CN207553357U - Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall - Google Patents
Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall Download PDFInfo
- Publication number
- CN207553357U CN207553357U CN201721708312.3U CN201721708312U CN207553357U CN 207553357 U CN207553357 U CN 207553357U CN 201721708312 U CN201721708312 U CN 201721708312U CN 207553357 U CN207553357 U CN 207553357U
- Authority
- CN
- China
- Prior art keywords
- wall
- exterior wall
- styrofoam
- rubble
- porous brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of rubble plates, styrofoam and porous brick compound thermal-insulating decorative exterior wall, belong to building structure, reinforced concrete building structure is unsuitable for building energy conservation, the compound thermal-insulating decorative exterior wall of the utility model, including inner wall, exterior wall and positioned at inner wall, heat insulation layer between exterior wall, inner wall is porous brick masonry, heat insulation layer is styrofoam, exterior wall is rubble plate, form combination masonry construction, there can be good appearance simultaneously after the completion of masonry, it gets integrated into environment, save material and heat preservation energy-saving, it is waterproof and dampproof, the advantages of being effectively improved living environment.
Description
Technical field
The utility model belongs to building structure, and in particular to a kind of rubble plate, styrofoam and porous brick compound thermal-insulating decorative
Exterior wall.
Background technology
Energy-saving building technology has become one of emphasis of world today's Building technology development, under construction using load-bearing, guarantor
Temperature, decoration multiple combinations material achieve the effect that energy saving, reduction energy consumption, raising efficiency of energy utilization.Rural area is spent a holiday wine
Shop, Peasants Joy, local-style dwelling houses and part villa engineering are more and more using the form built by the mountain, and external wall facing requires and week
Side ecosystem blends.Common reinforced concrete building structure is unsuitable for building energy conservation.
Utility model content
The technical problems to be solved in the utility model and the technical assignment proposed are to overcome reinforced concrete building structure not
The defects of suitable for building energy conservation, provides a kind of rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall.
In order to achieve the above objectives, the rubble plate of the utility model, styrofoam and porous brick compound thermal-insulating decorative exterior wall, including
Inner wall, exterior wall and the heat insulation layer between inner wall, exterior wall, it is characterized in that:The inner wall is porous
Brick setting, the heat insulation layer are made of styrofoam, and the exterior wall is rubble plate masonry.
As optimization technique means:The lateral surface of the inner wall is coated with waterproof mortar course, the styrofoam with it is described
Waterproof mortar course paste.
As optimization technique means:The styrofoam is pasted with bonding and the waterproof mortar course.
As optimization technique means:It is combined together between the exterior wall and heat insulation layer by grout blanket.
As optimization technique means:The inner wall, heat insulation layer are laid with steel tie in exterior wall.
As optimization technique means:The steel tie is welded by inner segment, outer section, the inner segment with outer section
Welding position is located at the heat insulation layer.
As optimization technique means:The steel tie is in the inner wall, is in bending in grout blanket.
As optimization technique means:The inner wall, heat insulation layer are poured at the top of exterior wall and are beared down on one.
As optimization technique means:The inner wall, heat insulation layer bottom pour flashing.
As optimization technique means:The medial surface of the inner wall has a coat of plaster, real between the rubble plate of the exterior wall
Apply seat slurry, jointing.
The compound thermal-insulating decorative exterior wall of the utility model, inner wall are porous brick masonry, and heat insulation layer is styrofoam, outside
Wall is rubble plate, forms combination masonry construction, can have good appearance simultaneously after the completion of masonry, get integrated into environment, save material
Material and heat preservation energy-saving, it is waterproof and dampproof, be effectively improved the advantages of living environment.
Description of the drawings
Fig. 1 is the vertical sectional schematic diagram of the utility model rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall;
Fig. 2 is sets showing for steel tie within the walls outside the utility model rubble plate, styrofoam and porous brick compound thermal-insulating decorative
It is intended to;
Figure label explanation:
01- inner walls;
02- waterproof mortar courses;
03- heat insulation layers;
04- grout blankets;
05- exterior walls, 51- sit slurry, 52- jointings;
06- steel ties, 61- inner segments, the outer sections of 62-, 63- welding positions;
07- bears down on one;
08- flashing;
09- coats of plaster.
Specific embodiment
The utility model is described further below in conjunction with Figure of description.
As shown in Figure 1, the rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, including inner wall 01, exterior wall
05 and the heat insulation layer 03 between inner wall, exterior wall, inner wall 01 is porous brick masonry, and porous brick can be mixed with gas
Solidifying earth building blocks replace, and heat insulation layer 03 is made of styrofoam, and exterior wall 05 is rubble plate masonry.
Specifically, the lateral surface of inner wall 01 is coated with waterproof mortar course 02, styrofoam is pasted with waterproof mortar course 02.
Styrofoam is pasted with bonding and waterproof mortar course 02.
It is combined together between exterior wall 05 and heat insulation layer 03 by grout blanket 04.
Referring to Fig. 2, inner wall 01, heat insulation layer 03 are laid with steel tie 06 in exterior wall 05.
Referring to Fig. 2, steel tie 06 is welded by inner segment 61, outer section 62, inner segment 61 and outer section 62 of welding position 63
Positioned at heat insulation layer 03.
Steel tie 06 is in inner wall 01, is in the extension side of bending, the bending position and wall in grout blanket 04
To consistent, so as to ensure drawknot intensity.
Inner wall 01, heat insulation layer 03, exterior wall 05 top pour and bear down on one 07, bear down on one preferred armored concrete knot
Structure.
Inner wall 01, heat insulation layer 03 bottom pour flashing 08, when specific implementation, can fill in entire complex heat-preservation
The bottom of decorations exterior wall pours flashing.
The medial surface of inner wall 01 has coat of plaster 09, implements to sit slurry 51, jointing 52 between the rubble plate of exterior wall 05.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, during construction, inner wall 01, waterproof mortar course 02,
Heat insulation layer 03, grout blanket 04, exterior wall 05 according to from inside to outside, get on, get off, the principle organizing construction of construction in layer.It is interior
Portion's brick wall, intermediate insulating layer and external rubble board wall successively segmentation are up built by laying bricks or stones, and height of lift 1500mm or so, every layer is divided to two sections
Construction, every section is constructed from inside to outside.
The working procedure of inner wall porous brick masonry is:Operation preparation → brick watering → masonry walls (mortar stirring) → is tested
It comments.Specific requirement is as follows:
1. preparation of construction
1)Material
(1)Brick:Kind, strength grade have to comply with design requirement, and have product certificate, test sheet.The brick of dry wall
Uniform color is answered, corner is neat.
(2)Cement:Kind and label should be selected according to masonry position and local environment condition, generally preferably use No. 325 it is general
Logical portland cement or portland slag cement.
(3)Sand:With middle sand, the clay content that sand used in below M5 mortars is configured is no more than the sand of 10%, M5 and its more than mortar
Clay content is no more than 5%, uses the preceding sieve with 5mm apertures.
(4)Admixture:The lime curing time is not less than 7d or using flyash etc..
(5)Other materials:Wall steel tie and built-in fitting, woodbox should brush preservatives etc..
2)Main equipment:Big shovel, plane adze, cleaver, fan, cable inlet bracket, line pendant, small white line, tape measure, iron level should be had
Ruler, marked rod, breaker, ash-pit, brick clamp, broom etc..
2. build operating procedure by laying bricks or stones
1)Brick waters:Clay brick must build the previous day watering moistening by laying bricks or stones, and generally immersing four side 1.5cm of brick with water is advisable,
Moisture content is 10%-15%, and room temperature is constructed wall on not handy hacking;Rainy season must not reach the brick of saturation state using moisture content
Wall;Teletostage watering is had any problem, it is necessary to suitably increase consistency of mortar.
2)Mortar stirs:Mortar mix ratio should use weight ratio, and measuring accuracy cement is 2%, and sand, emplaster control are ± 5%
Within.Mechanical agitation is preferably used, mixing time is no less than 1.5min.
3)Masonry walls:
(1)Masoning method:Masonry is generally using one along a fourth (full fourth, full item), plum blossom fourth or Flemish garden wall bond.
(2)Hanging wire:Build the necessary two-sided hanging wire of brick-and-a-half wall by laying bricks or stones, if long wall is several per capita using a logical line, centre should
If several branch line points, small line will tense, every layer of brick will thread level watching, make horizontal joint uniformity, straight smoothness;Build brick thickness
Furred wall is appropriate to the occasion to use right-hand side hanging wire, and it is smooth to look after brick wall two sides, depth of plastering is controlled to lay the foundation for next procedure.
(3)It lays bricks:It lays bricks and preferably uses a shovel ash, one piece of brick, one " 31 " chimney bond rubbed, is i.e. Man Pu, full squeeze operate
Method.Brick will be laid flat when laying bricks.Expert is high, and metope will be opened;Expert is low, and metope will be carried on the back.Lay bricks and have to line, " on line,
Under with rib, left and right is adjacent will be to flat ".Thickness of mortarat bed joint and vertical mortar joint width are generally l0mm, but no less than 8mm,
It should not exceed 12mm.
(4)Stay raft:Exterior wall corner should be built by laying bricks or stones simultaneously.Inner-outer wall junction must stay oblique raft, and raft length is no less than
The 2/3 of wall height, raft must be straight, clear and coherent.Being segmented position should be in deformation joint or at door and window bicker, partition wall and wall or column
When asynchronously building by laying bricks or stones, Yang Cha can be stayed to add pre-buried steel tie.Along wall height people is buried per 50cm embedded bars 2 by design requirement
Length stays Cha Chu to count from wall, and general to be not less than 50cm per side, end should add 90 crotches.Constructing hole also should be by above-mentioned
It is required that stay horizontal steel tie.Application vertical brick in partition wall top tiltedly builds jam-packed.
(5)Steel tie is pre-buried with woodbox:Steel tie is slightly smaller than thickness of wall body pre-production according to length, is built in exterior wall
It is quincunx reserved according to 800mm × 800mm spacing when building.Woodbox should through preservative treatment, when pre-buried microcephaly outside, including major part,
Quantity is determined by hole height;Height person within 1.2m in hole puts 2 pieces per side, highly puts 4 pieces per side in 2~3m person.It is pre-buried
The position of woodbox starts generally above and below hole at four skin bricks, and centre is uniformly distributed.Door-window opening considers to install door and window after reserving
Frame, it should be noted that door-window opening width and absolute altitude meet design requirement.
For steel tie is avoided to build the influence of process construction by laying bricks or stones to follow-up rubble plate, using segmented welding steel tie, i.e.,
Steel tie is divided into two sections, and the inner segment 61 of pre-buried " L " shape, treats that cement mortar is painted and complete, waterproof applies during the porous brick masonry of interior wall
Material brush finish, after the completion of styrofoam installation, build by laying bricks or stones outside rubble board wall body when weld serpentine outer section 62, make inner segment,
Outer section is integrally formed.It is specific as shown in Figure 2.
(6)Lintel, beam pad are installed;When installing lintel, beam pad, absolute altitude, position and model must be correct, and it is full to sit ash.
When such as sitting grey thickness more than 2cm, with pea gravel concrete place mat, when lintel is installed, the length of two supports point should be consistent.
(7)Constructional column way:All engineerings equipped with constructional column, before laying bricks, first according to design drawing by constructional column position
Snap the line is carried out, and the processing of constructional column joint bar is straight.
(8)When the oblique block of frame structural beam tiltedly fills in brick, it is necessary to which wall below can build oblique plug after completing at least seven days
Brick, and wall mortar must be full.
After the completion of every section of building wall, checked by special quality prosecutor according to code requirement, meet the requirements and give
Next procedure construction can be carried out after examination.Fail to meet code requirement rectify and improve, until can test after reaching requirement
It receives.
The construction of waterproof mortar course is as follows:
1. base treatment:Before brushing construction of waterproof layer, first the sundries of substrate surface, mortar lump etc. are cleaned up, and
Wiped with clean wet cloth it is primary, on inspection base split without uneven, sky, dusting the defects of, next procedure can be carried out.
2. brushing primer
1)Primer (base treatment agent) is prepared:First by poly- saddle ester material, second material and dimethylbenzene with 1:1.5:2 ratio (matter
Amount ratio) cooperation stir evenly, the material prepared is finished in 2h.
2)Primer brushing:By prepared primer, prepared bottom sizing is uniformly brushed round brush in base's table with long
Face, brushing amount are 0.3kg/m2 or so, when about 4h feels are not viscous after brushing, you can do next procedure.
3. film waterproof material is constructed:
1)Material is prepared:Poly- saddle ester is by material, second material and dimethylbenzene with 1:1.5:0.3 ratio (weight ratio) cooperation, is used
Electric mixer 3~5min of action of forced stirring, until abundant mix uniformly can be used.The mixture prepared, which is answered in 2h, to be finished, can not
Overlong time.
2)Additional film layer:Across wall, top, ground pipe root, floor drain, discharge outlet, the weak points such as negative and positive angle, deformation joint
Position before film layer large-area construction, should first carry out the enhancing coating (extra play) at above-mentioned position.
3)Brush first of film:Preceding one of film reinforcing layer material solidification and after drying, should first check extra play
Position whether there is remaining stomata or bubble, if it has not, the first coating film can be brushed;If any stomata or bubble, then using rubber
Mixture is firmly pressed into stomata by scraper plate, and film is brushed in part again;Then first layer coating construction is carried out.The first strata saddle ester is scraped in painting
Coating film waterproof material.It can uniformly be applied and scraped with plastics or squeegee, make every effort to consistency of thickness, in 1.5mm or so, i.e. dosage is
1.5kg/m²。
4)Second film is scraped in painting:After first of curing of coating, you can apply scrape second film evenly thereon, painting is scraped
Direction scrapes that direction is perpendicular with first of painting, and painting scrapes second with first of time separately typically no less than for 24 hours, also not
More than 72h.
5)Third road film is scraped in painting:It is identical with second film that method is scraped in painting, but apply scrape direction should be perpendicular.
4. coating protective layer:After the drying of last one of curing of coating, you can according to the suitable form of Architectural Design Requirements, one
As smear cement mortar.Plane can pour pea gravel concreten protective layer.
Polyphenyl plate heat preserving thermal insulation layer construction technology process is:Base cleaning, snap the line → styrofoam processing matching board, drilling → viscous
Patch installation.
Base cleaning, snap the line:Remove base, snap the line:Remove substrate surface sundries rubbish, then on the basis of window hole to
Both sides are according to the wide pop-up control line of plate.
Styrofoam matching board, drilling:According to construction full-page proof blanking matching board, except consider window opening influence in addition to, it is also contemplated that floor height,
The influence of frame beam.To ensure the accurate of matching board, CAD setting-out blankings can be used.After the completion of matching board, according to the position of steel tie
Drilling.
Paste installation:It is pasted using a patch mode.Adhesive material is provided according to the operation instructions of special-purpose adhesive
Disastrously with proportional arrangement, special messenger is responsible for, strict measurement, mechanical agitation, it is ensured that stir evenly.The adhesive mixed stops quiet
It can be used in stirring after 5min, adhesive must be with mixing with the adhesive mixed should ensure that and is finished in 1h.It is all to gather
Benzene plate side exposed section(At expansion joint, door-window opening), should all carry out grid cloth and turn over packet processing.During stickup it is noted that:
It must mutually raft overlap joint stickup at negative and positive angle.
Door-window opening quadrangle not may occur in which vertical masonry joint, it is necessary to cut out hilt shape with monoblock styrofoam, and small hem width degree >=
200mm。
Method of attaching is using point bonding, it is necessary to assure bond area is not less than 30%.
Styrofoam must be pasted on metope rapidly after having smeared special-purpose adhesive, avoided adhesive skinning and lost bonding
Property.
When being bonded styrofoam should softly, uniformly squeeze styrofoam, and with 2m guiding rulers and power board check plate face flatness with
Verticality.Pay attention to removing the adhesive that edges of boards overflow during stickup, make not staying seam between plate and plate.
Rubble plate building block exterior wall body construction is as follows:
1. before rubble wall is built by laying bricks or stones, should first clean base surface, wall center line and sideline are popped up on base surface later;In wall
Marked rod is erect at body both ends, and directrix is drawn between marked rod, and to control per fur stone into out position, hanging wire divides skin to crouch blocks, often skin
Height about 300~400mm.
Paving slurry processes can be used in building method.With larger flat rubble, first build at corner, junction and hole, then in
Between build by laying bricks or stones.Should first try to put before block, make building stones size matching, big face is kept flat downward, and exposed surface is concordant, angle inwardly, each skin
It should utilize nature shape that can substantially coincide with first building rubble through beaing finishing between rubble, take block closely, block-by-block, which crouches to build, sits slurry,
Make mortar full.
Upper and lower fur stone answers the mutual fissure of displacement, inside and outside to take block, no less than 1 block of drawknot stone on every 0.7m2 metopes(Level interval is not
More than 2m), between stone larger gap should first dry patching mortar, use the embedding reality of rubble afterwards.Forbid first to clog doing for finger stone post-grouting
Method.There must not be shovel mouth stone among wall(Sharp stone is tilted towards outer stone), axes stone and gap bridge stone(The stone of block is only taken at both ends
Block).Mortar joint width general control is 40~50mm in about 20~30mm, paving ash thickness.
2. build by laying bricks or stones, straight joint, dry joint, hollow joint and hole are avoided the occurrence of, while should be noted that reasonable placement stone, in order to avoid wall
Phenomena such as dislocation, splitting, external drum occur after load-bearing.
3. if the shapes and sizes of rubble differ when building by laying bricks or stones, it is difficult to it builds and puts down per skin, also can be used and build method regardless of skin, every
Certain altitude is substantially built flat.
4. being built in corner and both ends junction using larger and more regular pile stone phase lap, and build by laying bricks or stones simultaneously, when necessary
Steel tie is set.It cannot such as build by laying bricks or stones simultaneously, the oblique raft of stairstepping should be stayed, the straight raft of zigzag must not be stayed.
5. rubble wall builds height by laying bricks or stones and is not to be exceeded 1.2m daily, under normal temperature, resting can continue to assemble after 4h.Often build 3
~4 layers should be substantially levelling primary, when midway is stopped work, upper block face must when continuing to build by laying bricks or stones mortar laying again.It builds to story height
When, it should be beared down on one using smooth ratchel and comprehensively levelling with cement mortar.
6. door and window hole can build jack arch or place reinforced concrete lintel in wall, and it is high that 10mm sinkings should be reserved between window frame
Degree.
7. in the faced wall of rubble and solid brick, rubble wall should be built by laying bricks or stones simultaneously with brick setting, and every 4~6 skin bricks
It is bonded with 2~3 skin headers and rubble wall drawknot.Gap between two kinds of masonries is filled up using mortar.
8. corner and junction that rubble wall and brick wall connect should be built by laying bricks or stones simultaneously.
It corner should be from vertical wall(Or cross wall)It is drawn every 4~6 skin brick height not less than 120mm and cross wall(Or vertical wall)Phase
It connects.Junction should be drawn from vertical wall every 4~6 skin brick height to connect not less than 120mm with cross wall
9. the jointing in stone walling face:The jointing form of stone walling face or cylinder has flush joint, plano-concave seam, plano-convex seam, keyed joint, half
Boss seam and triangle joint etc., general rubble metope is mostly stitched using flush joint or plano-convex.
Seam mortar preferably uses 1:1.5 cement mortar.The jointing of rubble metope is carried out by following procedure:
(1)Remove the objects such as cable rope, the hook installed temporarily on metope or cylinder;
(2)Remove mortar, mud, sundries and spot bonded on metope or cylinder etc.;
(3)Seam is picked, i.e., mortar joint is scraped into deep 10~20mm, irregular place is modified;
(4)Metope or cylinder are sprayed with water, makes its moistening, then carries out jointing.
Jointing lines act in accordance with crack of stone progress, and uniformity, and the depth and thickness are identical, are compacted troweling, and overlap joint is smooth.External corner
Jointing wants two sides side whole.Inner corner trim jointing cannot be led directly to up and down.Jointing must not have the phenomenon that losing seam, cracking or bonding loosely.
Jointing, which finishes, should clean metope or cylinder, and should sprinkle water maintenance in early days.
It checks and accepts:After the completion of construction, checked and accepted and recorded by full-time Quality Controller after teams and groups' self-test, it is main to check rubble board wall
The flatness in body surface face, verticality, plumpness of the uniformity of mortar joint and mortar etc., should refer to related construction regulations and perform, school
The deviation just found.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, are broadly divided into three parts:Exterior wall is rubble
Plate, it is thick up to 120mm, mainly play peripheral protective, decoration function;Centre is styrofoam, thick up to 100mm, mainly plays insulation
Effect;Inner wall is porous brick masonry, thick up to 240mm, plays main structure load-bearing effect;Cement bonded sand is smeared on the outside of Perforated-brick Wall
Slurry, brushing water-repellent paint play moisture-proof, trapping.To ensure the globality of wall, steel tie in wall is set, is made interior
The firm connection of outside wall.
By the compound action of more than material, combined wall has good waterproof and dampproof, thermal insulation separation thermal property, can be with
Meet the materials for wall requirement of the building more demanding to energy conservation and environmental protection.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall after the completion, only need outside rubble plate jointing, interior
Side wall paints, and is fitted up without separately External Wall.Construction is quick, and decoration of exterior wall keeps the temperature, builds by laying bricks or stones and build by laying bricks or stones primary completion,
Decoration cost and construction period can be reduced.
Due to the rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, use inside for regular inner wall, outside
The structure that side is irregular rubble plate, centre is styrofoam.Using the structure of novel " L "+serpentine wall steel tie, solution
The problem of inner wall of having determined is matched with exterior wall steel tie difficulty, ensure that the globality of wall.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall smear cement mortar in interior wall outer side, brush anti-
Water paint solves the common quality defect of exterior wall easy to leak, while solves tension rib position waterproof problem.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, rubble material of gathering materials on the spot are cut into rubble plate, fill
Divide using block is rationally organized the characteristics of different materials for walls, improve performances, the energy-saving effects such as the waterproof of wall, heat-insulated and heat preservation and show
It writes.
The rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, suitable for incorporating ecosystem requirement height, building
More disperse, the higher multi-story structure of power conservation requirement, such as rural Resort Hotel, Peasants Joy, local-style dwelling houses and part villa engineering
Common buildings can appropriately adjust combined wall(It such as reduces the thickness of peripheral protective rubble plate and inwall, cancel insulating layer
Deng), can not only meet the building and requirement of building, also there is preferable thermal property simultaneously, reach good section
It can heat insulation effect.
Claims (10)
1. rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall, including inner wall(01), exterior wall(05)And positioned at interior
Heat insulation layer between wall, exterior wall(03), it is characterized in that:The inner wall(01)It is described for porous brick masonry
Heat insulation layer(03)It is made of styrofoam, the exterior wall(05)For rubble plate masonry.
2. rubble plate according to claim 1, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Inner wall(01)Lateral surface be coated with waterproof mortar course(02), the styrofoam and the waterproof mortar course(02)It pastes.
3. rubble plate according to claim 2, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Styrofoam pasted with bonding and the waterproof mortar course.
4. rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall according to claims 1 or 2 or 3, feature
It is:The exterior wall(05)With heat insulation layer(03)Between pass through grout blanket(04)It is combined together.
5. rubble plate according to claim 4, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Inner wall(01), heat insulation layer(03), exterior wall(05)Inside it is laid with steel tie(06).
6. rubble plate according to claim 5, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Steel tie(06)By inner segment(61), outer section(62)It is welded, the inner segment and outer section of welding position(63)It is located at
The heat insulation layer(03).
7. rubble plate according to claim 5, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Steel tie(06)In the inner wall(01)Interior, grout blanket(04)Interior is in bending.
8. rubble plate according to claim 1, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Inner wall(01), heat insulation layer(03), exterior wall(05)Top pour and bear down on one(07).
9. rubble plate according to claim 1, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Inner wall(01), heat insulation layer(03)Bottom pour flashing(08).
10. rubble plate according to claim 1, styrofoam and porous brick compound thermal-insulating decorative exterior wall, it is characterized in that:It is described
Inner wall(01)Medial surface have coat of plaster(09), the exterior wall(05)Rubble plate between implement sit slurry(51), jointing
(52).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721708312.3U CN207553357U (en) | 2017-12-11 | 2017-12-11 | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721708312.3U CN207553357U (en) | 2017-12-11 | 2017-12-11 | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207553357U true CN207553357U (en) | 2018-06-29 |
Family
ID=62666569
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721708312.3U Active CN207553357U (en) | 2017-12-11 | 2017-12-11 | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207553357U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109098307A (en) * | 2018-07-13 | 2018-12-28 | 中国冶集团有限公司 | Brick output enters the wall body structure and wall building method of stone |
| CN114457934A (en) * | 2022-02-23 | 2022-05-10 | 中国二十二冶集团有限公司 | Construction method of composite wall body of building |
-
2017
- 2017-12-11 CN CN201721708312.3U patent/CN207553357U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109098307A (en) * | 2018-07-13 | 2018-12-28 | 中国冶集团有限公司 | Brick output enters the wall body structure and wall building method of stone |
| CN114457934A (en) * | 2022-02-23 | 2022-05-10 | 中国二十二冶集团有限公司 | Construction method of composite wall body of building |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104018598B (en) | A kind of exterior wall structure and construction installation method | |
| CN103046709B (en) | Building construction method of inner wall surface | |
| CN101886460B (en) | Press polishing method of plastered mesh cloth of inner wall | |
| CN107254954A (en) | Ground paving ceramic tile construction technology | |
| CN103643754B (en) | The waterproof treatment structure of building wall body interface seam crossing and processing method | |
| CN101565997A (en) | Construction method for large-area irregular floor tile | |
| CN101016759A (en) | Fiver cement board grouting wall and construction method therefor | |
| CN106049539A (en) | Building project construction method | |
| CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
| CN112267628A (en) | Construction method of plastering-free system for interior wall decoration of constructional engineering | |
| CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
| CN104088416A (en) | Gypsum heat preservation painting mortar construction process | |
| CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
| CN108130992A (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method | |
| CN111608280A (en) | External wall heat insulation construction method | |
| CN113530124B (en) | Construction method for preventing water-blocking wet plaster inside and outside volcanic rocks on wall surface | |
| CA2449946A1 (en) | Hydraulic fixing agent and method for reducing the cohesion of a layer of bonded fixing agent | |
| CN108468413A (en) | A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering | |
| CN106368338A (en) | Construction method of external thermal insulation system of foam cement thermal insulation board outer wall | |
| CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
| CN207553357U (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall | |
| CN109898698A (en) | A kind of construction method of pseudo-classic architecture silk seam wall | |
| CN207194353U (en) | A kind of prefabricated thermal insulation water-proof decorative external wall panel structure | |
| CN207194343U (en) | The tapestry brick paving structure of autoclave aerated concrete building block exterior wall | |
| CN207194239U (en) | Lightgage steel joist concrete anticracking fills wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |