[go: up one dir, main page]

CN113718647A - Assembled combination steel bridge deck structure - Google Patents

Assembled combination steel bridge deck structure Download PDF

Info

Publication number
CN113718647A
CN113718647A CN202111135844.3A CN202111135844A CN113718647A CN 113718647 A CN113718647 A CN 113718647A CN 202111135844 A CN202111135844 A CN 202111135844A CN 113718647 A CN113718647 A CN 113718647A
Authority
CN
China
Prior art keywords
steel plate
steel
profiled
bridge deck
corrugated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111135844.3A
Other languages
Chinese (zh)
Other versions
CN113718647B (en
Inventor
翟慕赛
褚乐
任璐
钱佳宸
刘可凡
杨政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University of Science and Technology
Original Assignee
Suzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University of Science and Technology filed Critical Suzhou University of Science and Technology
Priority to CN202111135844.3A priority Critical patent/CN113718647B/en
Publication of CN113718647A publication Critical patent/CN113718647A/en
Application granted granted Critical
Publication of CN113718647B publication Critical patent/CN113718647B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides an assembled combined steel bridge deck slab structure which comprises a corrugated steel plate, a profiled steel plate, PBL (Poly-p-phenylene Ben-L) shear connectors, an inverted T-shaped diaphragm plate and ultrahigh-performance concrete. The overlapped areas of the corrugated steel plates and the profiled steel plates are connected by high-strength structural adhesive, and the straight sections are connected by high-strength bolts; the corrugated steel plate and profiled steel plate assembly is connected with the upper flange of the steel main beam through a high-strength bolt; the inverted T-shaped diaphragm plate is connected with the corrugated steel plate through a welding line and is connected with a steel girder web plate through a high-strength bolt or a welding line; the PBL shear connectors are respectively arranged in the flat straight section and the lower concave section of the profiled steel plate, and then the ultra-high performance concrete combined layer is poured to jointly act with the steel bridge deck. The invention has the advantages of high rigidity, low cost, high construction speed, good fatigue performance and the like, and can effectively improve the integral bearing capacity of the steel bridge structure and the fatigue performance of the steel bridge deck.

Description

Assembled combination steel bridge deck structure
Technical Field
The application belongs to the technical field of bridge engineering, and particularly relates to an assembled combined steel bridge deck structure.
Background
The orthotropic steel bridge deck has the advantages of light dead weight, large bearing capacity, convenient construction, attractive appearance and the like, and is widely applied to large and medium span bridges. However, the orthotropic steel bridge deck slab has a hollow thin-wall structure and a complex structure, has many connecting welding seams, is easy to cause fatigue cracking under the influence of factors such as initial defects, traffic load, environmental conditions and the like, and seriously influences the overall safety and durability of the steel structure bridge. According to the detection result of the solid bridge, fatigue cracks are found in different welding details of orthotropic steel bridge deck plates, such as longitudinal rib-top plate connecting welding seams, longitudinal rib-diaphragm plate connecting welding seams, diaphragm plate-top plate connecting welding seams, longitudinal rib splicing welding seams and the like.
The existing research shows that the detail fatigue performance of the welding seam of the orthotropic steel bridge deck plate is influenced by factors such as welding type, welding quality, penetration rate and the like, and the welding quality is closely related to the welding technology, the welding condition and the welding proficiency. The orthotropic steel bridge deck is usually constructed by adopting a construction method of factory prefabrication and construction site assembly, the structure is longitudinally and transversely divided by considering the capabilities of hoisting and transporting equipment during design, and a certain number of welding seams and high-strength bolt connection construction are required after different blocks are transported to the site. The field welding is affected by temperature, wind and welding posture, the welding quality is difficult to guarantee, initial defects such as air holes, slag inclusion, cracks and the like are easy to occur generally, and fatigue cracks are formed under the action of traffic load, so that the fatigue performance of welding details is affected. Because the fatigue crack initiation position of the welding seam is hidden, the size is difficult to determine by a conventional detection means when the size is small, and the fatigue crack is usually expanded to a certain length when being detected, thereby causing serious threat to the structural safety. For example, fatigue cracks of longitudinal rib-top plate welding details generally originate at the weld toe or root position, the propagation direction is the thickness direction of the top plate or the longitudinal stiffening rib, and the cracks penetrate the top plate to further affect bridge deck pavement and further affect driving comfort and safety. When the steel bridge deck slab is designed, on-site welding work is avoided as much as possible, and the fatigue performance of the steel bridge deck slab is ensured by improving the on-site construction quality.
The surface of the steel bridge deck is generally provided with a pavement layer which plays a role in dispersing wheel load, protecting the bridge deck and improving the driving comfort, and the common pavement forms are epoxy asphalt concrete, pouring asphalt concrete, modified asphalt mastic and macadam mixture and the like. During structural analysis, the bridge deck pavement is only used as a part of dead load and does not participate in structural stress. In an actual state, the bridge deck pavement can disperse load, the local stress of fatigue details can be effectively reduced under the combined action of the pavement layer and the bridge deck slab, and researches show that the pavement can reduce the fatigue stress of the steel bridge deck slab by 20-50%. In recent years, researchers at home and abroad begin to research and develop high-performance concrete such as RPC and UHPC, and try to apply the high-performance concrete to steel bridge deck pavement to form a combined pavement layer, and research results are applied to steel bridge deck pavement of a plurality of long-span bridges. Therefore, the combined bridge deck pavement type can fully utilize the mechanical property of bridge deck pavement, is beneficial to reducing the fatigue stress of the steel bridge deck, and has wide application prospect on the steel bridge deck structure.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the novel combined steel bridge deck structure is simple in structure and convenient and fast to construct, and connecting welding seams are few.
The technical scheme adopted by the invention for solving the technical problems is as follows:
an assembled composite steel bridge deck structure, comprising:
the corrugated steel plate comprises flat straight sections and lower concave sections which are alternately arranged;
the corrugated steel plate is connected with the lower concave section of the profiled steel plate through high-strength structural adhesive, and the corrugated steel plate is connected with the straight section of the profiled steel plate through a high-strength bolt;
the corrugated steel plate and the profiled steel plate are connected with the steel main beam through high-strength bolts;
the upper edge of the inverted T-shaped diaphragm plate is matched with the corrugated steel plate in contour, the upper edge of the inverted T-shaped diaphragm plate is connected with the corrugated steel plate in a welding mode, and two sides of the inverted T-shaped diaphragm plate are connected with the steel main beam through high-strength bolts or welding seams respectively;
the PBL shear connector is embedded above the profiled steel sheet;
and the ultrahigh-performance concrete is poured above the profiled steel sheet and covers the PBL shear connector.
Preferably, the assembled composite steel deck plate structure of the present invention, the PBL shear connector comprises:
the hole digging steel plate is arranged along the length direction of the bridge and is arranged in the lower concave section of the profiled steel plate;
the straight section hole digging steel plate is arranged along the length direction of the bridge and is arranged in the straight section of the profiled steel plate;
the lower concave section steel bar is transversely arranged and arranged in the lower concave section of the profiled steel sheet;
and the straight section steel bar is transversely arranged and arranged on the straight section of the profiled steel sheet.
Preferably, the assembled composite steel bridge deck structure of the present invention, the inverted T-shaped diaphragm comprises:
the diaphragm plate web plate is vertically arranged, and the profile of the upper edge of the diaphragm plate web plate is matched with the corrugated steel plate;
the diaphragm plate lower flange is horizontally arranged, fixed below the diaphragm plate web and connected with the diaphragm plate web in a T shape.
Preferably, the fabricated composite steel deck structure of the present invention, the steel girder includes:
the upper flange of the steel main beam is horizontally arranged;
the steel girder web plate is vertically arranged;
the lower flange of the steel girder is horizontally arranged and fixed below the web plate of the steel girder and is connected with the web plate of the steel girder in a T shape.
And the web stiffening ribs are transversely arranged, are connected with the web of the steel girder in a welding manner, are polished and tightly propped against the upper flange of the steel girder and the lower flange of the steel girder, and are arranged at a certain distance longitudinally.
Preferably, in the assembled combined steel bridge deck structure, the height of the profiled steel sheet is lower than half of that of the corrugated steel sheet, and the corrugated angles of the profiled steel sheet and the corrugated steel sheet are consistent to ensure that the profiled steel sheet and the corrugated steel sheet are tightly attached; the thickness of the high-strength structural adhesive between the profiled steel sheet and the corrugated steel sheet is 3-5 mm;
the height of the inverted T-shaped diaphragm is 2-4 times of that of the corrugated steel plate, and arc-shaped notches are formed in the connecting areas of the inverted T-shaped diaphragm and the corrugated steel plate and the web plate of the steel girder.
Preferably, in the fabricated composite steel bridge deck structure of the invention, all the openings on the straight section of the holed steel plate are consistent in height, the opening of the lower concave section of the holed steel plate is half of the height of the profiled steel plate, and all the openings are the same in size and the longitudinal positions are consistent.
Preferably, in the assembled composite steel bridge deck structure of the invention, the concave section holed steel plate and the straight section holed steel plate are respectively arranged at the transverse middle positions of the concave section and the straight section of the profiled steel plate, the concave section steel bar transversely and continuously passes through the concave section holed steel plate, and the straight section steel bar transversely and continuously passes through the straight section holed steel plate.
Preferably, in the fabricated composite steel bridge deck structure, the casting thickness of the ultra-high performance concrete is 40-60 mm.
Preferably, in the fabricated composite steel bridge deck structure of the present invention, the interval between the longitudinal joints of the corrugated steel plate and the profiled steel plate is more than 500 mm.
The invention has the beneficial effects that:
1. the on-site welding seams are few, and the construction quality is reliable. According to the assembled combined steel bridge deck structure, plates are connected through the high-strength structural adhesive and the high-strength bolts, and the longitudinal sections are spliced through the high-strength bolts, so that the workload of field welding seams is greatly reduced, the construction quality of the steel bridge deck is improved, and the whole structure is better in durability.
2. The construction is convenient and fast, and the construction cost is reduced. The components of the assembled combined steel bridge deck structure can be completed in batches in a factory, the self weight of a single component is reduced, and large-tonnage transportation and hoisting equipment is not needed; at the bridge site, only the work of coating structural adhesive, screwing high-strength bolts and the like is needed, so that the construction efficiency is greatly improved, and the construction cost is effectively reduced.
3. The fatigue performance is good, and the structure economic performance is superior. The assembled combined steel bridge deck structure fully utilizes steel and high-performance concrete materials to bear vehicle wheel load, can effectively reduce fatigue stress of the steel bridge deck, has good structural fatigue performance, can obviously save detection and maintenance cost in the later operation process, and has superior structural economic performance.
Drawings
The technical solution of the present application is further explained below with reference to the drawings and the embodiments.
FIG. 1 is a schematic structural diagram of a fabricated composite steel bridge deck according to an embodiment of the present application;
FIG. 2 is a schematic view of a corrugated steel plate according to an embodiment of the present application;
FIG. 3 is a schematic view of a profiled steel sheet according to an embodiment of the present application;
FIG. 4 is a schematic view of a PBL shear connector arrangement of an embodiment of the present application;
FIG. 5 is a schematic view of an inverted T-shaped diaphragm of an embodiment of the present application;
FIG. 6 is a schematic layout diagram of a high-strength bolt hole on an upper flange of a steel girder according to an embodiment of the application.
The reference numbers in the figures are:
1. folding the steel plate; 2. profiled steel sheets; PBL shear connectors; 31. digging a hole steel plate at the concave section; 32. digging a hole steel plate at the straight section; 33. a concave section steel bar; 34. straight section steel bars; 4. an inverted T-shaped diaphragm plate; 41. a diaphragm web; 42. a diaphragm plate lower flange; 5. ultra-high performance concrete; 6. a steel main beam; 61. a steel main beam upper flange; 62. a steel main beam web; 63. a steel girder lower flange; 64. a web stiffener.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
In the description of the present application, it is to be understood that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientation or positional relationship indicated in the drawings for convenience in describing the present application and for simplicity in description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated in a particular manner, and are not to be considered limiting of the scope of the present application. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, the meaning of "a plurality" is two or more unless otherwise specified.
In the description of the present application, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art through specific situations.
The technical solutions of the present application will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Examples
As shown in fig. 1, the assembled composite steel bridge deck structure according to the embodiment includes;
the corrugated steel plate 1 comprises flat sections and lower concave sections which are alternately arranged;
the profiled steel sheet 2 comprises flat sections and concave sections which are alternately arranged and is arranged corresponding to the corrugated steel sheet 1, the corrugated steel sheet 1 is connected with the concave sections of the profiled steel sheet 2 through high-strength structural adhesive, and the corrugated steel sheet 1 is connected with the flat sections of the profiled steel sheet 2 through high-strength bolts;
the corrugated steel plate 1 and the profiled steel plate 2 are connected with a steel main beam 6 through high-strength bolts;
the upper edge of the inverted T-shaped diaphragm plate 4 is matched with the corrugated steel plate 1 in outline, the upper edge of the inverted T-shaped diaphragm plate 4 is connected with the corrugated steel plate 1 in a welding mode, and two sides of the inverted T-shaped diaphragm plate 4 are connected with the steel main beam 6 through high-strength bolts or welding seams respectively;
the PBL shear connector 3 is embedded above the profiled steel sheet 2;
and the ultrahigh-performance concrete 5 is poured above the profiled steel sheet 2 and covers the PBL shear connector 3.
Preferably, in the fabricated composite steel deck plate structure of the present embodiment, the PBL shear connector 3 includes:
the lower concave section hole digging steel plate 31 is arranged along the length direction of the bridge and is arranged in the lower concave section of the profiled steel plate 2;
the straight section hole digging steel plate 32 is arranged along the length direction of the bridge and is arranged in the straight section of the profiled steel plate 2;
the lower concave section steel bar 33 is transversely arranged and arranged in the lower concave section of the profiled steel sheet 2;
and the straight section steel bar 34 is transversely arranged and is arranged on the straight section of the profiled steel sheet 2.
Specifically, as shown in fig. 4, since the straight sections of the corrugated steel plate 1 and the profiled steel plate 2 are complete planes, the straight section of the steel bar 34 is continuous in the transverse direction of the steel bridge deck; because the concave sections of the corrugated steel plate 1 and the profiled steel plate 2 are distributed at intervals, the concave section steel bars 33 are divided into a plurality of sections and are correspondingly arranged in each concave section.
Preferably, in the fabricated composite steel deck plate structure of the present embodiment, the inverted T-shaped diaphragm 4 includes:
the diaphragm plate web plate 41 is vertically arranged, and the upper edge profile of the diaphragm plate web plate is matched with the corrugated steel plate 1;
the diaphragm lower flange 42 is horizontally arranged, fixed below the diaphragm web 41 and connected with the diaphragm web 41 in a T shape.
Preferably, in the fabricated composite steel deck structure of the present embodiment, the steel girder 6 includes:
the upper flange 61 of the steel main beam is horizontally arranged;
a steel main beam web 62 arranged vertically;
and the lower flange 63 of the steel girder is horizontally arranged and fixed below the web 61 of the steel girder and is connected with the web 61 of the steel girder in a T shape.
And the web stiffening rib 64 is transversely arranged, is connected with the web 62 of the steel girder in a welding manner, is polished and tightly propped against the upper flange 61 of the steel girder and the lower flange 63 of the steel girder, and is longitudinally arranged at a certain distance.
As shown in fig. 1 to 3, the overlapping areas of the corrugated steel plate 1 and the profiled steel plate 2 in this embodiment are connected by high-strength structural adhesive, and the straight sections are connected by high-strength bolts; and the corrugated steel plate 1 and profiled steel plate 2 combined body is connected with a steel main beam 6 through a high-strength bolt.
As shown in fig. 1 to 3, the height of the profiled steel sheet 2 in this embodiment is lower than the height of the half longitudinal corrugated steel sheet 1, and the corrugated angles of the corrugated steel sheet 1 and the profiled steel sheet 2 should be the same, and the two are tightly attached.
As shown in fig. 1 to 3, the thickness of the high-strength structural adhesive between the corrugated steel plate 1 and the profiled steel plate 2 in this embodiment is 3 to 5 mm.
As shown in fig. 1 and 4, the PBL shear connectors 3 according to the present embodiment are respectively arranged in the straight section and the concave section of the profiled steel sheet 2, and then the ultra-high performance concrete 5 is poured to work together with the steel bridge deck.
As shown in fig. 1 to 4, in the present embodiment, the opening heights of the steel plates (the lower concave-section holed steel plate 31 and the straight-section holed steel plate 32) above the straight section of the profiled steel plate 2 of the PBL shear connector 3 should be kept consistent, the opening height of the steel plate 32 in the lower concave section of the profiled steel plate is half of the height of the profiled steel plate, and all the holes have the same size, and the longitudinal positions are kept consistent.
As shown in fig. 1 and 5, the inverted T-shaped diaphragm 4 according to this embodiment is connected to the corrugated steel plate 1 by a weld, and connected to the steel main beam web 64 by a high-strength bolt or a weld.
As shown in fig. 1 to 3 and 5, the height of the inverted T-shaped diaphragm 4 in this embodiment is 2 to 4 times that of the corrugated steel plate 1, and the connection areas with the corrugated steel plate 1 and the steel girder web 64 are provided with arc-shaped notches.
As shown in fig. 1 to 3 and 5 to 6, in the embodiment, the corrugated steel plate 1, the profiled steel plate 2 and the steel main beam upper flange 61 are all provided with high-strength bolt holes matched with each other, and when the corrugated steel plate, the profiled steel plate and the steel main beam web 64 are connected by high-strength bolts, the steel main beam web 64 is also provided with high-strength bolt holes matched with each other.
As shown in fig. 1 to 6, the holed steel plates of the PBL shear connector 3 according to the present embodiment are respectively disposed at the horizontal middle positions of the straight section and the concave section of the profiled steel plate 1, the concave section steel bars 33 horizontally and continuously pass through the concave section holed steel plates 31, and the straight section steel bars 34 horizontally and continuously pass through the straight section holed steel plates 32.
As shown in fig. 1 to 6, the concrete cast in situ on the profiled steel sheet 2 in this embodiment is ultra-high performance concrete 5, and the casting thickness is 40mm to 60 mm.
As shown in fig. 1 to 6, the corrugated steel plate 1 and the profiled steel plate 2 in this embodiment are connected by high-strength bolts when they are longitudinally spliced, and the longitudinal seam interval between the corrugated steel plate 1 and the profiled steel plate 2 is more than 500 mm.
In light of the foregoing description of the preferred embodiments according to the present application, it is to be understood that various changes and modifications may be made without departing from the spirit and scope of the invention. The technical scope of the present application is not limited to the contents of the specification, and must be determined according to the scope of the claims.

Claims (9)

1.一种装配式组合钢桥面板结构,其特征在于,包括:1. an assembled composite steel bridge deck structure, is characterized in that, comprises: 波折钢板(1),包括交替设置的平直段和下凹段;A corrugated steel plate (1), comprising alternately arranged straight sections and concave sections; 压型钢板(2),包括交替设置的平直段和下凹段并对应于所述波折钢板(1)设置,所述波折钢板(1)与所述压型钢板(2)的下凹段之间通过高强度结构胶连接,所述波折钢板(1)与压型钢板(2)所述的平直段之间通过高强螺栓进行连接;A profiled steel plate (2), comprising alternately arranged straight sections and concave sections and arranged corresponding to the corrugated steel plate (1), the corrugated steel plate (1) and the concave section of the profiled steel plate (2) They are connected by high-strength structural glue, and high-strength bolts are used to connect the corrugated steel plate (1) and the straight section of the profiled steel plate (2); 所述波折钢板(1)和压型钢板(2)通过高强螺栓与钢主梁(6)连接;The corrugated steel plate (1) and the profiled steel plate (2) are connected to the steel main beam (6) through high-strength bolts; 倒T形横隔板(4),上沿轮廓与所述波折钢板(1)匹配,所述倒T形横隔板(4)的上沿与所述波折钢板(1)通过焊接连接,所述倒T形横隔板(4)两侧分别与所述钢主梁(6)通过高强螺栓或焊缝连接;The upper edge of the inverted T-shaped diaphragm (4) is matched with the corrugated steel plate (1), and the upper edge of the inverted T-shaped diaphragm (4) is connected with the corrugated steel plate (1) by welding, so Both sides of the inverted T-shaped diaphragm (4) are respectively connected with the steel main beam (6) by high-strength bolts or welds; PBL剪力连接件(3),嵌入布置于所述压型钢板(2)上方;The PBL shear connector (3) is embedded and arranged above the profiled steel plate (2); 超高性能混凝土(5),浇筑在所述压型钢板(2)上方并覆盖所述PBL剪力连接件(3)。The ultra-high performance concrete (5) is poured above the profiled steel plate (2) and covers the PBL shear connector (3). 2.根据权利要求1所述的装配式组合钢桥面板结构,其特征在于,所述PBL剪力连接件(3)包括:2. The prefabricated composite steel bridge deck structure according to claim 1, wherein the PBL shear connector (3) comprises: 下凹段挖孔钢板(31),沿桥梁长度方向设置,设置于所述压型钢板(2)的下凹段内;The concave section digging steel plate (31) is arranged along the length direction of the bridge, and is arranged in the concave section of the profiled steel plate (2); 平直段挖孔钢板(32),沿桥梁长度方向设置,设置于所述压型钢板(2)的平直段内;The straight section digging steel plate (32) is arranged along the length direction of the bridge, and is arranged in the straight section of the profiled steel plate (2); 下凹段钢筋(33),横向布置,设置于所述压型钢板(2)的下凹段内;Reinforcing bars (33) in the concave section, arranged laterally, are arranged in the concave section of the profiled steel plate (2); 平直段钢筋(34),横向布置,设置于所述压型钢板(2)的平直段。The straight section reinforcement bars (34) are arranged horizontally and are arranged on the straight section of the profiled steel plate (2). 3.根据权利要求1-2任一项所述的装配式组合钢桥面板结构,其特征在于,所述倒T形横隔板(4)包括:3. The fabricated composite steel bridge deck structure according to any one of claims 1-2, wherein the inverted T-shaped diaphragm (4) comprises: 横隔板腹板(41),竖向设置,上沿轮廓与所述波折钢板(1)匹配;The diaphragm web (41) is arranged vertically, and the contour of the upper edge matches the corrugated steel plate (1); 横隔板下翼缘(42),水平设置,固定在所述横隔板腹板(41)下方,与所述横隔板腹板(41)呈T字形连接。The lower flange (42) of the diaphragm is arranged horizontally, is fixed under the web (41) of the diaphragm, and is connected with the web (41) of the diaphragm in a T-shape. 4.根据权利要求1-2任一项所述的装配式组合钢桥面板结构,其特征在于,所述钢主梁(6)包括:4. The fabricated composite steel bridge deck structure according to any one of claims 1-2, wherein the steel main beam (6) comprises: 钢主梁上翼缘(61),水平设置;Steel main girder upper flange (61), set horizontally; 钢主梁腹板(62),竖向设置;Steel main beam web (62), set vertically; 钢主梁下翼缘(63),水平设置,固定在所述钢主梁腹板(61)下方,与所述钢主梁腹板(61)呈T字形连接。The lower flange (63) of the steel main girder is arranged horizontally, fixed under the steel main girder web (61), and connected with the steel main girder web (61) in a T-shape. 腹板加劲肋(64),横向设置,与所述钢主梁腹板(62)采用焊接连接,与钢主梁上翼缘(61)、钢主梁下翼缘(63)磨光顶紧,纵向间隔一定距离布置一道。The web stiffening rib (64) is arranged horizontally, and is connected with the steel main beam web (62) by welding, and is ground and tight with the steel main beam upper flange (61) and the steel main beam lower flange (63), longitudinally Arrange them at a certain distance. 5.根据权利要求1-2任一项所述的装配式组合钢桥面板结构,其特征在于,所述压型钢板(2)高度低于波折钢板(1)的高度的一半,压型钢板(2)和波折钢板(1)的波折角度一致,以保证二者贴合紧密;所述的压型钢板(2)与波折钢板(1)之间的高强度结构胶厚度为3~5mm;5. The prefabricated composite steel bridge deck structure according to any one of claims 1-2, wherein the height of the profiled steel plate (2) is lower than half of the height of the corrugated steel plate (1), and the profiled steel plate (2) The bending angle of the corrugated steel plate (1) is the same to ensure that the two are closely attached; the thickness of the high-strength structural adhesive between the profiled steel plate (2) and the corrugated steel plate (1) is 3-5 mm; 所述的倒T形横隔板(4)高度为波折钢板(1)的2~4倍,在与波折钢板(1)、钢主梁腹板(62)连接区域均设有弧形切口。The height of the inverted T-shaped diaphragm (4) is 2 to 4 times that of the corrugated steel plate (1), and arc-shaped incisions are provided in the connection area with the corrugated steel plate (1) and the steel main beam web (62). 6.根据权利要求2所述的装配式组合钢桥面板结构,其特征在于,所述平直段挖孔钢板(32)上的所有开孔高度一致,下凹段挖孔钢板(31)的开孔高度为压型钢板(2)高度的一半,且所有孔径大小相同,纵向位置保持一致。The prefabricated composite steel bridge deck structure according to claim 2, characterized in that, all the openings on the straight section digging steel plate (32) have the same height, and the concave section digging steel plate (31) has the same height. The height of the opening is half of the height of the profiled steel plate (2), and all the apertures are of the same size, and the longitudinal positions are kept the same. 7.根据权利要求2所述的装配式组合钢桥面板结构,其特征在于,所述下凹段挖孔钢板(31)、平直段挖孔钢板(32)分别布设在压型钢板(2)下凹段、平直段的横向中间位置,下凹段钢筋(33)横向连续穿过下凹段挖孔钢板(31),平直段钢筋(34)横向连续穿过平直段挖孔钢板(32)。The prefabricated composite steel bridge deck structure according to claim 2, characterized in that, the hole-drilling steel plate (31) in the concave section and the hole-drilling steel plate (32) in the straight section are respectively arranged on the profiled steel plate (2). ) The horizontal middle position of the concave section and the straight section, the steel bars (33) of the concave section continuously pass through the hollow steel plate (31) of the concave section, and the steel bars (34) of the straight section continue to pass through the straight section to dig holes horizontally. Steel plate (32). 8.根据权利要求1所述的装配式组合钢桥面板结构,其特征在于,所述超高性能混凝土的浇筑厚度为40mm~60mm。8 . The fabricated composite steel bridge deck structure according to claim 1 , wherein the pouring thickness of the ultra-high performance concrete is 40 mm to 60 mm. 9 . 9.根据权利要求1所述的装配式组合钢桥面板结构,其特征在于,所述的波折钢板(1)、压型钢板(2)的纵向接缝间隔500mm以上。9 . The fabricated composite steel bridge deck structure according to claim 1 , wherein the longitudinal seam interval between the corrugated steel plates ( 1 ) and the profiled steel plates ( 2 ) is more than 500 mm. 10 .
CN202111135844.3A 2021-09-27 2021-09-27 Assembled combination steel bridge deck structure Active CN113718647B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111135844.3A CN113718647B (en) 2021-09-27 2021-09-27 Assembled combination steel bridge deck structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111135844.3A CN113718647B (en) 2021-09-27 2021-09-27 Assembled combination steel bridge deck structure

Publications (2)

Publication Number Publication Date
CN113718647A true CN113718647A (en) 2021-11-30
CN113718647B CN113718647B (en) 2022-10-14

Family

ID=78685097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111135844.3A Active CN113718647B (en) 2021-09-27 2021-09-27 Assembled combination steel bridge deck structure

Country Status (1)

Country Link
CN (1) CN113718647B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116084279A (en) * 2022-12-13 2023-05-09 南京铁路建设投资有限责任公司 A prefabricated steel-UHPC composite deck girder for pedestrian bridges and its bridge
CN118110063A (en) * 2024-02-02 2024-05-31 中国建筑第五工程局有限公司 A lightweight steel-concrete composite track beam structure and design method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder
CN109024216A (en) * 2018-09-30 2018-12-18 西南交通大学 Composite Steel-Concrete Bridges structure and combined bridge deck
CN212612048U (en) * 2020-05-19 2021-02-26 河南省交通规划设计研究院股份有限公司 Local reinforcement structure of steel decking roof fracture
CN112921802A (en) * 2021-02-22 2021-06-08 山东省交通规划设计院集团有限公司 Profiled steel sheet-ultra-high toughness concrete combined bridge deck

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder
CN109024216A (en) * 2018-09-30 2018-12-18 西南交通大学 Composite Steel-Concrete Bridges structure and combined bridge deck
CN212612048U (en) * 2020-05-19 2021-02-26 河南省交通规划设计研究院股份有限公司 Local reinforcement structure of steel decking roof fracture
CN112921802A (en) * 2021-02-22 2021-06-08 山东省交通规划设计院集团有限公司 Profiled steel sheet-ultra-high toughness concrete combined bridge deck

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116084279A (en) * 2022-12-13 2023-05-09 南京铁路建设投资有限责任公司 A prefabricated steel-UHPC composite deck girder for pedestrian bridges and its bridge
CN118110063A (en) * 2024-02-02 2024-05-31 中国建筑第五工程局有限公司 A lightweight steel-concrete composite track beam structure and design method

Also Published As

Publication number Publication date
CN113718647B (en) 2022-10-14

Similar Documents

Publication Publication Date Title
CN106677051B (en) A kind of steel boxboard beam mixing beam bridge suitable for mountain area condition
CN106930181A (en) A kind of simple-supported thencontinuous steel reinforced concrete combined bridge hogging moment area structure
CN112900262A (en) Combined bridge deck structure of bridge, bridge structure and construction method of bridge structure
CN113718647A (en) Assembled combination steel bridge deck structure
CN107938525A (en) Reinforcement structure and method of an assembled continuous box girder
CN111139746A (en) Orthotropic steel deck and ultra-high performance concrete composite bridge and its construction method
CN109208473B (en) Combined bridge deck structure stiffened by adopting flat-bulb steel, construction method thereof and bridge structure
CN105780649B (en) Recessed rib weathering steel concrete combined bridge deck
CN212426678U (en) Assembled light steel sheet composite beam bridge structure
CN106012806A (en) Hollow slab hinge joint shear connection structure and construction process
CN217974005U (en) Combined box girder structure
CN202990196U (en) Partially prestressed prefabricated thin plate
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN106948262B (en) A kind of Orthotropic Steel Bridge Deck structure with lateral binder
CN103911948B (en) Be applied to horizontal purlin formula steel work and the construction method thereof of wide concrete rib plate-girder
CN212270685U (en) Orthotropic steel bridge deck slab and ultra-high performance concrete combined bridge
CN220414002U (en) U-shaped stiffening rib orthotropic steel bridge deck connected by battens
CN207062768U (en) The trapezoidal ripple batten attachment structure of combined bridge deck
CN218027143U (en) Double-rib type longitudinal rib and bridge deck structure
CN214005367U (en) Steel box composite beam bridge structure with truss brace rod
CN114622485B (en) Pier top cast-in-situ joint structure adopting embedded steel strip and construction method thereof
CN216360844U (en) Prefabricated assembled multi-limb steel reinforced concrete beam
CN215758474U (en) Assembled steel bridge of U-shaped section steel box girder
CN116201008A (en) UHPC-CSW wet joint structure of prefabricated bridge deck and its construction method
CN213772887U (en) Section steel, section steel-UHPC composite slab, bridge deck and steel-UHPC composite girder bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant