Disclosure of Invention
In view of the above problems, the present invention provides an operation control method for a flexible interconnection system of a platform area, including:
hierarchical control is carried out on the flexible interconnection system of the platform area;
When the flexible interconnection system of the platform area is positioned at the optimal control layer, a local monitoring master station is used for determining a multi-time-scale optimization instruction of a current control plan of the flexible interconnection system of the platform area according to different time-scale predicted values, and the platform area is controlled to run to a control target according to the multi-time-scale optimization instruction;
When the flexible interconnection system of the platform area is in a unified control layer, a central controller is used for collecting equipment layer state quantity and analog quantity, logic operation is carried out on the state quantity and the analog quantity, a logic operation result is obtained, and the operation action of the flexible interconnection system of the platform area is controlled in real time according to the logic operation result;
when the flexible interconnection system of the platform area is positioned at the local control layer, the control equipment layer performs response control on the local side according to the reference voltage and the power command received by the outer ring.
Optionally, the control target includes at least one of: the average load, peak clipping and valley filling, VPP and/or power supply reliability among stations meet preset requirements.
Optionally, the running action includes at least one of: the power flow controller starts and stops the action, the cascade coordination action of the power flow controller, the system cooperative action and/or the system operation action.
Optionally, the in-situ side response control includes: selecting a controlled operation mode to perform response control on the ground side according to the arrangement and combination result of the platform area triggering conditions;
wherein different modes of operation map different cooperative control strategies and sequential control logic.
Optionally, the operation mode includes:
An economy running mode, wherein the triggering conditions of the economy running mode are as follows: when the load rate of the platform area is lower than 60%, the battery of the control platform area charges and discharges according to the peak-valley electricity price of the place where the platform area is located, so that the AC/DC and the DC/DC of the platform area operate in a constant power control mode, and the energy storage charging and discharging power is equally divided;
the load balancing operation mode 1 is characterized in that the triggering condition of the load balancing operation mode 1 is as follows: when the load rate of any one of the platform areas is more than 60%, carrying out uniform load by combining energy storage of the rest of the platform areas, carrying out uniform load on the platform areas with the load rate of more than 60%, selecting the AC/DC of any one of the rest of the platform areas as a voltage source to carry out a constant direct current side voltage control mode, selecting the AC/DC and the DC/DC of any one of the rest of the platform areas to operate in a constant power control mode, and operating the AC/DC of the platform areas with the load rate of more than 60% in the constant power control mode;
And a balanced load operation mode 2, wherein the triggering conditions of the balanced load operation mode 2 are as follows: when the load rate of any one of the transformer areas is less than 60%, carrying out load balancing on the combined energy storage of the rest transformer areas, controlling the transformer area AC/DC with the load rate less than 60% to serve as a voltage source to operate in a constant direct current side bus voltage control mode, controlling the DC/DC to operate in a constant power control mode, and controlling the rest transformer area AC/DC to operate in the constant power control mode;
the power-losing transfer supply operation mode 1 comprises the following triggering conditions: when one of the station areas is powered off, the remaining station areas are combined with energy storage to supply power to the power-off station area, the AC/DC of any one of the remaining station areas is selected to serve as a voltage source to operate in a constant-DC side bus voltage control mode, the DC/DC and the other AC/DC operate in a constant-power control mode, and the power-off station area AC/DC operates in a VF control mode;
Before power is supplied to the power failure station area in the VF control mode, judging whether to cut off a feeder load according to the moment load rate on the power failure station area;
the power-losing transfer supply operation mode 2 comprises the following triggering conditions:
When any one of the transformer areas is not powered off, the remaining transformer areas are combined with energy storage to supply power to the power-off transformer areas, the AC/DC of the remaining transformer areas is used as a voltage source to operate in a constant-DC bus voltage control mode, the DC/DC is used as a voltage source to operate in a constant-power control mode, and the AC/DC of the power-off transformer areas is used as a VF control mode;
And a shutdown mode, wherein the triggering conditions of the shutdown mode are as follows: and when the power of the station areas is lost, the system is stopped.
Optionally, the hierarchical control includes: the system comprises optimal control, unified control and on-site control, wherein the optimal control mapping platform region flexible interconnection system monitors a master station on site, the unified control mapping platform region flexible interconnection system is a central controller, and the on-site control mapping platform region flexible interconnection system is an equipment layer.
The invention also provides an operation control system for the flexible interconnection system of the platform area, which comprises:
the mapping unit is used for carrying out layered control on the flexible interconnection system of the platform area;
the first hierarchical control unit determines that when the flexible interconnection system of the platform region is in an optimal control layer, the control-use on-site monitoring master station determines a multi-time-scale optimization instruction of a current control plan of the flexible interconnection system of the platform region according to different time-scale predicted values, and controls the platform region to operate to a control target according to the multi-time-scale optimization instruction;
The second hierarchical control unit is used for determining that when the flexible interconnection system of the platform area is in a unified control layer, a central controller is controlled to acquire equipment layer state quantity and analog quantity, logic operation is carried out on the state quantity and the analog quantity, a logic operation result is obtained, and the operation action of the flexible interconnection system of the platform area is controlled in real time according to the logic operation result;
And the third hierarchical control unit is used for determining that when the flexible interconnection system of the area is positioned at the local control layer, the control equipment layer is used for carrying out response control on the local side according to the reference voltage and the power command received by the outer ring.
Optionally, the control target of the first hierarchical control unit includes at least one of: the average load, peak clipping and valley filling, VPP and/or power supply reliability among stations meet preset requirements.
Optionally, the second hierarchical control unit operation action includes at least one of: the power flow controller starts and stops the action, the cascade coordination action of the power flow controller, the system cooperative action and/or the system operation action.
Optionally, the in-situ side response control of the third hierarchical control unit includes: selecting a controlled operation mode to perform response control on the ground side according to the arrangement and combination result of the platform area triggering conditions;
wherein different modes of operation map different cooperative control strategies and sequential control logic.
Optionally, the operation mode includes:
An economy running mode, wherein the triggering conditions of the economy running mode are as follows: when the load rate of the platform area is lower than 60%, the battery of the control platform area charges and discharges according to the peak-valley electricity price of the place where the platform area is located, so that the AC/DC and the DC/DC of the platform area operate in a constant power control mode, and the energy storage charging and discharging power is equally divided;
the load balancing operation mode 1 is characterized in that the triggering condition of the load balancing operation mode 1 is as follows: when the load rate of any one of the platform areas is more than 60%, carrying out uniform load by combining energy storage of the rest of the platform areas, carrying out uniform load on the platform areas with the load rate of more than 60%, selecting the AC/DC of any one of the rest of the platform areas as a voltage source to carry out a constant direct current side voltage control mode, selecting the AC/DC and the DC/DC of any one of the rest of the platform areas to operate in a constant power control mode, and operating the AC/DC of the platform areas with the load rate of more than 60% in the constant power control mode;
And a balanced load operation mode 2, wherein the triggering conditions of the balanced load operation mode 2 are as follows: when the load rate of any one of the transformer areas is less than 60%, carrying out load balancing on the combined energy storage of the rest transformer areas, controlling the transformer area AC/DC with the load rate less than 60% to serve as a voltage source to operate in a constant direct current side bus voltage control mode, controlling the DC/DC to operate in a constant power control mode, and controlling the rest transformer area AC/DC to operate in the constant power control mode;
the power-losing transfer supply operation mode 1 comprises the following triggering conditions: when one of the station areas is powered off, the remaining station areas are combined with energy storage to supply power to the power-off station area, the AC/DC of any one of the remaining station areas is selected to serve as a voltage source to operate in a constant-DC side bus voltage control mode, the DC/DC and the other AC/DC operate in a constant-power control mode, and the power-off station area AC/DC operates in a VF control mode;
Before power is supplied to the power failure station area in the VF control mode, judging whether to cut off a feeder load according to the moment load rate on the power failure station area;
the power-losing transfer supply operation mode 2 comprises the following triggering conditions:
When any one of the transformer areas is not powered off, the remaining transformer areas are combined with energy storage to supply power to the power-off transformer areas, the AC/DC of the remaining transformer areas is used as a voltage source to operate in a constant-DC bus voltage control mode, the DC/DC is used as a voltage source to operate in a constant-power control mode, and the AC/DC of the power-off transformer areas is used as a VF control mode;
And a shutdown mode, wherein the triggering conditions of the shutdown mode are as follows: and when the power of the station areas is lost, the system is stopped.
Optionally, the hierarchical control of the mapping unit includes: the system comprises optimal control, unified control and on-site control, wherein the optimal control mapping platform region flexible interconnection system monitors a master station on site, the unified control mapping platform region flexible interconnection system is a central controller, and the on-site control mapping platform region flexible interconnection system is an equipment layer.
The invention has advancement in real-time power control, and has lower construction cost and advancement in advanced application on the premise of realizing the application of the same function.
Detailed Description
The exemplary embodiments of the present invention will now be described with reference to the accompanying drawings, however, the present invention may be embodied in many different forms and is not limited to the examples described herein, which are provided to fully and completely disclose the present invention and fully convey the scope of the invention to those skilled in the art. The terminology used in the exemplary embodiments illustrated in the accompanying drawings is not intended to be limiting of the invention. In the drawings, like elements/components are referred to by like reference numerals.
Unless otherwise indicated, terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art. In addition, it will be understood that terms defined in commonly used dictionaries should be interpreted as having a meaning that is consistent with their meaning in the context of the relevant art and will not be interpreted in an idealized or overly formal sense.
The invention provides an operation control method for a flexible interconnection system of a platform area, which is shown in figure 1 and comprises the following steps:
Performing hierarchical control on the flexible interconnection system of the platform area, wherein the hierarchical control comprises the following steps: the system comprises an optimal control, unified control and on-site control, wherein the optimal control maps a master station of an on-site monitoring system of the flexible interconnection system of the area, the unified control maps a central controller of the flexible interconnection system of the area, and the on-site control maps an equipment layer of the flexible interconnection system of the area;
When the flexible interconnection system of the platform area is positioned at the optimal control layer, a local monitoring master station is used for determining a multi-time-scale optimization instruction of a current control plan of the flexible interconnection system of the platform area according to different time-scale predicted values, and the platform area is controlled to run to a control target according to the multi-time-scale optimization instruction;
When the flexible interconnection system of the platform area is in a unified control layer, a central controller is used for collecting equipment layer state quantity and analog quantity, logic operation is carried out on the state quantity and the analog quantity, a logic operation result is obtained, and the operation action of the flexible interconnection system of the platform area is controlled in real time according to the logic operation result;
when the flexible interconnection system of the platform area is positioned at the local control layer, the control equipment layer performs response control on the local side according to the reference voltage and the power command received by the outer ring.
Wherein the control target includes: the average load, peak clipping and valley filling, VPP and/or power supply reliability among stations meet preset requirements.
Wherein the running action comprises: the power flow controller starts and stops the action, the cascade coordination action of the power flow controller, the system cooperative action and/or the system operation action.
Wherein the response control of the local side comprises: selecting a controlled operation mode to perform response control on the ground side according to the arrangement and combination result of the platform area triggering conditions;
wherein different modes of operation map different cooperative control strategies and sequential control logic.
Wherein the operation mode includes:
An economy running mode, wherein the triggering conditions of the economy running mode are as follows: when the load rate of the platform area is lower than 60%, the battery of the control platform area charges and discharges according to the peak-valley electricity price of the place where the platform area is located, so that the AC/DC and the DC/DC of the platform area operate in a constant power control mode, and the energy storage charging and discharging power is equally divided;
the load balancing operation mode 1 is characterized in that the triggering condition of the load balancing operation mode 1 is as follows: when the load rate of any one of the platform areas is more than 60%, carrying out uniform load by combining energy storage of the rest of the platform areas, carrying out uniform load on the platform areas with the load rate of more than 60%, selecting the AC/DC of any one of the rest of the platform areas as a voltage source to carry out a constant direct current side voltage control mode, selecting the AC/DC and the DC/DC of any one of the rest of the platform areas to operate in a constant power control mode, and operating the AC/DC of the platform areas with the load rate of more than 60% in the constant power control mode;
And a balanced load operation mode 2, wherein the triggering conditions of the balanced load operation mode 2 are as follows: when the load rate of any one of the transformer areas is less than 60%, carrying out load balancing on the combined energy storage of the rest transformer areas, controlling the transformer area AC/DC with the load rate less than 60% to serve as a voltage source to operate in a constant direct current side bus voltage control mode, controlling the DC/DC to operate in a constant power control mode, and controlling the rest transformer area AC/DC to operate in the constant power control mode;
the power-losing transfer supply operation mode 1 comprises the following triggering conditions: when one of the station areas is powered off, the remaining station areas are combined with energy storage to supply power to the power-off station area, the AC/DC of any one of the remaining station areas is selected to serve as a voltage source to operate in a constant-DC side bus voltage control mode, the DC/DC and the other AC/DC operate in a constant-power control mode, and the power-off station area AC/DC operates in a VF control mode;
before power is supplied to the power failure station area in the VF control mode, judging whether to cut off a feeder load according to the load rate of the power failure station area at the moment;
the power-losing transfer supply operation mode 2 comprises the following triggering conditions:
When any one of the transformer areas is not powered off, the remaining transformer areas are combined with energy storage to supply power to the power-off transformer areas, the AC/DC of the remaining transformer areas is used as a voltage source to operate in a constant-DC bus voltage control mode, the DC/DC is used as a voltage source to operate in a constant-power control mode, and the AC/DC of the power-off transformer areas is used as a VF control mode;
And a shutdown mode, wherein the triggering conditions of the shutdown mode are as follows: and when the power of the station areas is lost, the system is stopped.
The invention is further illustrated by the following examples:
The following description is made by using a Ningbo North-Loose village distribution transformer area system, and the geographic diagram is shown in fig. 2, wherein the geographic diagram is that the No.1 area is accessed to 20 more users (average load rate 20%), the No. 2 area is accessed to 200 more users (average load rate 54%), and the No. 5 area is accessed to 80 more users (average load rate 20%).
In geographic position, no. 2 district and No. 5 district are about 150 meters apart from, and No. 1 district is about 800 meters apart from two preceding districts, and No. 1, no. 2 and No. 5 change to the post and change, switch, concentrator, change terminal, SVG all integrate into in the JP cabinet.
The station transformer is a 1-path 10kV inlet wire and a 3-path 400V inlet wire, wherein the station transformer 1, the station transformer 2 and the station transformer 5 only use 2 paths of inlet wires, and 1 path of inlet wires are reserved for standby, but only 2 inlet wire holes are reserved on the JP cabinet body;
the 3-channel feeder lines of the 3-channel transformer and the 4-channel transformer are used, the 10kV feeder line is provided with a zero gram switch, the 400V low-voltage main feeder line is provided with a disconnecting link, the outlet side of the 3-channel feeder line is provided with an idle switch, and the information acquisition resolution of the current 5-channel transformer terminals is 15 minutes.
A set of flexible platform region interconnection system is built between the two-lion villages 1,2 and 5 of Ningbo North, as shown in fig. 3, each flexible interconnection container comprises 3 250kW bidirectional DC/AC converters, each converter is embedded with an AC inlet switch, the 3 platforms pass through the respective DC/AC converters and then are collected into a DC switch cabinet to form a wiring mode of a common DC bus, the DC switch cabinet is3 in and 3 out, 1 line of 3 outgoing lines is connected into an energy storage system, the other 2 lines of outgoing lines are connected into a quick charging pile in standby mode, and the respective inlet and outlet switches in the DC switch cabinet are fused with a quick protection function.
The energy storage capacity of the lithium iron phosphate battery is 300kWh, and the lithium iron phosphate battery is connected into a direct current switch cabinet through 200kW bidirectional DC/DC, and is secondarily provided with 1 central controller and 1 set of on-site monitoring master station for monitoring and controlling the running state of the interconnected system of the transformer area in real time, and simultaneously, optimizing scheduling instructions are appointed for the interconnected system based on prediction data. Meanwhile, a plurality of auxiliary devices such as rapid protection, metering, direct current screens, cables and the like are configured, so that the normal operation of the flexible interconnection container system is ensured.
The flexible interconnect container is in secondary communication with the interior:
1) The central controller is respectively communicated with K11, K12, K13, K14, K21, K22, K23, K24, K51, K52, K53 and K54 in the 3 JP cabinets in a mode of converting RS-485 into optical fiber to RS-485, so that three remote functions of remote signaling, remote measurement and remote control are realized;
2) The central controller is communicated with 3 DC/ACs respectively in an RS-485 mode to acquire the state quantity and analog quantity of the converter, and simultaneously, the control mode and start-stop of the converter are remotely controlled, and the output power of the converter is remotely measured to realize a four-remote function;
3) The central controller communicates with the direct current switch cabinet in an RS-485 mode to acquire the state quantity of the direct current side-in and wire-out switch, and simultaneously, the central controller remotely controls the state quantity of the direct current side-in and wire-out switch to realize a two-remote function;
4) The central controller communicates with the local monitoring master station in an Ethernet mode, on one hand, the local monitoring master station obtains real-time operation information of the platform area interconnection system from the central controller, on the other hand, the central controller receives optimization instructions of different time scales of the local master station, and after verification, each terminal device is issued;
5) And the central controller uploads partial data of the flexible interconnection system of the part station area to the main station of the IV area in a wireless mode after chip hard encryption and I-type network management soft encryption.
The invention also provides an operation control system 200 for the flexible interconnection system of the platform area, as shown in fig. 4, comprising:
A mapping unit 201 performs hierarchical control on the flexible interconnection system of the area, where the hierarchical control includes: the system comprises an optimal control, unified control and on-site control, wherein the optimal control maps a master station of an on-site monitoring system of the flexible interconnection system of the area, the unified control maps a central controller of the flexible interconnection system of the area, and the on-site control maps an equipment layer of the flexible interconnection system of the area;
The first hierarchical control unit 202 determines that when the flexible interconnection system of the platform area is in an optimal control layer, the control-use local monitoring master station determines a multi-time-scale optimization instruction of a current control plan of the flexible interconnection system of the platform area according to different time-scale predicted values, and controls the platform area to operate to a control target according to the multi-time-scale optimization instruction;
The second hierarchical control unit 203 determines that when the flexible interconnection system of the platform area is in a unified control layer, a central controller is controlled to collect equipment layer state quantity and analog quantity, logic operation is performed on the state quantity and analog quantity, a logic operation result is obtained, and the operation action of the flexible interconnection system of the platform area is controlled in real time according to the logic operation result;
The third hierarchical control unit 204 determines that when the flexible interconnection system of the area is in the local control layer, the control device layer is used to perform response control on the local side according to the reference voltage and the power command received by the outer ring.
Wherein the control target includes: the average load, peak clipping and valley filling, VPP and/or power supply reliability among stations meet preset requirements.
Wherein the running action comprises: the power flow controller starts and stops the action, the cascade coordination action of the power flow controller, the system cooperative action and/or the system operation action.
Wherein the response control of the local side comprises: selecting a controlled operation mode to perform response control on the ground side according to the arrangement and combination result of the platform area triggering conditions;
wherein different modes of operation map different cooperative control strategies and sequential control logic.
Wherein the operation mode includes:
An economy running mode, wherein the triggering conditions of the economy running mode are as follows: when the load rate of the platform area is lower than 60%, the battery of the control platform area charges and discharges according to the peak-valley electricity price of the place where the platform area is located, so that the AC/DC and the DC/DC of the platform area operate in a constant power control mode, and the energy storage charging and discharging power is equally divided;
the load balancing operation mode 1 is characterized in that the triggering condition of the load balancing operation mode 1 is as follows: when the load rate of any one of the platform areas is more than 60%, carrying out uniform load by combining energy storage of the rest of the platform areas, carrying out uniform load on the platform areas with the load rate of more than 60%, selecting the AC/DC of any one of the rest of the platform areas as a voltage source to carry out a constant direct current side voltage control mode, selecting the AC/DC and the DC/DC of any one of the rest of the platform areas to operate in a constant power control mode, and operating the AC/DC of the platform areas with the load rate of more than 60% in the constant power control mode;
And a balanced load operation mode 2, wherein the triggering conditions of the balanced load operation mode 2 are as follows: when the load rate of any one of the transformer areas is less than 60%, carrying out load balancing on the combined energy storage of the rest transformer areas, controlling the transformer area AC/DC with the load rate less than 60% to serve as a voltage source to operate in a constant direct current side bus voltage control mode, controlling the DC/DC to operate in a constant power control mode, and controlling the rest transformer area AC/DC to operate in the constant power control mode;
the power-losing transfer supply operation mode 1 comprises the following triggering conditions: when one of the station areas is powered off, the remaining station areas are combined with energy storage to supply power to the power-off station area, the AC/DC of any one of the remaining station areas is selected to serve as a voltage source to operate in a constant-DC side bus voltage control mode, the DC/DC and the other AC/DC operate in a constant-power control mode, and the power-off station area AC/DC operates in a VF control mode;
Before power is supplied to the power failure station area in the VF control mode, judging whether to cut off a feeder load according to the moment load rate on the power failure station area;
the power-losing transfer supply operation mode 2 comprises the following triggering conditions:
When any one of the transformer areas is not powered off, the remaining transformer areas are combined with energy storage to supply power to the power-off transformer areas, the AC/DC of the remaining transformer areas is used as a voltage source to operate in a constant-DC bus voltage control mode, the DC/DC is used as a voltage source to operate in a constant-power control mode, and the AC/DC of the power-off transformer areas is used as a VF control mode;
And a shutdown mode, wherein the triggering conditions of the shutdown mode are as follows: and when the power of the station areas is lost, the system is stopped.
The invention has advancement in real-time power control, and has lower construction cost and advancement in advanced application on the premise of realizing the application of the same function.
It will be appreciated by those skilled in the art that embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein. The scheme in the embodiment of the application can be realized by adopting various computer languages, such as object-oriented programming language Java, an transliteration script language JavaScript and the like.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present application have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. It is therefore intended that the following claims be interpreted as including the preferred embodiments and all such alterations and modifications as fall within the scope of the application.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present application without departing from the spirit or scope of the application. Thus, it is intended that the present application also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.