CN208455894U - A kind of dry-hang stone curtain wall with ornamental strip - Google Patents
A kind of dry-hang stone curtain wall with ornamental strip Download PDFInfo
- Publication number
- CN208455894U CN208455894U CN201820476047.9U CN201820476047U CN208455894U CN 208455894 U CN208455894 U CN 208455894U CN 201820476047 U CN201820476047 U CN 201820476047U CN 208455894 U CN208455894 U CN 208455894U
- Authority
- CN
- China
- Prior art keywords
- ornamental strip
- keel
- curtain wall
- dry
- strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004575 stone Substances 0.000 title claims abstract description 78
- 238000009434 installation Methods 0.000 claims abstract description 16
- 230000006835 compression Effects 0.000 claims abstract description 4
- 238000007906 compression Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 229910001220 stainless steel Inorganic materials 0.000 claims description 13
- 239000010935 stainless steel Substances 0.000 claims description 13
- 238000010079 rubber tapping Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 238000011900 installation process Methods 0.000 abstract description 3
- 230000005489 elastic deformation Effects 0.000 abstract description 2
- 238000003825 pressing Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 3
- 210000000988 bone and bone Anatomy 0.000 description 2
- 238000005253 cladding Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
It include base's keel, stone panel, ornamental strip, elastic hanger the utility model discloses a kind of dry-hang stone curtain wall with ornamental strip.Stone panel includes muti-piece, is bolted together fixed on base's keel;Gap is provided between the adjacent stone panel in left and right;Ornamental strip is plate strip, is located at the inside of stone panel, coverage gap;Elastic hanger is located at the inside of ornamental strip, including first end, second end;First end is fixedly connected with ornamental strip;Second end is fixedly connected with base's keel;Elastic hanger is in compression deformed state.The utility model by outer elastic force of elastic hanger by finishing strip pressing in the inside of stone panel, make seamless between the outer surface of ornamental strip and the inner surface of stone panel, improve the impression quality of curtain wall.The installation error generated in stone panel and ornamental strip installation process is eliminated by the elastic deformation of elastic hanger itself, and is no longer realized by adjustment repeatedly, the installation effectiveness of curtain wall is improved.
Description
Technical field
The utility model belongs to building decoration technology field, specifically, being to be related to a kind of dry-hang stone with ornamental strip
Curtain wall.
Background technique
The mounting means of the stainless steel ornamental strip of existing dry-hang stone curtain wall is usually to pass through stainless steel ornamental strip certainly
Self-drilling screw is attacked directly to be fixedly installed on lateral keel or vertical keel.Due to the processing of stone panel, stainless steel ornamental strip
There are errors with installation, and after causing stone panel to install, the gap between stone panel and stainless steel ornamental strip is inconsistent, even
There is black seam phenomenon, the perception after installing stone panel with stainless steel ornamental strip is bad.
In addition, in the installation process of stainless steel ornamental strip, to reduce the seam between stone panel and stainless steel ornamental strip
Gap, needs to adjust control construction and installation position repeatedly and precision, installation effectiveness are lower.
Summary of the invention
The utility model provides a kind of dry-hang stone curtain wall with ornamental strip, eliminates the seam between stone panel and ornamental strip
The inconsistent and black seam phenomenon of gap, improves the impression quality of dry-hang stone curtain wall;Meanwhile improving installation effectiveness.
In order to solve the above technical problems, a kind of dry-hang stone curtain wall with ornamental strip of the utility model uses following technology
Scheme is achieved:
A kind of dry-hang stone curtain wall with ornamental strip includes base's keel, stone panel, ornamental strip, elastic hanger.It is described
Stone panel includes muti-piece, is bolted together fixed on base's keel;Between the adjacent stone panel in left and right
It is provided with gap;The ornamental strip is plate strip, is located at the inside of the stone panel, covers the gap;It is described
Elastic hanger is located at the inside of the ornamental strip, including first end, second end;The first end and the fixed company of the ornamental strip
It connects;The second end is fixedly connected with base's keel;The elastic hanger is in compression deformed state.
As a kind of specific structure design of the elastic hanger, the elastic hanger is stainless steel steel disc comprising
Fixed part and elastic portion;The elastic portion is arcuate structure;The fixed part is flat construction;One end of the elastic portion and institute
State the tangent connection in one end of fixed part;The first end is located in the elastic portion;The second end is located on the fixed part.
As a kind of specific structure design of the dry-hang stone curtain wall, the ornamental strip is stainless steel ornamental strip;Institute
It states and is fixedly connected by welding together on the inside of first end and the ornamental strip;The dry-hang stone curtain wall further includes self tapping spiral shell
Nail;It is provided with first through hole on the fixed part, is adapted to tapping screw installation;The tapping screw passes through described
First through hole is fixedly connected with base's keel.
It is easier to keep the front and back progress of elastic hanger adjustable and implement adjustment work, described first is logical
Hole is strip hole in the front-back direction, and including two;Two first through hole are arranged in parallel.
Specific structure as the dry-hang stone curtain wall designs, and base's keel include lateral keel, vertical dragon
Bone;The lateral keel is fixedly connected with the vertical keel;The fixed part is fixed together with the lateral keel.
Further, the dry-hang stone curtain wall further includes channel steel pendant, is fixedly connected with wall ontology;The vertical dragon
Bone is fixed together with the channel steel pendant.
Further, the dry-hang stone curtain wall further includes T-type pendant;The stone panel passes through the T-type pendant
It is fixed in the lateral keel.
Compared with prior art, the advantages and positive effects of the utility model are as follows: a kind of band ornamental strip of the utility model
Dry-hang stone curtain wall by outer elastic force of elastic hanger by finishing strip pressing in the inside of stone panel, make the outer of ornamental strip
It is seamless between side surface and the inner surface of stone panel, improve the impression quality of dry-hang stone curtain wall.Pass through elastic hanger
The installation error generated in stone panel and ornamental strip installation process is eliminated in the elastic deformation of itself, is not needed through tune repeatedly
It is whole to be eliminated, substantially increase the installation effectiveness of dry-hang stone curtain wall.
Detailed description of the invention
Fig. 1 is that a kind of a kind of the crosscutting of embodiment for dry-hang stone curtain wall with ornamental strip that the utility model is proposed is bowed
View;
Fig. 2 is the sectional view along A-A in Fig. 1.
In figure, the corresponding title of each label is as follows:
1, stone panel;2, ornamental strip;3, elastic hanger;4, gap;5, lateral keel;6, tapping screw;7, T-type is hung
Part;8, the first bolt assembly;9, vertical keel;10, channel steel pendant;11, the second bolt assembly;301, elastic portion;302, fixed
Portion;303, first through hole;501, the first side wall;502, second sidewall;503, the second through-hole;701, the first strip hole;901, it passes through
Hole all;1001, the second strip hole.
Specific embodiment
A kind of specific embodiment of dry-hang stone curtain wall with ornamental strip of the utility model is made with reference to the accompanying drawing
Illustrate in further detail.
Referring to Figures 1 and 2, a kind of dry-hang stone curtain wall with ornamental strip of the utility model includes base's keel, stone material
Panel 1, ornamental strip 2, elastic hanger 3.Base's keel are fixedly connected with base course wall.Stone panel 1 include it is multiple, be assembled in one
It rises cladding on base's keel.It is provided with gap 4 between the adjacent stone panel 1 in left and right, for showing ornamental strip 2, is showed dry
Hang the decorative effect of stone curtain wall.Ornamental strip 2 is plate strip, and the inside for being located at the adjacent stone panel 1 in left and right is corresponding
The position in above-mentioned gap 4 is covered on above-mentioned gap 4, and shows ornamental strip 2 to the decorative effect of curtain wall from the gap 4.Elasticity
Pendant 3 is located at the inside of ornamental strip 2 comprising first end, second end.First end is fixedly connected with ornamental strip 2.Second end and base
Layer keel are fixedly connected, and elastic hanger 3 is in compression deformed state, and ornamental strip 2 is pressed on stone material by its elasticity tension
The inside of panel 1, makes seamless between the inner surface of stone panel 1 and the outer surface of ornamental strip 2, avoids in the prior art
Gap between the inside of stone panel 1 and the outside of ornamental strip 2 improves black seam phenomenon, improves the perception of dry-hang stone curtain wall
Quality.In addition, since the deformation tension of elastic hanger 3 makes ornamental strip 2 be pressed on the inside of stone panel 1, and do not have to pass through again
Adjustment position repeatedly increases installation accuracy and eliminates installation gap, reduces the process adjusted repeatedly, improves dry-hang stone curtain
The installation effectiveness of wall.
Below by specific embodiment, to a kind of specific knot of dry-hang stone curtain wall with ornamental strip of the utility model
Structure design and working principle are described in detail.
Referring to FIG. 1 and FIG. 2, base's keel include vertical keel 9 and lateral keel 5.Vertical keel 9 is that cross section is " mouth "
The profile of shape, is vertically arranged, and perforation through-hole 901 is provided on the side wall of the left and right sides.Dry-hang stone curtain wall further includes
Channel steel pendant 10, the second bolt assembly 11.Channel steel pendant 10 includes slot bottom.There are two before and after being parallel to each other for setting on slot bottom
Second strip hole 1001 in direction.Correspondingly, the perforation through-hole 901 in the left and right two side walls of vertical keel 9 is also equipped with two
It is a, and be adapted to the installation of the second strip hole 1001 of slot bottom.An opening is respectively set outwardly in the left and right sides of vertical keel 9
Channel steel pendant 10, two perforation through-holes 901 correspond respectively with two the second strip holes 1001, and pass through the second bolt group
Vertical keel 9 is fixed together by part 11 through perforation through-hole 901 with the second strip hole 1001 with channel steel.And channel steel then with
The built-in fitting of base course wall is fixed together, and then vertical keel 9 is also secured on base course wall.
Lateral keel 5 is that cross section is L-shaped profile, is horizontally disposed with, including the first side wall 501, second sidewall 502.
Second sidewall 502 is placed vertically to be close to the front side wall of vertical keel 9, and the front side with vertical keel 9 by welding
Wall is fixed together.
Ornamental strip 2 in the present embodiment is the straight strip plate of stainless steel material production, surfacing, no bending and torsion
Folding, positioned at the inside of stone panel 1.Elastic hanger 3 is stainless steel steel disc, the steel disc of preferred 1.2mm thickness.Elastic hanger 3
Including elastic portion 301, fixed part 302.Elastic portion 301 is arc, has self- recoverage deformation behavior.Fixed part 302 is slide plate
Shape.One end of elastic portion 301 and the tangent connection in one end of fixed part 302.The other end of elastic portion 301 passes through welding and ornamental strip
2 inside is fixedly connected.The dry-hang stone curtain wall of the present embodiment further includes tapping screw 6.There are two for setting on fixed part 302
One through-hole 303 is adapted to the installation of tapping screw 6.Two tapping screws 6 pass through first through hole 303, connect with lateral keel 5,
It is fixed on fixed part 302 in lateral keel 5.Preferably, two first through hole 303 are strip hole in the front-back direction, and mutually
It is arranged in parallel.Fixed part 302 adjusts the front and back of elastic hanger 3 by adjusting the link position of first through hole 303 and tapping screw 6
Position makes position of the first end of elastic hanger 3 in free state beyond 1 inside of stone panel.
Referring to FIG. 1 and FIG. 2, the dry-hang stone curtain wall of the present embodiment further includes T-type pendant 7, the first bolt assembly 8.Up and down
Adjacent stone panel 1 is fixed in lateral keel 5 by T-type pendant 7.Specifically, T-type pendant 7 includes the main body of plate,
And it is provided in one end of main body and is respectively perpendicular upward, upper limit foot and lower limit foot vertically downward.In neighbouring stone
1 top and bottom of face plate are respectively arranged with the groove of the groove and opening upwards that Open Side Down, and the groove that Open Side Down with
The groove of opening upwards is corresponding.The upper limit foot and lower limit foot of T-type pendant 7 pass through respectively epoxide-resin glue be fixed on opening to
Under groove and opening upwards groove in.The first strip hole 701 in the front-back direction is provided in the main body of T-type pendant 7.?
The position of corresponding first strip hole 701 is provided with the second through-hole 503 on the first side wall 501, suitable with the installation of the first strip hole 701
Match.Neighbouring stone panel 1 passes through the first above-mentioned strip hole 701 by the first bolt assembly 8 and the second through-hole 503 will
Stone panel 1 is cladding in lateral keel 5.And the front-rear position of stone panel 1 can be long by first in 7 main body of T-type pendant
The link position adjustment in hole 701, is pressed on the inside of stone panel 1 on the outer surface of ornamental strip 2, avoids gap not
The generation of consistent phenomenon, increases the impression quality of dry-hang stone curtain wall, meets the requirement of decorative effect.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above,
The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model,
It should also belong to the protection scope of the utility model.
Claims (7)
1. a kind of dry-hang stone curtain wall with ornamental strip characterized by comprising
Base's keel;
Stone panel comprising muti-piece is bolted together fixed on base's keel;The adjacent stone panel in left and right
Between be provided with gap;
Ornamental strip covers the gap positioned at the inside of the stone panel for plate strip;
Elastic hanger is located at the inside of the ornamental strip, including first end, second end;The first end and the ornamental strip
It is fixedly connected;The second end is fixedly connected with base's keel;The elastic hanger is in compression deformed state.
2. dry-hang stone curtain wall according to claim 1, which is characterized in that the elastic hanger is stainless steel steel disc,
Including fixed part and elastic portion;The elastic portion is arcuate structure;The fixed part is flat construction;One end of the elastic portion
With the tangent connection in one end of the fixed part;The first end is located in the elastic portion;The second end is located at the fixation
In portion.
3. dry-hang stone curtain wall according to claim 2, which is characterized in that the ornamental strip is stainless steel ornamental strip;Institute
It states and is fixedly connected by welding together on the inside of first end and the ornamental strip;The dry-hang stone curtain wall further includes self tapping spiral shell
Nail;It is provided with first through hole on the fixed part, is adapted to tapping screw installation;The tapping screw passes through described
First through hole is fixedly connected with base's keel.
4. dry-hang stone curtain wall according to claim 3, which is characterized in that the first through hole is strip in the front-back direction
Hole, and including two;Two first through hole are arranged in parallel.
5. dry-hang stone curtain wall according to claim 4, which is characterized in that base's keel include lateral keel, erect
To keel;The lateral keel is fixedly connected with the vertical keel;The fixed part is fixedly connected on the lateral keel
Together.
6. dry-hang stone curtain wall according to claim 5, which is characterized in that it further include channel steel pendant, it is solid with wall ontology
Fixed connection;The vertical keel is fixed together with the channel steel pendant.
7. dry-hang stone curtain wall according to claim 5 or 6, which is characterized in that further include T-type pendant;The stone material surface
Plate is fixed in the lateral keel by the T-type pendant.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820476047.9U CN208455894U (en) | 2018-04-04 | 2018-04-04 | A kind of dry-hang stone curtain wall with ornamental strip |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820476047.9U CN208455894U (en) | 2018-04-04 | 2018-04-04 | A kind of dry-hang stone curtain wall with ornamental strip |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208455894U true CN208455894U (en) | 2019-02-01 |
Family
ID=65155499
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820476047.9U Expired - Fee Related CN208455894U (en) | 2018-04-04 | 2018-04-04 | A kind of dry-hang stone curtain wall with ornamental strip |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208455894U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114439142A (en) * | 2022-02-17 | 2022-05-06 | 阿郎装饰股份有限公司 | Stone curtain wall |
| CN116122472A (en) * | 2023-03-15 | 2023-05-16 | 德才装饰股份有限公司 | Stone curtain wall aluminum alloy grid installation component and method |
-
2018
- 2018-04-04 CN CN201820476047.9U patent/CN208455894U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114439142A (en) * | 2022-02-17 | 2022-05-06 | 阿郎装饰股份有限公司 | Stone curtain wall |
| CN114439142B (en) * | 2022-02-17 | 2023-11-03 | 阿郎装饰股份有限公司 | A kind of stone curtain wall |
| CN116122472A (en) * | 2023-03-15 | 2023-05-16 | 德才装饰股份有限公司 | Stone curtain wall aluminum alloy grid installation component and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7743575B2 (en) | Joint member | |
| CN100447357C (en) | Metal fixings and exterior wall construction | |
| CN208455894U (en) | A kind of dry-hang stone curtain wall with ornamental strip | |
| CA2746777C (en) | Joint member | |
| CN106013660B (en) | A kind of abatvoix and its installation method | |
| CN105064588A (en) | A brand-new composite suspended ceiling and its installation method | |
| CN206844407U (en) | A curtain wall decoration structure | |
| CN2499464Y (en) | Dovetail hanging piece for stone curtain wall | |
| CN204677058U (en) | A kind of slide door or window sealing decorative lid | |
| CN201521078U (en) | Keel for curtain wall type decoration integral plate dry connection | |
| CN202706273U (en) | Installing structure of all-hidden frame glass curtain wall | |
| CN217352895U (en) | Acrylic building capable of deforming in self-adaption mode | |
| CN200989126Y (en) | Assembling door covering | |
| CN217537723U (en) | Edge covering section for assembled background wall | |
| CN212104706U (en) | A kind of building decoration curtain wall installation fastener | |
| CN205712952U (en) | A kind of multifunctional decorative section | |
| CN209907702U (en) | Top surface mantle smallpox binding off mounting structure of assembled fitment | |
| CN107795088A (en) | The erecting device of heat insulation decoration integrated plate | |
| CN207749697U (en) | Adjustable Buckle device and construction wall for building | |
| ITBZ970007U1 (en) | DRAWER | |
| KR101122579B1 (en) | Installation structure of decoration plate on door | |
| CN105178748A (en) | Window body fixing hinge and window | |
| CN210342521U (en) | Support is used in installation of integrated wallboard | |
| CN207499309U (en) | The installation component of heat insulation decoration integrated plate | |
| CN111002807A (en) | Outer water bar of door glass |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190201 |