[go: up one dir, main page]

CN221929259U - Spool pre-buried structure - Google Patents

Spool pre-buried structure Download PDF

Info

Publication number
CN221929259U
CN221929259U CN202420414801.1U CN202420414801U CN221929259U CN 221929259 U CN221929259 U CN 221929259U CN 202420414801 U CN202420414801 U CN 202420414801U CN 221929259 U CN221929259 U CN 221929259U
Authority
CN
China
Prior art keywords
wire
pipe
pipe joint
cup comb
junction box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420414801.1U
Other languages
Chinese (zh)
Inventor
蒋先超
王延凡
周成罗
郭海涛
黄能华
邓奇东
马宇州
李良斌
唐奇斌
李江
杨志豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Huarong Construction Engineering Co ltd
Original Assignee
Guangdong Huarong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Huarong Construction Engineering Co ltd filed Critical Guangdong Huarong Construction Engineering Co ltd
Priority to CN202420414801.1U priority Critical patent/CN221929259U/en
Application granted granted Critical
Publication of CN221929259U publication Critical patent/CN221929259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Flanged Joints, Insulating Joints, And Other Joints (AREA)

Abstract

本实用新型涉及建筑施工领域,具体是一种线管预埋结构,包括若干个线管和接线盒;若干个第一管接头,所述第一管接头通过所述紧固件与所述线管安装连接;若干个热缩管,所述热缩管套设在所述第一管接头外;若干个第二管接头,每个所述第二管接头位于所述接线盒和所述线管之间。本实用新型通过设置有热缩管管,混凝土流浆不会通过线管与连接件的接口缝隙进入线管或者接线盒内,不会造成线管或者接线盒堵塞,可以顺利穿线,也可实现防止混凝土流浆腐蚀线管的双重效果,更好地提升安装质量。

The utility model relates to the field of building construction, specifically a wire pipe pre-buried structure, including a plurality of wire pipes and a junction box; a plurality of first pipe joints, the first pipe joints are installed and connected with the wire pipe through the fasteners; a plurality of heat shrink tubes, the heat shrink tubes are sleeved outside the first pipe joints; a plurality of second pipe joints, each of the second pipe joints is located between the junction box and the wire pipe. The utility model is provided with heat shrink tubes, so that concrete slurry will not enter the wire pipe or the junction box through the interface gap between the wire pipe and the connector, and will not cause the wire pipe or the junction box to be blocked, so that the wire can be threaded smoothly, and the dual effect of preventing concrete slurry from corroding the wire pipe can be achieved, thereby better improving the installation quality.

Description

一种线管预埋结构A wire tube pre-buried structure

技术领域Technical Field

本实用新型涉及建筑施工技术领域,具体是一种线管预埋结构。The utility model relates to the technical field of building construction, in particular to a wire tube pre-buried structure.

背景技术Background Art

《套接紧定式钢导管电线管路施工及验收规程》(CECS120-2007)等标准及设计要求消防报警线路、应急照明线路、人防工程、强弱电等预埋工程需要采用JDG金属线管进行预埋。The standards and designs such as "Construction and Acceptance Procedures for Socket-Fixed Steel Conduit Wire and Pipeline" (CECS120-2007) require that JDG metal wire pipes be used for pre-buried projects such as fire alarm lines, emergency lighting lines, civil air defense projects, and strong and weak electricity.

现有技术中采用JDG金属线管进行预埋,规程要求“直管连接时,两管口分别插入直管接头中间,紧贴凹槽处两端,用紧定螺钉定位后,进行旋紧至螺帽脱落”。因线管与管件连接时,管件内径稍大于管件外径,常造成混凝土浇筑时会有少量混凝土流浆通过线管与连接件的接口缝隙进入线管内,有造成线管堵塞,严重时无法穿线的情况。In the prior art, JDG metal wire tubes are used for pre-embedding. The regulations require that "when connecting straight pipes, the two pipe openings are respectively inserted into the middle of the straight pipe joint, close to the two ends of the groove, and positioned with set screws before tightening until the nuts fall off." Because when the wire tube is connected to the pipe fitting, the inner diameter of the pipe fitting is slightly larger than the outer diameter of the pipe fitting, a small amount of concrete slurry often flows into the wire tube through the interface gap between the wire tube and the connector during concrete pouring, causing the wire tube to be blocked and, in severe cases, unable to thread the wire.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种线管预埋结构,至少以解决上述背景技术中提出的问题之一。The purpose of the utility model is to provide a wire tube pre-buried structure to at least solve one of the problems raised in the above background technology.

本实用新型的技术方案是:The technical solution of the utility model is:

一种线管预埋结构,包括:A wire tube pre-buried structure, comprising:

若干个线管和接线盒;Several conduits and junction boxes;

若干个第一管接头,每个所述第一管接头位于相邻的两个所述线管之间,所述第一管接头上设置有至少两个紧定螺栓,所述第一管接头通过所述紧定螺栓与所述线管安装连接固定;A plurality of first pipe joints, each of which is located between two adjacent wire pipes, and at least two fixing bolts are provided on the first pipe joint, and the first pipe joint is installed, connected and fixed to the wire pipe through the fixing bolts;

若干个热缩管,所述热缩管套设在所述第一管接头外,所述热缩管的长度大于所述第一管接头的长度;A plurality of heat shrink tubes, wherein the heat shrink tubes are sleeved outside the first pipe joint, and the length of the heat shrink tubes is greater than the length of the first pipe joint;

若干个第二管接头,每个所述第二管接头位于所述接线盒和所述线管之间,所述第二管接头的一端与所述接线盒通过杯梳件连接,所述第二管接头的另一端与线管连接。A plurality of second pipe joints, each of which is located between the junction box and the wire tube, one end of the second pipe joint is connected to the junction box through a cup comb, and the other end of the second pipe joint is connected to the wire tube.

进一步地,所述第二管接头包括螺纹连接的紧定螺栓和热缩管,所述热缩管上设置有至少一个紧定螺栓,所述第一管接头通过所述紧定螺栓与所述线管安装连接固定,所述杯梳件包括杯梳部和连接部,所述连接部用所述杯梳上的紧定螺栓与线管连接,所述接线盒的侧壁位于所述杯梳部处。Furthermore, the second pipe joint includes a threaded fixing bolt and a heat shrink tube, the heat shrink tube is provided with at least one fixing bolt, the first pipe joint is installed, connected and fixed to the wire tube via the fixing bolt, the cup comb component includes a cup comb portion and a connecting portion, the connecting portion is connected to the wire tube via the fixing bolt on the cup comb, and the side wall of the junction box is located at the cup comb portion.

进一步地,所述第一管接头和第二管接头上开设有紧定螺栓,所述连接部与所述线管用紧定螺栓连接,所述杯梳件的内面紧贴所述线管的外表面。Furthermore, the first pipe joint and the second pipe joint are provided with fixing bolts, the connecting portion is connected to the wire tube by fixing bolts, and the inner surface of the cup comb is in close contact with the outer surface of the wire tube.

进一步地,所述第一管接头内壁中部设置有定位环,所述定位环位于所述第一管接头中间部位。Furthermore, a positioning ring is provided in the middle of the inner wall of the first pipe joint, and the positioning ring is located in the middle part of the first pipe joint.

进一步地,所述接线盒外壁面开设有多个预留杯梳安装孔,所述杯梳的直径与所述预留杯梳安装孔的直径匹配。Furthermore, a plurality of reserved cup comb installation holes are provided on the outer wall surface of the junction box, and the diameter of the cup comb matches the diameter of the reserved cup comb installation holes.

进一步地,所述连接部穿过所述预留杯梳安装孔与所述线管螺纹连接。Furthermore, the connecting portion passes through the reserved cup comb installation hole and is threadedly connected to the wire tube.

进一步地,所述杯梳安装孔处设置有挡片。Furthermore, a blocking piece is provided at the cup comb mounting hole.

进一步地,所述挡片和杯梳安装孔通过至少一个紧定螺栓连接。Furthermore, the baffle and the cup comb mounting hole are connected by at least one fastening bolt.

进一步地,所述第一管接头和第二管接头均采用铁锌合金制成。Furthermore, the first pipe joint and the second pipe joint are both made of iron-zinc alloy.

本实用新型通过改进在此提供一种线管预埋结构,与现有技术相比,至少具有如下改进及有益效果:The utility model provides a wire tube pre-buried structure through improvement, which has at least the following improvements and beneficial effects compared with the prior art:

本实用新型通过在第一管接头外设置有热缩管,通过使用热风机或者喷枪等热源加热所述热缩管,使得所述热缩管收缩并箍紧所述第一管接头和线管,混凝土流浆不会通过线管与连接件的接口缝隙进入线管内,不会造成线管堵塞,可以顺利穿线。在第二管接头设置有所述杯梳,所述线管和接线盒连接通过所述杯梳部进行固定连接,同时在所述第二管接头设备有所述热缩管管,通过使用热风机或者喷枪等热源加热所述热缩管,使得所述热缩管收缩并箍紧所述第二管接头和线管,混凝土流浆也不会通过线管与连接件的接口缝隙进入线管或者接线盒内,不会造成线管或者接线盒堵塞,可以顺利穿线,也可实现防止混凝土流浆腐蚀线管的双重效果,更好地提升安装质量。The utility model is provided with a heat shrink tube outside the first pipe joint, and the heat shrink tube is heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tube shrinks and tightens the first pipe joint and the wire pipe, and the concrete slurry will not enter the wire pipe through the interface gap between the wire pipe and the connector, and will not cause the wire pipe to be blocked, so the wire can be threaded smoothly. The cup comb is provided at the second pipe joint, and the wire pipe and the junction box are fixedly connected through the cup comb part. At the same time, the heat shrink tube is equipped at the second pipe joint, and the heat shrink tube is heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tube shrinks and tightens the second pipe joint and the wire pipe, and the concrete slurry will not enter the wire pipe or the junction box through the interface gap between the wire pipe and the connector, and will not cause the wire pipe or the junction box to be blocked, so the wire can be threaded smoothly, and the dual effect of preventing the concrete slurry from corroding the wire pipe can be achieved, thereby better improving the installation quality.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

下面结合附图和实施例对本实用新型作进一步解释:The utility model is further explained below in conjunction with the accompanying drawings and embodiments:

图1是本实用新型所述第一管接头预埋结构的部分结构示意图;FIG1 is a partial structural schematic diagram of the first pipe joint embedded structure of the utility model;

图2是本实用新型所述第二管接头预埋结构另一部分的结构示意图;FIG2 is a schematic structural diagram of another part of the second pipe joint embedded structure of the utility model;

图3是本实用新型所述第二管接头预埋结构又一部分的结构示意图;FIG3 is a schematic structural diagram of another part of the second pipe joint embedded structure of the utility model;

图4是本实用新型所述第二管接头的结构示意图;FIG4 is a schematic structural diagram of the second pipe joint of the present invention;

图5是本实用新型所述杯梳件的结构示意图;FIG5 is a schematic structural diagram of the cup comb member of the present invention;

图6是本实用新型所述第一管接头的结构示意图。FIG. 6 is a schematic structural diagram of the first pipe joint of the present invention.

附图标记说明:Description of reference numerals:

1、线管;2、接线盒;3、第一管接头;4、第二管接头;5、热缩管;21、接线盒敲落孔;22、挡片;23、支脚;24、安装耳;241、安装孔;31、紧定螺栓;32、固定环;41、杯梳件;42、套管;411、杯梳部;412、连接部。1. Wire tube; 2. Junction box; 3. First pipe joint; 4. Second pipe joint; 5. Heat shrink tube; 21. Junction box knock-out hole; 22. Baffle; 23. Support foot; 24. Mounting ear; 241. Mounting hole; 31. Tightening bolt; 32. Fixing ring; 41. Cup comb piece; 42. Sleeve; 411. Cup comb part; 412. Connecting part.

具体实施方式DETAILED DESCRIPTION

下面对本实用新型进行详细说明,对本实用新型实施例中的技术方案进行清楚、完整地描述。The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are described clearly and completely.

在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

本实用新型的描述中,若干的含义是一个或者多个,多个的含义是两个及两个以上,大于、小于、超过等理解为不包括本数,以上、以下、以内等理解为包括本数。还应当理解,在本申请说明书和所附权利要求书中使用的术语“和/或”是指相关联列出的项中的一个或多个的任何组合以及所有可能组合,并且包括这些组合。术语“包括”、“包含”、“具有”及它们的变形都意味着“包括但不限于”,除非是以其他方式另外特别强调。In the description of the present utility model, the meaning of "several" is one or more, the meaning of "many" is two or more, "greater than", "less than", "exceed", etc. are understood to exclude the number, and "above", "below", "within", etc. are understood to include the number. It should also be understood that the term "and/or" used in the specification of this application and the attached claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

另外,在本申请说明书和所附权利要求书的描述中,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

本实用新型的描述中,除非另有明确的限定,设置、安装、连接等词语应做广义理解,所属技术领域技术人员可以结合技术方案的具体内容合理确定上述词语在本实用新型中的具体含义。In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

《套接紧定式钢导管电线管路施工及验收规程》(CECS120-2007)等标准及设计要求消防报警线路、应急照明线路、人防工程、强弱电等预埋工程需要采用JDG金属线管进行预埋。The standards and designs such as "Construction and Acceptance Procedures for Socket-Fixed Steel Conduit Wire and Pipeline" (CECS120-2007) require that JDG metal wire pipes be used for pre-buried projects such as fire alarm lines, emergency lighting lines, civil air defense projects, and strong and weak electricity.

现有技术中采用JDG金属线管进行预埋,规程要求“直管连接时,两管口分别插入直管接头中间,紧贴凹槽处两端,用紧定螺钉定位后,进行旋紧至螺帽脱落”。因线管与管件连接时,管件内径稍大于管件外径,常造成混凝土浇筑时会有少量混凝土流浆通过线管与连接件的接口缝隙进入线管内,有造成线管堵塞,严重时无法穿线的情况。In the prior art, JDG metal wire tubes are used for pre-embedding. The regulations require that "when connecting straight pipes, the two pipe openings are respectively inserted into the middle of the straight pipe joint, close to the two ends of the groove, and positioned with set screws before tightening until the nuts fall off." Because when the wire tube is connected to the pipe fitting, the inner diameter of the pipe fitting is slightly larger than the outer diameter of the pipe fitting, a small amount of concrete slurry often flows into the wire tube through the interface gap between the wire tube and the connector during concrete pouring, causing the wire tube to be blocked and, in severe cases, unable to thread the wire.

本实用新型通过改进在此提供一种线管预埋结构,本实用新型的技术方案是:The utility model provides a wire tube pre-buried structure through improvement. The technical solution of the utility model is:

如图1所示,一种线管预埋结构,包括:As shown in FIG1 , a wire tube pre-buried structure includes:

若干个线管1和接线盒2,所述线管1能够防止电线电缆被损坏或绞断,从而提高施工的安全性和可靠性。线管1还能够防止电线电缆被外力损坏,提高电力传输的稳定性和可靠性。线管1与接线盒2连接,线管1中的电线在接线盒2中进行连接,起到保护电线和连接电线的作用。Several wire tubes 1 and junction boxes 2, wherein the wire tube 1 can prevent the wires and cables from being damaged or twisted, thereby improving the safety and reliability of construction. The wire tube 1 can also prevent the wires and cables from being damaged by external forces, thereby improving the stability and reliability of power transmission. The wire tube 1 is connected to the junction box 2, and the wires in the wire tube 1 are connected in the junction box 2, which plays the role of protecting the wires and connecting the wires.

若干个第一管接头3,如图1和图6所示,每个所述第一管接头3位于相邻的两个所述线管1之间,所述第一管接头3上设置有至少两个杯梳件31,所述第一管接头3通过所述紧定螺栓31与所述线管1安装连接。所述第一管接头3上开设有紧固孔,所述紧定螺栓31与所述紧固孔螺纹连接,所述紧定螺栓31的内表面紧贴所述线管1的外表面。安装时,先将两根所述线管1分别插入所述第一管接头3内,然后旋紧所述紧定螺栓31,将所述线管1和所述第一管接头3安装固定在一起。在一些实施例中,所述紧定螺栓31可以设置有多个,且成一定角度的分布在所述第一管接头3侧壁上,使得线管1和所述第一管接头3的连接更加稳固。Several first pipe joints 3, as shown in FIG1 and FIG6 , each of the first pipe joints 3 is located between two adjacent wire pipes 1, and at least two cup combs 31 are provided on the first pipe joint 3, and the first pipe joint 3 is installed and connected with the wire pipe 1 through the fixing bolts 31. A fixing hole is provided on the first pipe joint 3, and the fixing bolts 31 are threadedly connected with the fixing hole, and the inner surface of the fixing bolts 31 is in close contact with the outer surface of the wire pipe 1. During installation, the two wire pipes 1 are respectively inserted into the first pipe joint 3, and then the fixing bolts 31 are tightened to fix the wire pipe 1 and the first pipe joint 3 together. In some embodiments, a plurality of fixing bolts 31 may be provided, and they are distributed at a certain angle on the side wall of the first pipe joint 3, so that the connection between the wire pipe 1 and the first pipe joint 3 is more stable.

在一些实施例中,所述第一管接头3内壁中部设置有固定环32,所述固定环32位于两相邻所述第一接头3之间。所述固定环32用于所述线管1安装时对所述线管1进行定位。避免第一管接头3连接两根线管1时,一根线管1插入第一管接头3的部分过长,而另一根线管1插入管接头的部分过短,避免造成的应力分布不均匀,线管1不易脱出,安装更加稳固。In some embodiments, a fixing ring 32 is provided at the middle of the inner wall of the first pipe joint 3, and the fixing ring 32 is located between two adjacent first joints 3. The fixing ring 32 is used to position the wire tube 1 when the wire tube 1 is installed. When the first pipe joint 3 connects two wire tubes 1, it is prevented that the part of one wire tube 1 inserted into the first pipe joint 3 is too long, while the part of the other wire tube 1 inserted into the pipe joint is too short, so as to avoid uneven stress distribution, and the wire tube 1 is not easy to fall out, and the installation is more stable.

若干个热缩管5,如图1所示,所述热缩管5套设在所述第一管接头3外,所述热缩管5的长度大于所述第一管接头3的长度。在所述第一管接头3安装完成后,套上所述热缩管5,然后使用热风机或者喷枪等热源加热所述热缩管5,使得所述热缩管5收缩并箍紧所述第一管接头3和线管1,此时混凝土流浆不会通过线管1与连接件的接口缝隙进入线管1内,不会造成线管1堵塞,可以顺利穿线。Several heat shrink tubes 5 are provided as shown in FIG1 . The heat shrink tubes 5 are sleeved outside the first pipe joint 3, and the length of the heat shrink tubes 5 is greater than the length of the first pipe joint 3. After the first pipe joint 3 is installed, the heat shrink tubes 5 are sleeved, and then the heat shrink tubes 5 are heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tubes 5 shrink and tighten the first pipe joint 3 and the wire pipe 1. At this time, the concrete slurry will not enter the wire pipe 1 through the interface gap between the wire pipe 1 and the connector, and will not cause the wire pipe 1 to be blocked, so the wire can be threaded smoothly.

若干个第二管接头4,如图2和图3所示,每个所述第二管接头4位于所述接线盒2和所述线管1之间,所述第二管接头4的一端与所述接线盒2杯梳连接,所述第二管接头4的另一端与所述线管1连接。所述第二管接头4用于连接所述线管1和接线盒2,同时对二者的连接处进行固定和密封。A plurality of second pipe joints 4, as shown in Fig. 2 and Fig. 3, each of the second pipe joints 4 is located between the junction box 2 and the wire tube 1, one end of the second pipe joint 4 is connected to the junction box 2 cup comb, and the other end of the second pipe joint 4 is connected to the wire tube 1. The second pipe joint 4 is used to connect the wire tube 1 and the junction box 2, and fix and seal the connection between the two.

在一些实施例中,如图2所示,所述第二管接头4外也套设有所述热缩管5,所述热缩管5的长度大于所述第二管接头4的长度。在所述第二管接头4安装完成后,套上所述热缩管5,然后使用热风机或者喷枪等热源加热所述热缩管5,使得所述热缩管5收缩并箍紧所述第二管接头4和线管1,此时混凝土流浆不会通过线管1与连接件的接口缝隙进入线管1内,也不会进入所述接线盒2内,不会造成线管1和接线盒2堵塞,可以顺利穿线、接线工作。In some embodiments, as shown in FIG2 , the heat shrink tube 5 is also sleeved outside the second pipe joint 4, and the length of the heat shrink tube 5 is greater than the length of the second pipe joint 4. After the second pipe joint 4 is installed, the heat shrink tube 5 is sleeved, and then the heat shrink tube 5 is heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tube 5 shrinks and tightens the second pipe joint 4 and the wire pipe 1. At this time, the concrete slurry will not enter the wire pipe 1 through the interface gap between the wire pipe 1 and the connector, nor will it enter the junction box 2, so that the wire pipe 1 and the junction box 2 will not be blocked, and the threading and wiring work can be smooth.

在一些实施例中,如图4和图5所示,所述第二管接头4包括螺纹连接的杯梳件41和套管42,所述杯梳件41和所述套管42用于对所述接线盒2的连接处进行固定,及对所述线管1和接线盒2连接。所述套管42上设置有至少一个紧定螺栓31,第二管接头4上设有紧定螺栓孔,所述紧定螺栓31与所述紧固孔螺纹连接。所述第一管接头3通过所述紧定螺栓31与所述线管1安装连接。所述杯梳件41包括杯梳部411和连接部412,所述连接部412与所述套管42螺纹连接,所述接线盒2的侧壁位于所述杯梳部411和套管42之间。In some embodiments, as shown in FIG. 4 and FIG. 5 , the second pipe joint 4 includes a cup comb 41 and a sleeve 42 that are threadedly connected. The cup comb 41 and the sleeve 42 are used to fix the connection of the junction box 2 and connect the wire tube 1 and the junction box 2. The sleeve 42 is provided with at least one fixing bolt 31, and the second pipe joint 4 is provided with a fixing bolt hole, and the fixing bolt 31 is threadedly connected to the fixing hole. The first pipe joint 3 is installed and connected to the wire tube 1 through the fixing bolt 31. The cup comb 41 includes a cup comb part 411 and a connecting part 412, and the connecting part 412 is threadedly connected to the sleeve 42. The side wall of the junction box 2 is located between the cup comb part 411 and the sleeve 42.

在一些实施例中,如图4和图5所示,所述接线盒2外壁面开设有多个预留杯梳孔21,所述杯梳部411的直径大于所述预留杯梳孔21的直径。连接所述线管1和所述预留接线盒2时,首先将所述杯梳件41的杯梳部411从所述接线盒2内部插入所述预留杯梳孔21内,所述杯梳件41的杯梳部411贴紧所述接线盒2的内壁,将杯梳套管部分412与411进行螺纹连接,安装固定在接线盒上;然后将所述线管1插入所述套管42中,再旋紧所述紧定螺栓31,将所述线管1和所述套管42固定在一起,即可完成所述线管1和接线盒2的安装。由于设置了所述杯梳部411,所述线管1和接线盒2连接处的缝隙被所述杯梳部411遮挡,混凝土流浆不会通过线管1与连接件的接口缝隙进入线管1或者接线盒2内,不会造成线管1和接线盒2堵塞,可以顺利穿线和接线工作。In some embodiments, as shown in FIG. 4 and FIG. 5 , the outer wall of the junction box 2 is provided with a plurality of reserved cup comb holes 21, and the diameter of the cup comb portion 411 is larger than the diameter of the reserved cup comb hole 21. When connecting the wire tube 1 and the reserved junction box 2, firstly insert the cup comb portion 411 of the cup comb member 41 into the reserved cup comb hole 21 from the inside of the junction box 2, the cup comb portion 411 of the cup comb member 41 is pressed against the inner wall of the junction box 2, and the cup comb sleeve portion 412 is threadedly connected with 411, and is installed and fixed on the junction box; then the wire tube 1 is inserted into the sleeve 42, and then the fixing bolt 31 is tightened to fix the wire tube 1 and the sleeve 42 together, and the installation of the wire tube 1 and the junction box 2 is completed. Due to the provision of the cup comb portion 411, the gap at the connection between the wire tube 1 and the junction box 2 is blocked by the cup comb portion 411, and concrete slurry will not enter the wire tube 1 or the junction box 2 through the interface gap between the wire tube 1 and the connector, and will not cause blockage of the wire tube 1 and the junction box 2, so that threading and wiring work can be carried out smoothly.

在一些实施例中,如图2和图3所示,所述预留杯梳孔21处设置有挡片22。所述挡片22和预留杯梳孔21通过至少一个支脚23连接。所述支脚23设置为可被破坏的支脚23,在需要使用某一预留杯梳孔21时,才破坏所述支脚23,然后将其对应的挡片22拆除,操作更加简便,尽可能保证接线盒2的完整性,避免混凝土流浆进入接线盒内,保证盒体强度。In some embodiments, as shown in FIG. 2 and FIG. 3 , a baffle 22 is provided at the reserved cup comb hole 21. The baffle 22 and the reserved cup comb hole 21 are connected by at least one support leg 23. The support leg 23 is configured to be a destructible support leg 23. When a certain reserved cup comb hole 21 needs to be used, the support leg 23 is destroyed, and then the corresponding baffle 22 is removed, which makes the operation easier, ensures the integrity of the junction box 2 as much as possible, prevents concrete slurry from entering the junction box, and ensures the strength of the box body.

在一些实施例中,如图2和图3所示,所述接线盒2上设置有多个安装耳24,所述安装耳24中央开设有安装孔241。所述安装耳24和安装孔241用于在所述接线盒2安装开关、插座等面板。In some embodiments, as shown in Figures 2 and 3, the junction box 2 is provided with a plurality of mounting ears 24, and a mounting hole 241 is provided in the center of the mounting ears 24. The mounting ears 24 and the mounting holes 241 are used to install panels such as switches and sockets on the junction box 2.

在一些实施例中,所述第一管接头3和第二管接头4均采用铁锌合金制成。In some embodiments, the first pipe joint 3 and the second pipe joint 4 are both made of iron-zinc alloy.

本实施例通过在第一管接头3外设置有热缩管5,通过使用热风机或者喷枪等热源加热所述热缩管5,使得所述热缩管5收缩并箍紧所述第一管接头3和线管1,混凝土流浆不会通过线管1与连接件的接口缝隙进入线管1内,不会造成线管1堵塞,可以顺利穿线。同时通过设置有所述杯梳部411,所述线管1和接线盒2连接处的缝隙被所述杯梳部411遮挡,同时在第二管接头4外设置有热缩管5,通过使用热风机或者喷枪等热源加热所述热缩管5,使得所述热缩管5收缩并箍紧所述第二管接头4和线管1,混凝土流浆也不会通过线管1与连接件的接口缝隙进入线管1或者接线盒2内,不会造成线管1和接线盒2堵塞,可以顺利穿线和接线,也可实现防止混凝土流浆腐蚀线管1和接线盒2的双重效果,更好地提升安装质量。In this embodiment, a heat shrink tube 5 is arranged outside the first pipe joint 3, and the heat shrink tube 5 is heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tube 5 shrinks and tightens the first pipe joint 3 and the wire tube 1, and the concrete slurry will not enter the wire tube 1 through the interface gap between the wire tube 1 and the connector, and will not cause the wire tube 1 to be blocked, so that the wire can be threaded smoothly. At the same time, by providing the cup comb part 411, the gap at the connection between the wire tube 1 and the junction box 2 is blocked by the cup comb part 411, and at the same time, a heat shrink tube 5 is arranged outside the second pipe joint 4, and the heat shrink tube 5 is heated by a heat source such as a hot air blower or a spray gun, so that the heat shrink tube 5 shrinks and tightens the second pipe joint 4 and the wire tube 1, and the concrete slurry will not enter the wire tube 1 or the junction box 2 through the interface gap between the wire tube 1 and the connector, and will not cause the wire tube 1 and the junction box 2 to be blocked, so that the wire can be threaded and connected smoothly, and the dual effect of preventing the concrete slurry from corroding the wire tube 1 and the junction box 2 can be achieved, thereby better improving the installation quality.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed in the present invention should be included in the protection scope of the present invention.

Claims (9)

1.一种线管预埋结构,其特征在于,包括:1. A wire tube pre-buried structure, characterized by comprising: 若干个线管和接线盒;Several conduits and junction boxes; 若干个第一管接头,每个所述第一管接头位于相邻的两个所述线管之间,所述第一管接头上设置有至少两个紧定螺栓,所述第一管接头通过所述紧定螺栓与所述线管安装连接固定;A plurality of first pipe joints, each of which is located between two adjacent wire pipes, and at least two fixing bolts are provided on the first pipe joint, and the first pipe joint is installed, connected and fixed to the wire pipe through the fixing bolts; 若干个热缩管,所述热缩管套设在所述第一管接头外,所述热缩管的长度大于所述第一管接头的长度;A plurality of heat shrink tubes, wherein the heat shrink tubes are sleeved outside the first pipe joint, and the length of the heat shrink tubes is greater than the length of the first pipe joint; 若干个第二管接头,每个所述第二管接头位于所述接线盒和所述线管之间,所述第二管接头的一端与所述接线盒通过杯梳件连接,所述第二管接头的另一端与线管连接。A plurality of second pipe joints, each of which is located between the junction box and the wire tube, one end of the second pipe joint is connected to the junction box through a cup comb, and the other end of the second pipe joint is connected to the wire tube. 2.根据权利要求1所述的一种线管预埋结构,其特征在于,所述第二管接头包括螺纹连接的紧定螺栓和热缩管,所述热缩管上设置有至少一个紧定螺栓,所述第一管接头通过所述紧定螺栓与所述线管安装连接固定,所述杯梳件包括杯梳部和连接部,所述连接部用所述杯梳件上的紧定螺栓与线管连接,所述接线盒的侧壁位于所述杯梳部处。2. A wire pipe pre-buried structure according to claim 1, characterized in that the second pipe joint includes a threaded locking bolt and a heat shrink tube, the heat shrink tube is provided with at least one locking bolt, the first pipe joint is installed and fixed to the wire pipe through the locking bolt, the cup comb component includes a cup comb part and a connecting part, the connecting part is connected to the wire pipe by the locking bolts on the cup comb component, and the side wall of the junction box is located at the cup comb part. 3.根据权利要求2所述的一种线管预埋结构,其特征在于,所述第一管接头和第二管接头上开设有紧定螺栓,所述连接部与所述线管用紧定螺栓连接,所述杯梳件的内面紧贴所述线管的外表面。3. A wire pipe pre-buried structure according to claim 2, characterized in that the first pipe joint and the second pipe joint are provided with fixing bolts, the connecting part is connected to the wire pipe by fixing bolts, and the inner surface of the cup comb is in close contact with the outer surface of the wire pipe. 4.根据权利要求2所述的一种线管预埋结构,其特征在于,所述第一管接头内壁中部设置有定位环,所述定位环位于所述第一管接头中间部位。4. A wire pipe pre-buried structure according to claim 2, characterized in that a positioning ring is provided in the middle of the inner wall of the first pipe joint, and the positioning ring is located in the middle part of the first pipe joint. 5.根据权利要求2所述的一种线管预埋结构,其特征在于,所述接线盒外壁面开设有多个预留杯梳安装孔,所述杯梳的直径与所述预留杯梳安装孔的直径匹配。5. A wire tube embedded structure according to claim 2, characterized in that a plurality of reserved cup comb installation holes are opened on the outer wall surface of the junction box, and the diameter of the cup comb matches the diameter of the reserved cup comb installation holes. 6.根据权利要求5所述的一种线管预埋结构,其特征在于,所述连接部穿过所述预留杯梳安装孔与所述线管螺纹连接。6. A wire tube embedded structure according to claim 5, characterized in that the connecting portion passes through the reserved cup comb mounting hole and is threadedly connected to the wire tube. 7.根据权利要求5所述的一种线管预埋结构,其特征在于,所述杯梳安装孔处设置有挡片。7. A wire tube pre-buried structure according to claim 5, characterized in that a blocking piece is provided at the cup comb mounting hole. 8.根据权利要求7所述的一种线管预埋结构,其特征在于,所述挡片和杯梳安装孔通过至少一个紧定螺栓连接。8. A wire tube embedded structure according to claim 7, characterized in that the baffle and the cup comb mounting hole are connected by at least one fastening bolt. 9.根据权利要求1所述的一种线管预埋结构,其特征在于,所述第一管接头和第二管接头均采用铁锌合金制成。9. A wire tube pre-buried structure according to claim 1, characterized in that the first pipe joint and the second pipe joint are both made of iron-zinc alloy.
CN202420414801.1U 2024-03-05 2024-03-05 Spool pre-buried structure Active CN221929259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420414801.1U CN221929259U (en) 2024-03-05 2024-03-05 Spool pre-buried structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420414801.1U CN221929259U (en) 2024-03-05 2024-03-05 Spool pre-buried structure

Publications (1)

Publication Number Publication Date
CN221929259U true CN221929259U (en) 2024-10-29

Family

ID=93203363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420414801.1U Active CN221929259U (en) 2024-03-05 2024-03-05 Spool pre-buried structure

Country Status (1)

Country Link
CN (1) CN221929259U (en)

Similar Documents

Publication Publication Date Title
US7635816B1 (en) Connector / bushing assembly for electrical junction boxes
CN100536270C (en) Family fitment engineering circuit improvement single-tube single-wire system construction material and method
CN221929259U (en) Spool pre-buried structure
US10320167B2 (en) Conduit stub-up assembly
JP4278754B2 (en) Wall through structure of wall through pipe and wall through tool of wall through pipe
US5147979A (en) Threadless floor electric wire junction box with water-proof protection
CA2304297A1 (en) Electrical conduit and conduit system
KR100762012B1 (en) Piping protection sleeve
KR20200087058A (en) Guide device for electric wire
US5794853A (en) Institutional sprinkler head nipple
KR102436126B1 (en) Pipe connection structure of sprinkler system
CN1156914A (en) Crimp metal wire pipe box connecting mode
JP5702239B2 (en) Wiring / piping material fixing tool, wiring / piping material fixing structure and wiring / piping material fixing method
JP4707002B2 (en) Wire passing device and wire passing method
CN211830059U (en) Welded steel pipe and wire box connecting piece
CN100511893C (en) Steel thin wall penetration pipe and fitting parts thereof
CN111561212A (en) An adjustable fixing device for power cable
US7268295B1 (en) Puller/connector for electrical raceways
CN220108976U (en) Main transformer tunnel rat-proof device of hydropower station
CN213279085U (en) Tubular bus
CN216086063U (en) Engineering pre-buried electrical wire box
CN222638095U (en) Construction structure for metal conduit to pass through deformation joint of building
CN118693730A (en) A connection method for an industrial cable conduit fastening type connection box
CN221263277U (en) A convenient junction box
CN221805866U (en) Equipotential metal insert and pipe joint with same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant