CN206417172U - Lock set is tethered at for captive balloon - Google Patents
Lock set is tethered at for captive balloon Download PDFInfo
- Publication number
- CN206417172U CN206417172U CN201621481234.3U CN201621481234U CN206417172U CN 206417172 U CN206417172 U CN 206417172U CN 201621481234 U CN201621481234 U CN 201621481234U CN 206417172 U CN206417172 U CN 206417172U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- cable
- wire rope
- lock assembly
- mooring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 210000004907 gland Anatomy 0.000 claims description 9
- 230000004308 accommodation Effects 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 description 4
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000001307 helium Substances 0.000 description 1
- 229910052734 helium Inorganic materials 0.000 description 1
- SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical compound [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及系留气球的回收辅助设备领域,具体而言,涉及用于系留气球的系留锁组件。The utility model relates to the field of recovery auxiliary equipment for tethered balloons, in particular to a tethered lock assembly for tethered balloons.
背景技术Background technique
系留气球属于浮空器的一种,其利用球体内气体(氦气)的浮力实现空中浮升。系留气球载荷可用于AIS监测、大气环境监测、治安和火情监测、广域物联网覆盖等民用领域,还可用于空中预警、电子对抗、技术侦查与监控等军用领域。无论是在空中系留和地面锚泊状态,为将系留气球停留在空气中,均需要通过缆绳、锚泊架等平衡气球浮力和风力扰动。为此,系留气球必须设置系留缆绳和锚泊缆绳,在空中系留状态,通过系留缆绳配合缆绳收放装置实现空中系留;在锚泊状态,通过锚泊缆绳配合左右指标、辅助绞车及头锥锁实现地面锚泊。The tethered balloon belongs to a kind of aerostat, which utilizes the buoyancy of the gas (helium) in the sphere to achieve floating in the air. Tethered balloon payloads can be used in civil fields such as AIS monitoring, atmospheric environment monitoring, public security and fire monitoring, and wide-area Internet of Things coverage, as well as military fields such as air early warning, electronic countermeasures, technical investigation and monitoring. Regardless of whether it is moored in the air or anchored on the ground, in order to keep the tethered balloon in the air, it is necessary to balance the buoyancy and wind disturbance of the balloon through cables and mooring frames. For this reason, the tethered balloon must be equipped with mooring cables and mooring cables. In the mooring state, the tethering in the air is realized through the mooring cables and the cable retracting device; Cone lock enables ground mooring.
现有浮空器头锥锁均需与电气控制系统配合使用,通过控制程序可实现锁销的开启与关闭,但因其增加了接近开关和动作执行机构,致使其结构复杂,可靠性降低。当电气系统出现故障后,采用手工进行应急操作不便。现有浮空器头锥锁还存在系留气球无法实现俯仰和周向转动自由变化问题。The existing aerostat nose cone locks need to be used in conjunction with the electrical control system. The opening and closing of the lock pin can be realized through the control program. However, due to the addition of proximity switches and action actuators, the structure is complicated and the reliability is reduced. When the electrical system breaks down, it is inconvenient to use manual emergency operations. The existing aerostat nose cone lock also has the problem that the tethered balloon cannot realize free changes in pitch and circumferential rotation.
例如,中国专利CN202807088公开了一种带有感应控制机构的浮空器头锥锁,该浮空器头锥锁需与电气控制系统配合使用,通过控制程序可实现锁销的开启与关闭,但因其增加了接近开关和动作执行机构,致使其结构复杂,可靠性降低。当电气系统出现故障后,采用手工进行应急操作不便。For example, Chinese patent CN202807088 discloses an aerostat nose cone lock with an induction control mechanism. The aerostat nose cone lock needs to be used in conjunction with an electrical control system. The opening and closing of the lock pin can be realized through the control program, but Because of the addition of a proximity switch and an action actuator, the structure is complicated and the reliability is reduced. When the electrical system breaks down, it is inconvenient to use manual emergency operations.
中国专利CN203681862公开了一种锁栓式浮空器头锥锁,该方案只能实现微动俯仰单自由度的需求,当系留气球受瞬时侧向力时,产生巨大扭矩,威胁到头锥锁的结构可靠性。Chinese patent CN203681862 discloses a lock type aerostat nose cone lock. This solution can only meet the requirement of a single degree of freedom for micro-motion pitching. When the tethered balloon is subjected to instantaneous lateral force, a huge torque is generated, threatening the nose cone lock. structural reliability.
上述两种头锥锁方案都配合定滑轮使用,更换钢丝绳都比较繁琐和困难。Both of the above two nose cone lock schemes are used in conjunction with the fixed pulley, and it is cumbersome and difficult to replace the wire rope.
实用新型内容Utility model content
针对相关技术中的问题,本实用新型提出一种能够快速更换钢丝绳的用于系留气球的系留锁组件。Aiming at the problems in the related art, the utility model proposes a mooring lock assembly for mooring balloons that can quickly replace the wire rope.
根据本实用新型的实施例,提供了用于系留气球的系留锁组件,包括:彼此枢转连接的头锥伸出杆和引导部、以及与引导部固定连接的缆绳组件,其中,缆绳组件包括具有钢丝绳头的缆绳和能够容纳在引导部中的绳头套管,绳头套管的侧壁设置有供钢丝绳头和缆绳进出的贯穿切口,其中,钢丝绳头容纳并保持在绳头套管中且缆绳由绳头套管伸出并穿过引导部。According to an embodiment of the present invention, a tethering lock assembly for tethering a balloon is provided, comprising: a nose cone extension rod and a guide part pivotally connected to each other, and a cable assembly fixedly connected to the guide part, wherein the cable The assembly includes a cable with a wire rope end and a rope end sleeve capable of being accommodated in the guide, the side wall of the rope end sleeve is provided with a through cut for the wire rope end and the cable to enter and exit, wherein the wire rope end is accommodated and held in the rope end sleeve and The cable protrudes from the rope end sleeve and passes through the guide.
根据本实用新型的实施例,绳头套管具有设置有贯穿切口的环状侧壁、和与环状侧壁连接的底部止挡部,其中,钢丝绳头容纳在由环状侧壁围成的容纳空间中,并且与底部止挡部抵压接触。According to an embodiment of the present invention, the rope end sleeve has an annular side wall provided with a through cut, and a bottom stop connected to the annular side wall, wherein the wire rope end is accommodated in the housing surrounded by the annular side wall. in the space, and is in press contact with the bottom stop.
根据本实用新型的实施例,底部止挡部为由环状侧壁突出的至少一个止挡凸块;或者底部止挡部为由环状侧壁突出环状止挡凸缘。According to an embodiment of the present invention, the bottom stopper is at least one stopper protrusion protruding from the annular sidewall; or the bottom stopper is an annular stopper flange protruding from the annular sidewall.
根据本实用新型的实施例,贯穿切口沿绳头套管的轴线方向延伸,并且贯穿切口的宽度至少等于缆绳的直径。According to an embodiment of the present invention, the through-cut extends along the axis of the rope head sleeve, and the width of the through-cut is at least equal to the diameter of the cable.
根据本实用新型的实施例,还包括:通过压盖螺钉与引导部可拆卸连接的绳头压盖,其中,绳头压盖与钢丝绳头和绳头套管抵压接触。According to an embodiment of the present invention, it further includes: a rope end gland detachably connected to the guide part through a gland screw, wherein the rope end gland is in pressure contact with the steel wire rope end and the rope end casing.
根据本实用新型的实施例,还包括套管支架,缆绳组件的自由端延伸穿过套管支架并且引导部能够在分别位于套管支架内部和外部的容纳位置和自由位置之间移动,其中在容纳位置,设置在套管支架上的锁扣组件卡接引导部,并且引导部能够在套管支架中旋转。According to an embodiment of the present invention, further comprising a casing support, the free end of the cable assembly extends through the casing support and the guide part is movable between a receiving position and a free position respectively located inside and outside the casing support, wherein In the storage position, the locking assembly arranged on the sleeve bracket engages with the guide part, and the guide part can rotate in the sleeve bracket.
根据本实用新型的实施例,锁扣组件包括设置在套管支架外壁的基座、以及能够在基座中移动以进入或离开套管支架的内部的插销,其中,引导部的外侧壁设置有凹槽,并且在容纳位置插销进入套管支架的内部并卡接在凹槽中。According to an embodiment of the present invention, the locking assembly includes a base provided on the outer wall of the sleeve support, and a latch capable of moving in the base to enter or leave the inside of the sleeve support, wherein the outer wall of the guide part is provided with a concave slot, and the pin enters the inside of the bushing bracket in the receiving position and snaps into the groove.
根据本实用新型的实施例,锁扣组件的数量为至少两个,且锁扣组件围绕套管支架的外侧壁等间距设置。According to an embodiment of the present invention, there are at least two locking components, and the locking components are equidistantly arranged around the outer wall of the casing bracket.
根据本实用新型的实施例,套管支架具有倒锥形的第一端部、和与支撑基座固定连接的第二端部,其中,缆绳组件由第一端部伸入套管支架并由第二端部伸出且与外置绞盘连接。According to an embodiment of the present invention, the bushing support has an inverted tapered first end and a second end fixedly connected to the support base, wherein the cable assembly extends into the bushing support from the first end and is The second end protrudes and is connected with the external winch.
根据本实用新型的实施例,头锥伸出杆和引导部之间通过销轴枢转连接,其中,销轴的其中一端设置有止挡凸缘,销轴的杆段穿过头锥伸出杆和引导部以将二者枢转连接,并且销轴的外露的另一端设置有可插拔的保险销。According to an embodiment of the present invention, the nose cone extension rod and the guide part are pivotally connected by a pin shaft, wherein one end of the pin shaft is provided with a stopper flange, and the rod section of the pin shaft passes through the nose cone extension rod and the guide part to pivotally connect the two, and the other exposed end of the pin shaft is provided with a pluggable safety pin.
本实用新型的有益之处在于:The utility model is beneficial in that:
在本实用新型涉及的系留锁组件中,绳头套管的侧壁设置有供钢丝绳头和缆绳进出的贯穿切口,当需要更换钢丝绳时,仅需将钢丝绳头通过贯穿切口从绳头套管中取出,以更换钢丝绳;当安装钢丝绳时,再次使钢丝绳头穿过贯穿切口进入绳头套管内部,以安装钢丝绳,本实用新型涉及的系留锁组件结构简单,甚至当系留气球在地面锚泊状态下也可以更换引导部中的钢丝绳。In the mooring lock assembly involved in the utility model, the side wall of the rope head sleeve is provided with a through cut for the wire rope head and the cable to enter and exit. , to replace the steel wire rope; when the steel wire rope is installed, the steel wire rope head is again passed through the through cut and enters the inside of the rope head casing to install the steel wire rope. It is also possible to replace the wire rope in the guide.
附图说明Description of drawings
图1是本实用新型系留锁组件的一个实施例的立体图,其中引导部位于套管支架外部的自由位置;Fig. 1 is a perspective view of an embodiment of the mooring lock assembly of the present invention, wherein the guide part is located at a free position outside the casing bracket;
图2是图1所示实施例的局部放大图;Fig. 2 is a partial enlarged view of the embodiment shown in Fig. 1;
图3是图1所示实施例的侧视图;Fig. 3 is a side view of the embodiment shown in Fig. 1;
图4是与图3类似的、图1所示实施例的另一方向的侧视图;Fig. 4 is a side view in another direction similar to Fig. 3 of the embodiment shown in Fig. 1;
图5是图1所示实施例的俯视图;Fig. 5 is a top view of the embodiment shown in Fig. 1;
图6是图1所示实施例的立体图,其中引导部位于套管支架内部的容纳位置;Fig. 6 is a perspective view of the embodiment shown in Fig. 1 , wherein the guide part is located at a receiving position inside the sleeve holder;
图7是图1所示实施例的局部放大分解图;Fig. 7 is a partial enlarged exploded view of the embodiment shown in Fig. 1;
图8是图1所示实施例的侧视局部截面图;以及Figure 8 is a side partial cross-sectional view of the embodiment shown in Figure 1; and
图9是图1所示实施例的局部剖视图。Fig. 9 is a partial sectional view of the embodiment shown in Fig. 1 .
具体实施方式detailed description
现参照附图对本实用新型进行描述,如图1至图9所示,本实用新型提供了一种用于系留气球的系留锁组件10。The utility model will now be described with reference to the accompanying drawings. As shown in FIGS. 1 to 9 , the utility model provides a tethered lock assembly 10 for tethering a balloon.
具体地,该系留锁组件10总的来说包括头锥伸出杆12、引导部部14、缆绳组件16、套管支架18以及锁扣组件20。其中,头锥伸出杆12与引导部14的一端彼此枢转连接,缆绳组件16与引导部14的另一端固定连接;套管支架18为两端开口的管状支架,缆绳组件16的自由端延伸穿过套管支架18并且引导部14能够在分别位于套管支架18的内部的容纳位置(参见图6)以及位于套管支架18的外部的自由位置(参见图1)之间移动。其中,头锥伸出杆12为从系留气球如系留艇的头锥的端部伸出的连接杆,用于将系留艇的头部固定。Specifically, the captive lock assembly 10 generally includes a nose cone extension rod 12 , a guide portion 14 , a cable assembly 16 , a bushing bracket 18 , and a catch assembly 20 . Wherein, one end of nose cone extension rod 12 and guide part 14 is pivotally connected to each other, and cable assembly 16 is fixedly connected with the other end of guide part 14; The guides 14 extend through the sleeve holder 18 and are displaceable between a receiving position (see FIG. 6 ) inside the sleeve holder 18 and a free position (see FIG. 1 ) outside the sleeve holder 18 . Wherein, the nose cone extending rod 12 is a connecting rod extending from the end of the nose cone of the mooring balloon such as the mooring boat, and is used to fix the head of the mooring boat.
进一步地,在容纳位置,设置在套管支架18上的锁扣组件20卡接引导部14,并且引导部14能够在套管支架18中旋转。Further, in the receiving position, the locking assembly 20 disposed on the sleeve bracket 18 engages with the guide part 14 , and the guide part 14 can rotate in the sleeve bracket 18 .
通过如上所述的结构,头锥伸出杆12与引导部14的一端枢转连接,因此头锥伸出杆12能够相对于引导部14旋转,可以实现系留气球的微动俯仰;并且,系留锁组件10中的缆绳组件16的自由端延伸穿过套管支架18,缆绳组件16的另一端可以与辅助绞车等设备相连,以实现对系留气球的地面锚泊与放飞。当系留气球回收时,引导部14顺着套管支架18的一端开口进入套管,处于在容纳位置,设置在套管支架18上的锁扣组件20卡接引导部14,实现系留气球头锥的固定;并且引导部14能够在套管支架18中旋转,此时克服锁扣组件20的微小摩擦力可实现系留气球的微动旋转。Through the above-mentioned structure, the nose cone extension rod 12 is pivotally connected to one end of the guide part 14, so the nose cone extension rod 12 can rotate relative to the guide part 14, and the micro-motion pitch of the tethered balloon can be realized; and, The free end of the cable assembly 16 in the mooring lock assembly 10 extends through the bushing support 18, and the other end of the cable assembly 16 can be connected with auxiliary winches and other equipment to realize ground anchoring and release of the tethered balloon. When the tethered balloon is recovered, the guide part 14 enters the sleeve along the opening of one end of the sleeve bracket 18, and is in the accommodation position. The locking assembly 20 arranged on the sleeve bracket 18 engages with the guide part 14 to realize the tethering of the balloon. The fixation of the nose cone; and the guide part 14 can be rotated in the sleeve bracket 18, at this time, the micro-motion rotation of the tethered balloon can be realized by overcoming the small friction force of the locking assembly 20.
继续参见附图,如图所示,在本实用新型的优选实施例中,锁扣组件20可以包括固定在套管支架18外壁的基座22和插销24。所述基座22为中空管状,其连接固定于套管支架18的外侧壁或与套管支架18的外侧壁一体成型,套管支架18连接于基座22的位置开设有通孔,以使基座22的内部通过所述通孔与套管支架18的内部相连通。具体地,在引导部14的外侧壁设置有凹槽26,并且在如上所述的容纳位置,插销24可以进入套管支架18的内部并卡接在凹槽26中,从而实现引导部14能够在套管支架18中旋转。Continuing to refer to the accompanying drawings, as shown in the figure, in a preferred embodiment of the present invention, the locking assembly 20 may include a base 22 and a latch 24 fixed on the outer wall of the sleeve bracket 18 . Described pedestal 22 is hollow tubular, and it is connected and fixed on the outer sidewall of sleeve pipe support 18 or integrally formed with the outer side wall of sleeve pipe support 18, and the position that sleeve pipe support 18 is connected to base 22 is provided with through hole, so that The interior of the base 22 communicates with the interior of the bushing support 18 through the through hole. Specifically, a groove 26 is provided on the outer sidewall of the guide part 14, and in the accommodating position as described above, the pin 24 can enter the inside of the casing bracket 18 and be snapped into the groove 26, so that the guide part 14 can Rotate in casing holder 18.
具体地,如图1至图6所示,插销24可以包括主体28以及凸缘30。其中,主体28为圆柱状结构并且主体28位于基座22中,凸缘30由主体28的一端的侧壁向外突出。当位于容纳位置中时,凸缘30卡接在基座22上,并且主体28的另一端进入套管支架18的内部并卡接在凹槽26内,从而将引导部14保持在套管支架18的内部。Specifically, as shown in FIGS. 1-6 , the latch 24 may include a body 28 and a flange 30 . Wherein, the main body 28 is a cylindrical structure and the main body 28 is located in the base 22 , and the flange 30 protrudes outward from a side wall of one end of the main body 28 . When in the received position, the flange 30 snaps onto the base 22 and the other end of the body 28 enters the interior of the casing holder 18 and snaps into the groove 26, thereby retaining the guide 14 in the casing holder 18 interior.
如图1和图2最佳地示出的,在本实用新型的实施例中,基座22具有与套管支架18的外壁连接的连接端32、以及与连接端32相对的自由端34。具体地,自由端34设置有第一滑槽36和第二滑槽38。其中,第一滑槽36以第一长度向连接端32延伸,而第二滑槽38以小于第一长度的第二长度向连接端32延伸,从而使得第一和第二滑槽36、38具有不同的延伸长度,这样使得插销24能够向套管支架18的内部延伸或从其中缩回。As best shown in FIGS. 1 and 2 , in an embodiment of the present invention, the base 22 has a connection end 32 connected to the outer wall of the bushing support 18 , and a free end 34 opposite the connection end 32 . Specifically, the free end 34 is provided with a first slide slot 36 and a second slide slot 38 . Wherein, the first chute 36 extends toward the connecting end 32 with a first length, and the second chute 38 extends toward the connecting end 32 with a second length shorter than the first length, so that the first and second chute 36, 38 There are different extension lengths such that the latch 24 can be extended toward the interior of the bushing support 18 or retracted therefrom.
具体地,插销24的主体28可在基座22中旋转以使插销24的凸缘30卡接在第一滑槽36中或第二滑槽38中。在实际使用过程中,当凸缘30卡接在第一滑槽36中时,由于第一滑槽36延伸长度较长,因此主体28的另一端能够进入套管支架18的内部;与此相对的,当凸缘30卡接在第二滑槽38中时,由于第二滑槽38延伸长度较短,因此主体28的另一端离开套管支架18的内部。Specifically, the main body 28 of the pin 24 can be rotated in the base 22 so that the flange 30 of the pin 24 is engaged in the first slot 36 or the second slot 38 . In actual use, when the flange 30 is snapped into the first chute 36, the other end of the main body 28 can enter the inside of the casing bracket 18 because the first chute 36 has a longer extension length; Yes, when the flange 30 is snapped into the second slide slot 38 , the other end of the main body 28 is away from the inside of the bushing support 18 because the extension length of the second slide slot 38 is relatively short.
此外,在一个优选的实施例中,插销24的主体28可以套设有弹簧。具体地,当凸缘30卡接在第一滑槽36或第二滑槽38中时,弹簧会拉动主体28以使凸缘30与第一滑槽36或第二滑槽38的槽底接触。通过这种方式,使得插销24利用弹簧的作用而向滑槽中的槽底偏置,这样能够使凸缘30稳固地保持在滑槽中,而不会发生脱离。In addition, in a preferred embodiment, the main body 28 of the latch 24 can be sleeved with a spring. Specifically, when the flange 30 is engaged in the first chute 36 or the second chute 38 , the spring will pull the main body 28 to make the flange 30 contact with the groove bottom of the first chute 36 or the second chute 38 . In this way, the bolt 24 is biased towards the bottom of the sliding groove by the action of the spring, so that the flange 30 can be firmly held in the sliding groove without being disengaged.
如图所示,优选地,凹槽26为围绕引导部14的轴线且环绕引导部14的外侧壁设置的环形槽。通过设置环形槽可以实现插销24容纳在凹槽26中时,同时还能够使得引导部14进行旋转。As shown in the figure, preferably, the groove 26 is an annular groove disposed around the axis of the guide portion 14 and around the outer sidewall of the guide portion 14 . By providing the annular groove, it can be realized that when the latch pin 24 is accommodated in the groove 26 , the guide part 14 can also be rotated at the same time.
优选地,上述的锁扣组件20的数量可以为至少两个。如图5所示,在该实施例中,可以设置三个锁扣组件20,并且锁扣组件20可以围绕套管支架18的外侧壁等间距设置。在其它实施例中,也可以设置2个、4个、甚至更多个锁扣组件20,因此其数量不对本实用新型构成任何限定。此外,当系留气球锚泊时,这种等间距设置的锁扣组件20可以尽可能保证稳固锁定引导部14,并使引导部14受力均匀。Preferably, the number of the above-mentioned locking components 20 may be at least two. As shown in FIG. 5 , in this embodiment, three locking assemblies 20 may be provided, and the locking assemblies 20 may be arranged at equal intervals around the outer side wall of the sleeve support 18 . In other embodiments, 2, 4, or even more locking assemblies 20 may also be provided, so the number thereof does not constitute any limitation to the present invention. In addition, when the tethered balloon is anchored, the locking components 20 arranged at equal intervals can ensure that the guide part 14 is locked as firmly as possible, and the force on the guide part 14 can be evenly applied.
如图所示,在本实用新型的一个实施例中,套管支架18具有倒锥形的第一端部40、和与支撑基座44固定连接的第二端部42。其中,缆绳组件16由第一端部40伸入套管支架18并由第二端部42伸出且与外置绞盘连接。As shown in the figure, in one embodiment of the present invention, the bushing support 18 has an inverted tapered first end portion 40 and a second end portion 42 fixedly connected to a support base 44 . Wherein, the cable assembly 16 extends from the first end 40 into the bushing support 18 and extends from the second end 42 to connect with the external winch.
此外,缆绳组件16可以具有基部和由基部延伸的钢丝缆绳46,基部可拆卸地设置在引导部14内部,并且钢丝缆绳46由引导部14伸出。有关缆绳组件16以及引导部14的具体结构将在以下参照图7至图9进行详细描述。In addition, the cable assembly 16 may have a base portion detachably disposed inside the guide portion 14 and a wire cable 46 extending from the base portion, and the wire cable 46 protrudes from the guide portion 14 . The specific structure of the cable assembly 16 and the guide part 14 will be described in detail below with reference to FIGS. 7 to 9 .
返回参照图1至图7,头锥伸出杆12和引导部14之间可以通过销轴48枢转连接。具体地,引导部14包括一圆柱状引导杆141及连接于引导杆141一端的两个连接突起142,引导杆141的另一端为球冠状或锥状,环状的凹槽26开设于引导杆141的外圆周。两个连接突起142上开设有同轴的第一连接孔143,头锥伸出杆12上开设有第二连接孔122,头锥连接杆12设置于两个连接突起142之间且第二连接孔122与第一连接孔143相连通,销轴48的其中一端设置有止挡凸缘,销轴48的杆段穿过引导部14的第一连接孔143和头锥伸出杆12的第二连接孔122以将二者枢转连接,并且销轴48的外露的与止挡凸缘相对的另一端设置有可插拔的保险销50,从而防止因意外触碰或意外操作导致头锥伸出杆12和12引导部14之间发生脱离。Referring back to FIGS. 1 to 7 , the nose cone extension rod 12 and the guide portion 14 can be pivotally connected by a pin 48 . Specifically, the guide portion 14 includes a cylindrical guide rod 141 and two connecting protrusions 142 connected to one end of the guide rod 141, the other end of the guide rod 141 is spherical or conical, and an annular groove 26 is opened on the guide rod. 141 outer circumference. The two connecting protrusions 142 are provided with a coaxial first connecting hole 143, the nose cone extension rod 12 is provided with a second connecting hole 122, the nose cone connecting rod 12 is arranged between the two connecting protrusions 142 and the second connection The hole 122 communicates with the first connection hole 143, and one end of the pin shaft 48 is provided with a stopper flange, and the rod section of the pin shaft 48 passes through the first connection hole 143 of the guide part 14 and the nose cone protrudes from the first connection hole 12 of the rod 12. Two connecting holes 122 are used to pivotally connect the two, and the exposed other end of the pin shaft 48 opposite to the stop flange is provided with a pluggable safety pin 50, thereby preventing accidental touches or accidental operations from causing nose cones. Disengagement occurs between the protruding rod 12 and the guide 14 of 12 .
现参照图7至图9,对本实用新型系留锁组件10中的引导部14的具体结构进行描述。Referring now to FIG. 7 to FIG. 9 , the specific structure of the guide portion 14 in the mooring lock assembly 10 of the present invention will be described.
如图所示并且结合以上所述,系留锁组件10包括彼此枢转连接的头锥伸出杆12和引导部14、以及与引导部14固定连接的缆绳组件16。具体地,缆绳组件16包括具有钢丝绳头52的缆绳46和能够容纳在引导部14中的绳头套管54,绳头套管54的侧壁设置有供钢丝绳头52和缆绳46进出的贯穿切口56,其中,钢丝绳头52容纳并保持在绳头套管54中且缆绳46由绳头套管54伸出并穿过引导部14。As shown and described in conjunction with the above, the captive lock assembly 10 includes a nose cone extension rod 12 and a guide 14 pivotally connected to each other, and a cable assembly 16 fixedly connected to the guide 14 . Specifically, the cable assembly 16 includes a cable 46 with a wire rope head 52 and a rope head sleeve 54 that can be accommodated in the guide portion 14, and the side wall of the wire rope sleeve 54 is provided with a through slit 56 for the wire rope head 52 and the cable 46 to enter and exit. Wherein, the wire rope end 52 is accommodated and held in the rope end sleeve 54 and the cable 46 protrudes from the rope end sleeve 54 and passes through the guide portion 14 .
通过以上结构,绳头套管54的侧壁设置有供钢丝绳头52和缆绳46进出的贯穿切口56,当需要更换钢丝绳46时,仅需将钢丝绳头52通过贯穿切口56从绳头套管54中取出,以更换钢丝绳;当安装钢丝绳46时,再次使钢丝绳头52穿过贯穿切口56进入绳头套管54内部,以安装钢丝绳,因此使得该系留锁组件10的结构更加简单,甚至当系留气球在地面锚泊状态下也可以更换引导部中的钢丝绳。Through the above structure, the side wall of the rope head casing 54 is provided with a through cutout 56 for the steel wire rope head 52 and the cable 46 to enter and exit. , to replace the wire rope; when the wire rope 46 is installed, the wire rope head 52 is again passed through the through slit 56 and enters the inside of the rope head casing 54 to install the wire rope, thus making the structure of the mooring lock assembly 10 simpler, even when the mooring balloon The steel wire rope in the guide can also be replaced in the state of mooring on the ground.
继续参照图7至图9,绳头套管54具有设置有上述贯穿切口56的环状侧壁58以及与环状侧壁58连接的底部止挡部60。其中,钢丝绳头52容纳在由环状侧壁58围成的容纳空间中,并且与底部止挡部60抵压接触。Continuing to refer to FIG. 7 to FIG. 9 , the rope end sleeve 54 has an annular sidewall 58 provided with the above-mentioned through cutout 56 and a bottom stopper 60 connected with the annular sidewall 58 . Wherein, the wire rope head 52 is accommodated in the accommodation space surrounded by the annular side wall 58 and is in pressing contact with the bottom stopper 60 .
在可选的实施例中,底部止挡部60可以为由环状侧壁58突出的至少一个止挡凸块;或者在其它实施例中,底部止挡部60可以为由环状侧壁58突出环状止挡凸缘。应当理解,上述实施方式可以根据本实用新型的具体使用情况而定;此外,其它可选的实施方式也可以应用在本实用新型中,本实用新型不局限于此。In an optional embodiment, the bottom stop 60 may be at least one stop protrusion protruding from the annular side wall 58; or in other embodiments, the bottom stop 60 may be a Protruding annular stop flange. It should be understood that the above-mentioned implementation manners may be determined according to the specific use conditions of the present utility model; in addition, other optional implementation manners may also be applied in the present utility model, and the present utility model is not limited thereto.
如图所示,在一个实施例中,贯穿切口56可以沿绳头套管54的轴线方向延伸,并且贯穿切口56的宽度至少等于缆绳46的直径。也就是说,在一个实施例中,贯穿切口56的宽度可以仅等于缆绳46的直径,而小于钢丝绳头52的直径,这样使得缆46能够更稳固地安装在绳头套管54中;而在其它实施例中,贯穿切口56的宽度更大也是可行的,在这种情况下钢丝绳头52在绳头套管54中的进出可以更加方便。当然应当理解,贯穿切口56的宽度是可以根据具体使用情况而定的,本实用新型不局限于此。As shown, in one embodiment, the through-cut 56 may extend along the axis of the rope end sleeve 54 , and the width of the through-cut 56 is at least equal to the diameter of the cable 46 . That is to say, in one embodiment, the width of through slit 56 can only be equal to the diameter of cable 46, and is less than the diameter of steel wire rope end 52, and like this makes cable 46 can be more firmly installed in the rope end casing 54; In the embodiment, it is also feasible that the width of the through-cut 56 is larger, and in this case, the entry and exit of the wire rope end 52 in the rope end casing 54 can be more convenient. Of course, it should be understood that the width of the through slit 56 can be determined according to specific usage conditions, and the present invention is not limited thereto.
继续参见图7至图9,该系留锁组件10还包括通过压盖螺钉62与引导部14可拆卸连接的绳头压盖64。其中,绳头压盖64与钢丝绳头52和绳头套管54抵压接触,从而将钢丝绳头52和绳头套管54稳固地固定。Continuing to refer to FIGS. 7 to 9 , the mooring lock assembly 10 further includes a rope head gland 64 detachably connected to the guide portion 14 through gland screws 62 . Wherein, the rope end gland 64 is in pressure contact with the wire rope end 52 and the rope end sleeve 54 , thereby firmly fixing the wire rope end 52 and the wire end sleeve 54 .
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621481234.3U CN206417172U (en) | 2016-12-30 | 2016-12-30 | Lock set is tethered at for captive balloon |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621481234.3U CN206417172U (en) | 2016-12-30 | 2016-12-30 | Lock set is tethered at for captive balloon |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206417172U true CN206417172U (en) | 2017-08-18 |
Family
ID=59573307
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621481234.3U Expired - Fee Related CN206417172U (en) | 2016-12-30 | 2016-12-30 | Lock set is tethered at for captive balloon |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206417172U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108263593A (en) * | 2016-12-30 | 2018-07-10 | 东莞前沿技术研究院 | Lock set is tethered at for captive balloon |
| CN110588946A (en) * | 2019-09-19 | 2019-12-20 | 中国电子科技集团公司第三十八研究所 | A tethered balloon head tethering device |
| CN111016817A (en) * | 2020-02-17 | 2020-04-17 | 上海神舟精宜汽车制造有限公司 | Sanitation car open-type side guardrail device |
| CN112429191A (en) * | 2020-11-20 | 2021-03-02 | 中国科学院空天信息创新研究院 | Nose tower end structure, nose tower subassembly and captive balloon of captive balloon anchor mooring facility |
-
2016
- 2016-12-30 CN CN201621481234.3U patent/CN206417172U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108263593A (en) * | 2016-12-30 | 2018-07-10 | 东莞前沿技术研究院 | Lock set is tethered at for captive balloon |
| CN110588946A (en) * | 2019-09-19 | 2019-12-20 | 中国电子科技集团公司第三十八研究所 | A tethered balloon head tethering device |
| CN111016817A (en) * | 2020-02-17 | 2020-04-17 | 上海神舟精宜汽车制造有限公司 | Sanitation car open-type side guardrail device |
| CN112429191A (en) * | 2020-11-20 | 2021-03-02 | 中国科学院空天信息创新研究院 | Nose tower end structure, nose tower subassembly and captive balloon of captive balloon anchor mooring facility |
| CN112429191B (en) * | 2020-11-20 | 2022-06-17 | 中国科学院空天信息创新研究院 | Nose tower end structure, nose tower subassembly and captive balloon of captive balloon anchor mooring facility |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206417172U (en) | Lock set is tethered at for captive balloon | |
| AU2015222919B2 (en) | Apparatus and method of attachment of a payload | |
| EP2493800B1 (en) | Hose reel mounting tube constraint | |
| JP6959982B2 (en) | Quick release connection flange | |
| CN108263593B (en) | Tethered Lock Assembly for Tethered Balloons | |
| US3163228A (en) | Cable latching device | |
| US3362377A (en) | Span marker and method and apparatus for installing same | |
| CN117101037A (en) | Aloft work anti-falling device and use method thereof | |
| US10512799B2 (en) | Restraint system dual disconnect | |
| CN114506424B (en) | Floating position indicating device and underwater equipment on separation | |
| CN115744504A (en) | Quick connector fixing and unlocking mechanism and connector fixing seat thereof | |
| US20230349444A1 (en) | Mounting device for an elongate member | |
| CN114379783A (en) | Automatic load releasing device | |
| US2955855A (en) | Shackles | |
| KR101908440B1 (en) | Hook device for rescue boat | |
| CN217215825U (en) | Combined protection assembly of cable for strong current construction | |
| US3136021A (en) | Tape connectors | |
| CN214998803U (en) | A rotatable connection device and tethered balloon cable assembly for a tethered balloon | |
| CN116119465A (en) | A UUV load fixed depth release limit device | |
| CN111186530B (en) | Quick and labor-saving opening and closing handle mechanism for pressure-resistant hatch cover | |
| CN212565164U (en) | Adjustable mounting bracket for alarm | |
| CN222202831U (en) | Drum device | |
| CN110901920B (en) | Operating steel cable connecting device capable of being quickly separated | |
| US3431794A (en) | Cable control | |
| CN112145160A (en) | Salvageable source side-mounted neutron instrument |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230808 Address after: Room 501, Building D2, Songshan Lake International Innovation and Entrepreneurship Community, Songshan Lake High tech Industrial Development Zone, Dongguan City, Guangdong Province, 523000 Patentee after: Dongguan Dongguan Institute of Science and Technology Innovation Address before: Room 502, Floor 5, Building 1, Innovation Science Park, Songshan Lake High tech Industrial Development Zone, Dongguan, Guangdong 523000 Patentee before: DONGGUAN FRONTIER TECHNOLOGY INSTITUTE |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170818 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |