurately aligned and fixed, a reliable reference is provided for subsequent construction, and the construction efficiency is improved.

Description

Adjusting and fixing device for first root locking section steel of underground continuous steel wall
Technical Field
The invention relates to an underground continuous steel wall construction device, in particular to an adjusting and fixing device for a first locking section steel of an underground continuous steel wall.
Background
In the inserting and placing process of the fore shaft section steel of the underground continuous steel wall, the inserting and positioning and the vertical precision control of the first section steel are very important, and the construction quality and the progress control of the whole engineering are influenced. Therefore, a device for adjusting and fixing the first locking notch section steel when the section steel is inserted in the underground continuous steel wall process needs to be designed.
Disclosure of Invention
The invention aims to provide an adjusting and fixing device for a first locking section steel of an underground continuous steel wall inserted section steel, which ensures the vertical inserting precision and firm fixation of the first section steel in the construction process of inserting the locking section steel of the underground continuous steel wall.
In order to achieve the above object, the present invention provides the following technical solutions:
a device for adjusting and fixing a first locking section steel of an underground continuous steel wall comprises a rotating shaft fixing base, a rotating shaft, an inclined stay bar and a first locking section steel special top segment, wherein the first locking section steel special top segment is fixedly connected to the top end of the first locking section steel through a connecting plate and a bolt, so that the first locking section steel special top segment is higher than the ground; the upper surface of the special top section of the first locking section steel is fixedly connected with a rotating shaft fixing base and a rotating shaft; an inclined stay bar is connected between the special top section for the first-root locking section steel and the guide wall, the perpendicularity of the first-root section steel is adjusted through the special top section for the first-root locking section steel, and the first-root section steel is fixed.
Furthermore, the special top section for the first locking section steel is also provided with a temporary holding rod seat with adjustable height and a special catch wheel, so that the second section steel and the first section steel can be conveniently inserted.
Further, the length of the inclined stay bar is adjusted through a screw pair provided with left and right backward and forward screw teeth, a pair of rotating shaft seats are installed at the bottom of the inclined stay bar, one end of each rotating shaft seat is welded with the inclined stay bar, the other end of each rotating shaft seat is fixed on the guide wall through a bar-planting screw, the two ends of each rotating shaft seat are connected through a pin shaft, and the top of the inclined stay bar is connected with the top end of the top section special for the first locking section steel through a cross beam through a bolt.
Furthermore, when the section steel is inserted in place, the inclined stay bar is matched with the rotating shaft and the rotating shaft fixing base for use, and the section steel is straightened, so that the verticality of the first section steel is ensured.
Further, the pivot is installed in the mounting hole of reserving in the fore part special top segment's of fore part shaped steel flange plate lower part to it is fixed with fore part shaped steel, pivot unable adjustment base passes through the pinhole position department of round pin axle suit at the pivot both ends.
Further, when the special top segment section of head root fore shaft shaped steel is inserted to head root shaped steel, behind the installation head root shaped steel connecting plate, wear the dress pivot on the pivot unable adjustment base, continue afterwards to insert head root shaped steel down and touch the guide wall to pivot unable adjustment base's bottom plate and end, it is fixed with pivot unable adjustment base's bottom plate with the bar planting bolt.
Furthermore, the rotating shaft and the rotating shaft fixing base are matched with the inclined support rod for use, the posture of the section steel is adjusted, and the section steel is fixed on the guide wall after being straightened.
The invention has the beneficial effects that: in the inserting and placing process of the locking section steel of the underground continuous steel wall, the inserting and positioning and vertical precision control of the first locking section steel affect the construction quality and progress of the whole project. By using the invention, the first section steel can be accurately aligned and fixed, a reliable reference is provided for subsequent construction, and the construction efficiency is improved.
Drawings
FIG. 1 is a front sectional view of the first fore-lock section steel adjusting and fixing device of the present invention;
FIG. 2 is a left sectional view of the first fore-shaft section steel adjusting and fixing device of the invention;
FIG. 3 is a front view of the spindle and the spindle fixing base;
FIG. 4 is a left side view of FIG. 3;
FIG. 5 is a top view of FIG. 3;
in the figure: 1-a special top section for the first locking section steel, 2-a height-adjustable holding rod seat, 3-diagonal braces, 4-special catch wheels, 5-rotating shafts and 6-rotating shaft fixing bases.
Detailed Description
The present invention will be described in further detail with reference to the following examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1 to 5, the adjusting and fixing device for the first fore-lock section steel of the underground continuous steel wall of the invention comprises a special top section 1 for the first fore-lock section steel, a height-adjustable holding rod seat 2, an inclined stay bar 3, a special catch wheel 4, a rotating shaft 5, a rotating shaft fixing base 6 and the like.
The special top section 1 for the first locking notch section steel is connected to the top end of the first section steel through a connecting plate and a bolt, and the whole section is arranged on the ground; in addition, the upper end of the diagonal brace 3, the rotating shaft 5, the rotating shaft fixing base 6 and other parts of the first section steel adjusting and fixing device are all installed and fixed on the top of the special top section 1 for the first section steel, the perpendicularity of the first section steel is adjusted through the special top section 1 for the first section steel, and the first section steel is fixed.
The top section 1 special for the first locking section steel is provided with a temporary holding rod seat 2 and a special catch wheel 4 with adjustable height for facilitating the insertion of the second section steel beside the first section steel.
The length of the inclined strut 3 is adjusted by a screw pair provided with left and right backward and forward screw threads, a pair of rotating shaft seats are installed at the bottoms of the inclined struts, one ends of the rotating shaft seats are welded with the inclined struts, the other ends of the rotating shaft seats are fixed on a guide wall by bar-planting screws, the two ends of the inclined strut are connected by pin shafts, the tops of the inclined struts are connected with the top end of the top section 1 special for the first locking notch section steel by bolts through a cross beam, and the first section steel is matched with a rotating shaft 5 and a rotating shaft fixing base 6 for use after being inserted in place, so that the verticality and the fixation of the first section steel are ensured; and the requirements of the insertion construction process of the first-root section steel and the fine adjustment of the walking position of the first-root section steel are met.
The rotating shaft 5 is arranged in a mounting hole reserved at the lower part of a locking section steel flange plate of the top section 1 special for the first locking section steel and can be fixed with the first section steel, and the rotating shaft fixing base 6 is sleeved at pin holes at two ends of the rotating shaft through pin shafts; when the first section steel is inserted into the special top section 1 of the first locking notch section steel, after a section steel connecting plate is installed, a rotating shaft 5 penetrates through the body of the section steel connecting plate, a rotating shaft fixing base 6 is hung on the rotating shaft 5, then the section steel is continuously inserted downwards until a bottom plate of the rotating shaft fixing base 6 contacts a guide wall stop, and the bottom plate of the fixing base 6 is fixed by using a bar planting bolt; through using with the cooperation of diagonal brace, carry out the attitude adjustment to the shaped steel to this straightness that hangs down that guarantees first root shaped steel waits the shaped steel alignment back, and fixes it on leading the wall.
In summary, in the specific implementation of the invention, after the first section steel is straightened through the rotating shaft, the fixing base and the diagonal brace, the section steel is fixed on the guide wall through the welding piece, the embedded steel plate and the like, so that the vertical insertion accuracy and the firm fixation of the first section steel are ensured, and the construction efficiency is improved.

Claims (1)

1. The utility model provides an adjustment fixing device of first fore-lock profile steel of underground continuous steel wall, includes pivot unable adjustment base, pivot, diagonal brace, the special top segment of first fore-lock profile steel, its characterized in that: the special top segment for the first locking notch section steel is fixedly connected to the top end of the first section steel through a connecting plate and a bolt, so that the special top segment for the first locking notch section steel is higher than the ground; the upper surface of the special top section of the first locking section steel is fixedly connected with a rotating shaft fixing base and a rotating shaft; the rotating shaft is arranged in a mounting hole reserved at the lower part of a locking section steel flange plate of a top section special for the first locking section steel and is fixed with the first section steel, and the rotating shaft fixing base is sleeved at pin holes at two ends of the rotating shaft through pin shafts; an inclined strut is connected between the special top section of the first fore-lock section steel and the guide wall, the length of the inclined strut is adjusted through a screw pair with left and right reversed screw teeth, a pair of rotating shaft seats is installed at the bottom of the inclined strut, one end of each rotating shaft seat is welded with the inclined strut, the other end of each rotating shaft seat is fixed on the guide wall through a bar-planting screw, the two ends of each rotating shaft seat are connected through a pin shaft, and the top of the inclined strut is connected with the top end of the special top section of the first fore-lock section steel through a cross beam through a bolt; after the first section steel is inserted in place, the perpendicularity of the first section steel is adjusted by matching the inclined support rod on the special top section of the first locking section steel with the rotating shaft and the rotating shaft fixing base, so that the perpendicularity of the first section steel is ensured, and the first section steel is fixed on the guide wall after being straightened; when the first section steel is inserted into the special top section of the first locking notch section steel, after the connecting plate is installed, the rotating shaft is arranged on the rotating shaft fixing base in a penetrating mode, then the first section steel is inserted downwards until the bottom plate of the rotating shaft fixing base contacts the guide wall stop, and the bottom plate of the rotating shaft fixing base is fixed through the embedded steel bar bolts; the special top section for the first locking section steel is also provided with a special catch wheel and a temporary holding rod seat with adjustable height, so that the second section steel and the first section steel can be conveniently inserted.
CN202011394074.XA 2020-12-03 2020-12-03 Adjusting and fixing device for first root locking section steel of underground continuous steel wall Active CN112663595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011394074.XA CN112663595B (en) 2020-12-03 2020-12-03 Adjusting and fixing device for first root locking section steel of underground continuous steel wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011394074.XA CN112663595B (en) 2020-12-03 2020-12-03 Adjusting and fixing device for first root locking section steel of underground continuous steel wall

Publications (2)

Publication Number Publication Date
CN112663595A CN112663595A (en) 2021-04-16
CN112663595B true CN112663595B (en) 2022-05-20

Family

ID=75400917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011394074.XA Active CN112663595B (en) 2020-12-03 2020-12-03 Adjusting and fixing device for first root locking section steel of underground continuous steel wall

Country Status (1)

Country Link
CN (1) CN112663595B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846624A (en) * 2021-08-09 2021-12-28 上海市基础工程集团有限公司 Construction method for implementing underground water-soil continuous steel wall by double-wheel slot milling machine
CN113756286A (en) * 2021-08-09 2021-12-07 上海市基础工程集团有限公司 Construction method for implementing underground water soil continuous steel wall by TRD method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3044589B2 (en) * 1992-05-22 2000-05-22 東急建設株式会社 Construction method of steel underground continuous wall
JP3709654B2 (en) * 1997-05-21 2005-10-26 日立建機株式会社 Soil improvement machine with excavation means
CN101619573B (en) * 2009-07-24 2011-07-13 徐州文鹏工程机械制造有限公司 Machine for forming underground continuous water-retaining walls by one step
JP6051600B2 (en) * 2012-06-04 2016-12-27 株式会社大林組 Excavator for underground continuous wall
CN106703014B (en) * 2016-12-14 2019-03-05 上海市基础工程集团有限公司 The pre-buried steel column of diaphram wall is fixed and secondary deviation correcting device and method
CL2016003365A1 (en) * 2016-12-28 2018-09-14 Univ Pontificia Catolica Chile Combination of anchorage to foundations and energy dissipator for vertical liquid storage tanks, vertical pressure vessel, silo or similar of thin wall and continuous support.
CN209958365U (en) * 2019-04-15 2020-01-17 江苏鸿基节能新技术股份有限公司 Triaxial deep mixing pile interpolation tubular pile locator
CN111874843A (en) * 2020-07-27 2020-11-03 山东大学 A segmented steel cage guiding device and method suitable for low space
CN111851468B (en) * 2020-07-28 2021-11-02 上海市基础工程集团有限公司 Underground water soil steel wall continuous inserting verticality control construction method

Also Published As

Publication number Publication date
CN112663595A (en) 2021-04-16

Similar Documents

Publication Publication Date Title
CN112663595B (en) Adjusting and fixing device for first root locking section steel of underground continuous steel wall
CN210486720U (en) Measuring apparatu for construction
CN214329880U (en) Concrete formwork supporting device for civil engineering construction
CN214549772U (en) Carbon fiber traction frame suitable for femoral head and lower limb orthopedic surgery
CN112504062B (en) Device for measuring dislocation in and between rings of lining segment with high precision
CN205062218U (en) Bus body support piece and support frock
CN215862692U (en) Adjustable land and soil space planning spirit level for topographic survey
CN211161689U (en) Convenient steel reinforcement cage making devices
CN213954783U (en) Portable sand prevention dirt surveyor's level
CN213645734U (en) Reinforcing cage processing appurtenance
CN213598958U (en) Survey and drawing auxiliary assembly who updates geographic information fast
CN215331506U (en) Novel formwork support device for building construction
CN214093638U (en) Level gauge for engineering surveying and mapping technology
CN211736288U (en) Special work bench for building stairs
CN210401101U (en) Low supplementary hammering device of method of meeting an emergency
CN218822398U (en) Building survey sighting rod
PT8365U (en) SUPPORT DEVICE FOR THE SUPPORT PASTORS OF TRIBUNES, SHELVES OR SCAFFOLDING
CN217831680U (en) Reinforcing steel bar processing platform
CN223178576U (en) A bracket-type surveying level rod
CN212306331U (en) Telescopic appurtenance for afforestation
CN214758226U (en) Agricultural planting device
CN214423360U (en) Engineering machinery pile driver
CN214530629U (en) Adjustable auxiliary device for butt joint of reinforcement cages
CN218883485U (en) Contact measurement support
CN220186370U (en) Support for surveying instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant