[go: up one dir, main page]

CN204464856U - A construction site temporary power cable erection device - Google Patents

A construction site temporary power cable erection device Download PDF

Info

Publication number
CN204464856U
CN204464856U CN201520104321.6U CN201520104321U CN204464856U CN 204464856 U CN204464856 U CN 204464856U CN 201520104321 U CN201520104321 U CN 201520104321U CN 204464856 U CN204464856 U CN 204464856U
Authority
CN
China
Prior art keywords
construction site
erection device
construction
job site
electrical cables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520104321.6U
Other languages
Chinese (zh)
Inventor
陈超
吴忠强
范荣辉
周伟
宋自杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201520104321.6U priority Critical patent/CN204464856U/en
Application granted granted Critical
Publication of CN204464856U publication Critical patent/CN204464856U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model provides a kind of job site and faces electrical cables stringer, belongs to the technical field of installing cables equipment, faces high, the not manageable problem of electrical cables installation cost for solving existing job site.This job site is faced electrical cables stringer and is comprised the connector be fixed on the enclosure wall of job site, and be fixed with at least one porcelain bottle insulators at connector away from the side of enclosure wall, porcelain bottle insulators is fixedly connected with connector by fixture.This job site is faced electrical cables stringer and is made job site face electrical cables to obtain more appropriate arrangement, make appearance field, the field looks that job site keeps good.In addition, job site is faced electrical cables and is set up on device, away from construction ground, can not be subject to the destruction of the construction machineries such as construction site excavator.And it is convenient, reusable that the installation of electrical cables stringer is faced in this job site, provides cost savings.

Description

一种施工现场临电电缆架设装置A construction site temporary power cable erection device

技术领域technical field

本实用新型属于安装电缆设备的技术领域,具体涉及一种施工现场临电电缆架设装置。The utility model belongs to the technical field of installing cable equipment, and in particular relates to a construction site electric cable erecting device.

背景技术Background technique

电是施工中不可或缺的一部分,施工现场的临电电缆架设在现场供电系统中起着举足轻重的作用。目前,施工现场临电电缆敷设具有较大的随意性,或者是传统的埋地敷设,或者是架空敷设。然而,前述几种敷设临电电缆的方式都存在明显的缺陷:一是,电缆随意摆放会使施工现场看起来非常凌乱,影响场容场貌;且电缆随意摆放在场地四周,很容易被施工机械损害,存在很大的安全隐患。且电缆一旦漏电,势必会造成停工,也会对工程施工产生很大的影响。二是,采用埋地电缆敷设的缺点在于影响地下建筑施工,虽然可以采取适当措施加以避免和保护,但仍很不方便。电缆敷设完后要采用铺砂盖砖保护、过路增加过路管保护措施、电缆沟回填完毕后在电缆沟上设立电缆标志桩明确电缆敷设位置等措施,这大多都是不可回收利用的材料,所以增加了相当大的成本。且电缆埋在地里,不易于管理,容易被破坏。三是,采用架空敷设电缆移位不便。当出现一根架空电杆影响地下或者地上施工的情况时,需要将整排电杆移位。在进行电杆移位时,需要拆除整根架空电缆,拆除架空钢绞线,拆除成排电杆,然后重新挖杆坑进行电杆、架空钢索和电缆的架空施工。这样,往往需要好几天时间进行抢修,在很大程度上影响工程工期,而且架空敷设临电电缆会导致整个施工区域布置不美观,施工成本造价高。Electricity is an indispensable part of construction, and the erection of power cables on the construction site plays a pivotal role in the on-site power supply system. At present, the laying of power cables on the construction site is relatively random, either traditional buried laying or overhead laying. However, there are obvious defects in the above-mentioned methods of laying power cables: First, random placement of cables will make the construction site look very messy and affect the appearance of the site; and cables are randomly placed around the site, which is easy to Damaged by construction machinery, there is a great potential safety hazard. And once the cable leaks, it will inevitably cause a shutdown, and it will also have a great impact on the construction of the project. The second is that the disadvantage of adopting buried cable laying is that it affects the construction of underground buildings. Although appropriate measures can be taken to avoid and protect it, it is still very inconvenient. After the cable is laid, it is necessary to adopt measures such as laying sand and covering bricks for protection, adding protective measures for passing pipes, and setting up cable markers on the cable trench after the cable trench is backfilled to clarify the location of the cable laying. Most of these are non-recyclable materials, so Added considerable cost. And the cable is buried in the ground, which is not easy to manage and is easily damaged. Third, it is inconvenient to use aerial laying cables to shift. When an overhead pole affects underground or above-ground construction, the entire row of poles needs to be displaced. When carrying out electric pole shifting, need to dismantle whole root overhead cable, remove overhead steel strand, dismantle row electric pole, then re-dig pole hole and carry out overhead construction of electric pole, overhead steel cable and cable. Like this, it often takes several days to carry out emergency repairs, which affects the construction period to a large extent, and overhead laying of power cables will cause the layout of the entire construction area to be unsightly, and the construction cost will be high.

因此,提供一种施工方便,施工成本低的施工现场临电电缆架设装置是本领域技术人员亟需探索的一个问题。Therefore, it is a problem urgently needed to be explored by those skilled in the art to provide a convenient construction and low construction cost erection device for power cables on the construction site.

实用新型内容Utility model content

本实用新型的目的在于提供一种施工现场临电电缆架设装置,用于解决现有的施工现场临电电缆任意架设或者埋地敷设或者架空敷设所造成的影响施工现场的整齐、美观性,且移位不便的问题,提供一种更方便、可重复使用的施工现场临电电缆的架设装置,使得施工现场临电电缆的高效、便捷安装,从而保证施工现场的正常供电。The purpose of this utility model is to provide a construction site electric cable erection device, which is used to solve the problems caused by the random erection of the existing construction site electric cables, buried laying or overhead laying, which affect the orderliness and aesthetics of the construction site, and To solve the problem of inconvenient displacement, a more convenient and reusable erection device for power supply cables on the construction site is provided, which enables efficient and convenient installation of power supply cables on the construction site, thereby ensuring normal power supply at the construction site.

为了实现上述目的,本实用新型所提供的技术方案如下:In order to achieve the above object, the technical scheme provided by the utility model is as follows:

一种施工现场临电电缆架设装置,包括固定在所述施工现场围墙上的连接件,在所述连接件远离所述围墙的一侧固装有至少一个瓷瓶绝缘子,所述瓷瓶绝缘子通过固定件与所述连接件固定连接。A device for erecting electric cables on a construction site, comprising a connecting piece fixed on the fence wall of the construction site, at least one porcelain bottle insulator is fixed on the side of the connecting piece away from the fence wall, and the porcelain bottle insulator passes through the fixing piece It is fixedly connected with the connector.

进一步地,所述连接件通过设置于所述围墙内的锚固件锚固于所述围墙上。Further, the connecting piece is anchored to the surrounding wall through an anchor provided in the surrounding wall.

进一步地,所述连接件为腹背垂直于所述围墙设置的槽钢。Further, the connecting piece is a channel steel whose belly and back are arranged perpendicular to the enclosure wall.

进一步地,所述固定件与所述连接件焊接固定。Further, the fixing part is welded and fixed to the connecting part.

进一步地,所述固定件为50mm×50mm×5mm的角钢。Further, the fixing piece is an angle steel of 50mm×50mm×5mm.

进一步地,所述瓷瓶绝缘子与所述固定件螺栓连接。Further, the porcelain bottle insulator is bolted to the fixing member.

进一步地,所述瓷瓶绝缘子的上端和下端分别设有限位螺母,所述限位螺母与所述连接件固定连接。Further, the upper end and the lower end of the porcelain bottle insulator are respectively provided with stop nuts, and the stop nuts are fixedly connected with the connecting piece.

进一步地,相邻两个所述瓷瓶绝缘子的竖向距离为200-300mm。Further, the vertical distance between two adjacent porcelain bottle insulators is 200-300mm.

进一步地,所述连接件下端与所述围墙底端的垂直距离为800-1000mm。Further, the vertical distance between the lower end of the connecting piece and the bottom end of the enclosure wall is 800-1000 mm.

本实用新型与现有技术相比,具有如下优点和有益效果:本实用新型的施工现场临电电缆架设装置,包括固定在施工现场围墙上的连接件,在连接件远离围墙的一侧固装有至少一个瓷瓶绝缘子,瓷瓶绝缘子通过固定件与连接件固定连接。该施工现场临电电缆架设装置使得施工现场临电电缆得到较妥当的安置,使得施工现场保持良好的场容场貌。此外,施工现场临电电缆架设于架设装置上,远离施工场地地面,不会受到施工场地挖土机等施工机械的破坏。而且,在整个施工过程中,施工现场临电电缆架设装置无需移位。同时,该施工现场临电电缆架设装置可重复使用,节省了成本。Compared with the prior art, the utility model has the following advantages and beneficial effects: the construction site electric cable erection device of the utility model includes a connector fixed on the fence wall of the construction site, and the connector is fixed on the side away from the fence wall There is at least one porcelain bottle insulator, and the porcelain bottle insulator is fixedly connected with the connecting piece through the fixing piece. The erection device for the power supply cable on the construction site enables the power supply cable on the construction site to be properly arranged, so that the construction site maintains a good site appearance. In addition, the power cables at the construction site are erected on the erection device, away from the ground of the construction site, and will not be damaged by construction machinery such as excavators on the construction site. Moreover, during the entire construction process, the construction site power cable erection device does not need to be displaced. At the same time, the construction site temporary power cable erection device can be reused, which saves costs.

附图说明Description of drawings

图1是本实用新型一实施例的施工现场临电电缆架设装置的安装示意图。Fig. 1 is a schematic diagram of installation of a construction site power cable erection device according to an embodiment of the present invention.

图中:1-围墙,2-连接件,3-瓷瓶绝缘子,4-固定件,11-锚固件。In the figure: 1-wall, 2-connector, 3-ceramic insulator, 4-fixer, 11-anchor.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型提供的施工现场临电电缆架设装置作进一步描述。根据下面说明和权利要求书,本实用新型的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本实用新型实施例的目的。The construction site electric cable erection device provided by the utility model will be further described below in conjunction with the accompanying drawings and embodiments. According to the following description and claims, the advantages and features of the utility model will be more clear. It should be noted that all the drawings are in very simplified form and use inaccurate scales, which are only used to facilitate and clearly illustrate the purpose of the embodiment of the present utility model.

结合图1详细描述本实用新型施工现场临电电缆架设装置的结构以及安装方法。In conjunction with Fig. 1, the structure and installation method of the construction site electric cable erection device of the present utility model are described in detail.

如图1所示,一种施工现场临电电缆架设装置,包括固定在施工现场围墙1上的连接件2,在连接件2远离围墙1的一侧固装有至少一个瓷瓶绝缘子3,瓷瓶绝缘子3通过固定件4与连接件2固定连接。As shown in Figure 1, a construction site power cable erection device includes a connector 2 fixed on the construction site wall 1, at least one porcelain insulator 3 is fixed on the side of the connector 2 away from the wall 1, and the porcelain insulator 3 is fixedly connected with the connecting piece 2 through the fixing piece 4.

为了满足绿色环保施工的要求,施工现场临电电缆的布设也是影响施工现场环境的重要因素,故本实用新型中针对施工现场的实际情况,提供了一种适用于施工现场临电电缆安装的架设装置,该架设装置安装成本低、安装简单,且可重复利用。具体来说,通过在施工围墙1上固定连接件2,将用于直接承托施工临电电缆的瓷瓶绝缘子3通过固定件4固定设置于连接件2上。同时,在施工围墙的同一高度处每隔一定间距(大约2-3m)设置一个施工现场临电电缆的架设装置,从而保证施工临电电缆腾空架设,不会受到挖土等地面施工机械的破坏,从而使得施工现场的场容场貌得到改善。In order to meet the requirements of green and environmental protection construction, the layout of the power cables on the construction site is also an important factor affecting the environment of the construction site. The erection device is low in installation cost, simple in installation and reusable. Specifically, by fixing the connecting piece 2 on the construction enclosure wall 1, the porcelain insulator 3 used to directly support the construction power cable is fixed on the connecting piece 2 through the fixing piece 4. At the same time, at the same height of the construction wall, set up a construction site power cable erection device at a certain interval (about 2-3m), so as to ensure that the construction power cable is vacated and erected, and will not be damaged by ground construction machinery such as excavation , so that the appearance of the construction site is improved.

具体来说,连接件2通过设置于围墙1内的锚固件11锚固于围墙1上。锚固件11可以选择螺杆和锁固螺母。根据实际情况,可选地,螺杆的直径为14mm,螺杆的长度为280mm。为了取材和安装方便,连接件2为腹背垂直于围墙1设置的槽钢。根据施工临电电缆的安装高度,确定连接件2与围墙1底端之间的垂直距离。一般可以将连接件2下端与围墙1底端的垂直距离设为800mm-1000mm。同时,根据施工临电电缆的数目确定固定件4的个数,由于固定件4竖向间隔设置于连接件2上,故固定件4的个数决定连接件2本身的长度。为了节省成本,连接件2可以选择8#槽钢L=7002500。为了保证瓷瓶绝缘子3的安装牢固性,固定件4与连接件2焊接固定。瓷瓶绝缘子3与固定件4螺栓连接。固定件4选择50mm×50mm×5mm的角钢。Specifically, the connecting piece 2 is anchored on the enclosure wall 1 through the anchor piece 11 disposed in the enclosure wall 1 . The anchor piece 11 can choose screw rod and lock nut. According to actual conditions, optionally, the diameter of the screw rod is 14 mm, and the length of the screw rod is 280 mm. In order to obtain materials and facilitate installation, the connecting piece 2 is a channel steel whose belly and back are perpendicular to the enclosure wall 1 . Determine the vertical distance between the connector 2 and the bottom end of the enclosure wall 1 according to the installation height of the construction power supply cable. Generally, the vertical distance between the lower end of the connector 2 and the bottom end of the wall 1 can be set to 800mm-1000mm. Simultaneously, the number of fixing parts 4 is determined according to the number of construction power cables. Since the fixing parts 4 are vertically spaced on the connecting part 2, the number of fixing parts 4 determines the length of the connecting part 2 itself. In order to save cost, the connector 2 can choose 8# channel steel L=7002500. In order to ensure the firmness of the installation of the porcelain bottle insulator 3, the fixing part 4 and the connecting part 2 are welded and fixed. The porcelain bottle insulator 3 is bolted to the fixing piece 4 . The angle steel of 50mm×50mm×5mm is selected as the fixing piece 4 .

较佳地,为了保证水平方向上相邻的两个施工现场临电电缆架设装置中的瓷瓶绝缘子3距离地面的高度一致,从而安全、稳定地架设临电电缆,瓷瓶绝缘子3的上端和下端分别设有限位螺母,限位螺母与连接件2固定连接。与此同时,为了防止竖向相邻的两根临电电缆互相接触,从而导致安全隐患,相邻两个瓷瓶绝缘子的竖向距离为200mm-300mm。Preferably, in order to ensure that the heights of the porcelain insulators 3 in the erection devices of adjacent power cables at two adjacent construction sites in the horizontal direction are consistent from the ground, so as to safely and stably erect the power cables, the upper and lower ends of the porcelain insulators 3 are respectively A limit nut is provided, and the limit nut is fixedly connected with the connecting piece 2 . At the same time, in order to prevent two vertically adjacent power cables from touching each other and causing potential safety hazards, the vertical distance between two adjacent porcelain insulators is 200mm-300mm.

下面继续参考图1,详细描述本实施例的施工现场临电电缆架设装置的安装方法。施工现场临电电缆架设装置的安装方法,包括如下步骤:The following will continue to refer to FIG. 1 to describe in detail the installation method of the construction site power cable erection device in this embodiment. The installation method of the erection device of the power cable on the construction site includes the following steps:

步骤一:围墙1内施工锚固件11,固定件4焊接固定于连接件2的预定位置上备用;Step 1: construct the anchor piece 11 in the enclosure wall 1, and the fixing piece 4 is welded and fixed on the predetermined position of the connecting piece 2 for standby;

步骤二:在拟安装位置的施工围墙1的墙面上放定位线,并作相应记号;Step 2: Place positioning lines on the wall surface of the construction fence 1 at the intended installation location, and make corresponding marks;

步骤三:用电锤等钻孔装置在拟定点定位打眼;Step 3: Use a drilling device such as an electric hammer to position and drill holes at the proposed point;

步骤四:将连接件2锚固于锚固件11上,并用锁固螺母锁紧;Step 4: Anchor the connecting piece 2 on the anchor piece 11, and lock it with a locking nut;

步骤五:安装限位螺母和瓷瓶绝缘子3。Step 5: Install limit nuts and porcelain insulators 3.

综上所述,本实用新型的施工现场临电电缆架设装置,包括固定在施工现场围墙上的连接件,在连接件远离围墙的一侧固装有至少一个瓷瓶绝缘子,瓷瓶绝缘子通过固定件与连接件固定连接。该施工现场临电电缆架设装置使得施工现场临电电缆得到较妥当的安置,使得施工现场保持良好的场容场貌。此外,施工现场临电电缆架设于架设装置上,远离施工场地地面,不会受到施工场地挖土等施工机械的破坏。而且,在整个施工过程中,施工现场临电电缆架设装置无需移位。同时,该施工现场临电电缆架设装置可重复使用,节省了成本。该施工现场临电电缆的架设装置方便、可重复使用,满足了施工现场临电电缆的高效、便捷安装,从而保证施工现场的正常供电。In summary, the erection device of the construction site electric cable of the present utility model includes a connector fixed on the fence wall of the construction site, and at least one porcelain insulator is fixed on the side of the connector far away from the fence, and the porcelain insulator passes through the fastener and The connecting piece is fixedly connected. The erection device for the power supply cable on the construction site enables the power supply cable on the construction site to be properly arranged, so that the construction site maintains a good site appearance. In addition, the power cables at the construction site are erected on the erection device, away from the ground of the construction site, and will not be damaged by construction machinery such as excavation at the construction site. Moreover, during the entire construction process, the construction site power cable erection device does not need to be displaced. At the same time, the construction site temporary power cable erection device can be reused, which saves costs. The erection device of the power supply cable at the construction site is convenient and reusable, which satisfies the efficient and convenient installation of the power supply cable at the construction site, thereby ensuring normal power supply at the construction site.

上述描述仅是对本实用新型较佳实施例的描述,并非对本实用新型范围的任何限定,本实用新型领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求书的保护范围。The above description is only a description of the preferred embodiments of the present utility model, and is not any limitation to the scope of the present utility model. Any changes and modifications made by those of ordinary skill in the field of the utility model according to the above disclosures all belong to the protection scope of the claims .

Claims (9)

1.一种施工现场临电电缆架设装置,其特征在于,包括固定在所述施工现场围墙上的连接件,在所述连接件远离所述围墙的一侧固装有至少一个瓷瓶绝缘子,所述瓷瓶绝缘子通过固定件与所述连接件固定连接。1. A construction site electric cable erection device is characterized in that, comprising a connector fixed on the fence wall of the construction site, at least one porcelain insulator is fixedly installed on the side of the connector far away from the fence wall, so The porcelain bottle insulator is fixedly connected with the connecting piece through a fixing piece. 2.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,所述连接件通过设置于所述围墙内的锚固件锚固于所述围墙上。2 . The erection device for power cables at the construction site according to claim 1 , wherein the connecting piece is anchored to the enclosure wall through an anchor piece arranged in the enclosure wall. 3 . 3.如权利要求2所述的施工现场临电电缆架设装置,其特征在于,所述连接件为腹背垂直于所述围墙设置的槽钢。3. The construction site electric cable erection device according to claim 2, characterized in that, the connecting piece is a channel steel whose back is perpendicular to the surrounding wall. 4.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,所述固定件与所述连接件焊接固定。4. The construction site power cable erection device according to claim 1, characterized in that the fixing part is welded and fixed to the connecting part. 5.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,所述固定件为50mm×50mm×5mm的角钢。5. The erection device for power cables at the construction site according to claim 1, wherein the fixing member is an angle steel of 50mm×50mm×5mm. 6.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,所述瓷瓶绝缘子与所述固定件螺栓连接。6. The erection device for power cables at the construction site according to claim 1, characterized in that, the porcelain insulator is connected with the fixing member by bolts. 7.如权利要求6所述的施工现场临电电缆架设装置,其特征在于,所述瓷瓶绝缘子的上端和下端分别设有限位螺母,所述限位螺母与所述连接件固定连接。7. The construction site electric cable erection device according to claim 6, characterized in that, the upper end and the lower end of the porcelain bottle insulator are respectively provided with stop nuts, and the stop nuts are fixedly connected with the connectors. 8.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,相邻两个所述瓷瓶绝缘子的竖向距离为200-300mm。8. The erection device for power cables at construction sites according to claim 1, wherein the vertical distance between two adjacent porcelain insulators is 200-300mm. 9.如权利要求1所述的施工现场临电电缆架设装置,其特征在于,所述连接件下端与所述围墙底端的垂直距离为800-1000mm。9. The erection device for power cables at the construction site according to claim 1, wherein the vertical distance between the lower end of the connector and the bottom end of the wall is 800-1000mm.
CN201520104321.6U 2015-02-13 2015-02-13 A construction site temporary power cable erection device Expired - Fee Related CN204464856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520104321.6U CN204464856U (en) 2015-02-13 2015-02-13 A construction site temporary power cable erection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520104321.6U CN204464856U (en) 2015-02-13 2015-02-13 A construction site temporary power cable erection device

Publications (1)

Publication Number Publication Date
CN204464856U true CN204464856U (en) 2015-07-08

Family

ID=53671683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520104321.6U Expired - Fee Related CN204464856U (en) 2015-02-13 2015-02-13 A construction site temporary power cable erection device

Country Status (1)

Country Link
CN (1) CN204464856U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410718A (en) * 2016-11-01 2017-02-15 金螳螂精装科技(苏州)有限公司 Construction site temporary power supply erecting system
CN112086917A (en) * 2020-09-28 2020-12-15 上海公路桥梁(集团)有限公司 Temporary power cable bracket and temporary enclosing wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410718A (en) * 2016-11-01 2017-02-15 金螳螂精装科技(苏州)有限公司 Construction site temporary power supply erecting system
CN112086917A (en) * 2020-09-28 2020-12-15 上海公路桥梁(集团)有限公司 Temporary power cable bracket and temporary enclosing wall

Similar Documents

Publication Publication Date Title
KR101608624B1 (en) Method for lifting the height of tower
CN109695247B (en) Deep foundation pit temporary pipeline comprehensive arrangement system and construction method
CN204464856U (en) A construction site temporary power cable erection device
CN104993440A (en) Lightning-protection manual grounding system and construction method by utilizing structure steel bar externally-connected downlead wire
CN204081115U (en) The windproof bracing means of a kind of mobile factory building
CN209686448U (en) A sheet-bolted prefabricated integrated pipe gallery and its pipe gallery unit
CN204097891U (en) Reinforced concrete prefabricated square culvert
CN209562092U (en) Ground type cable intermediate joint box
CN206099263U (en) Assembled cable pipe installation structure
CN102787597B (en) Multi-cable recyclable anchor cable head connecting device
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN205206451U (en) Wire pole and electric wire protective case
CN104499655A (en) Lightning protection device of building roof
CN205642810U (en) Tunnel lock foot anchor pipe vertical bearing capacity test device
CN211859552U (en) A low-voltage shallow grooved cable trench
CN115313292A (en) Cable down-hole and method for laying cable in cable down-hole
CN204676515U (en) A kind of offshore boosting station adopting High-Rise Pile Cap Foundation
CN204728365U (en) A kind of aqueduct valve well mounting structure
CN204875526U (en) Big steel pipe support constructional device of combination casing assembled
CN209723030U (en) A prefabricated integrated pipe gallery assembly unit
CN207130768U (en) A kind of support suitable for pipe gallery slope section sets up structure
KR100654166B1 (en) Underground electrical cable shielding structure in building complex
CN216413520U (en) Temporary basement power supply system
CN106803653A (en) A kind of fixing means of distribution line
CN105672331B (en) A kind of vertical outer drawing ground anchor peg tube seat foundation ditch dado structure and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708