JP2002073750A - Article supply planning device, article supply planning method, and article supply planning program - Google Patents
Article supply planning device, article supply planning method, and article supply planning programInfo
- Publication number
- JP2002073750A JP2002073750A JP2000262311A JP2000262311A JP2002073750A JP 2002073750 A JP2002073750 A JP 2002073750A JP 2000262311 A JP2000262311 A JP 2000262311A JP 2000262311 A JP2000262311 A JP 2000262311A JP 2002073750 A JP2002073750 A JP 2002073750A
- Authority
- JP
- Japan
- Prior art keywords
- supply
- order
- article
- source
- order quantity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
(57)【要約】
【課題】 供給元の受注から納品までに要する時間を考
慮してより適切な物品供給計画を立案する。
【解決手段】 入力された発注元Aの発注工程Anとそ
の発注量Xnに対して物品を生産するのに要する時間や
保管時間などを考慮したリードタイムt1、t2だけ発
注工程Anより前にズラして発注工程Anと同一のスパ
ンとして供給元B,Cの供給工程Bn,Cnを設定す
る。変更可能な分配比αnを用いて各発注量Xnを供給
元B,Cに分配し、この分配された発注量を同時刻の発
注工程Anからのリードタイムt1,t2により比例配
分して各供給工程Bn,Cnの供給計画量Yn,Znを
計算する。分配比αnを逐次変更して供給計画量Yn,
Znを計算すると共にその際の収益指標を計算し、収益
指標が最大となる分配比αnの供給計画量Yn,Znを
計画値とする。
(57) [Summary] [Problem] To formulate a more appropriate article supply plan in consideration of the time required from order receipt to delivery of a supply source. SOLUTION: For an input ordering process An of an ordering source A and an order quantity Xn, the lead times t1 and t2, which take into account the time required to produce articles and the storage time, are shifted before the ordering process An. Then, the supply steps Bn and Cn of the supply sources B and C are set as the same span as the ordering step An. The order quantity Xn is distributed to the supply sources B and C using the changeable distribution ratio αn, and the distributed order quantity is distributed in proportion to the lead times t1 and t2 from the ordering process An at the same time. The planned supply amounts Yn and Zn for the processes Bn and Cn are calculated. By sequentially changing the distribution ratio αn, the planned supply amount Yn,
At the same time as calculating Zn, the profit index at that time is calculated, and the planned supply amounts Yn, Zn of the distribution ratio αn at which the profit index is the maximum are set as plan values.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、物品供給計画立案
装置および物品供給計画立案方法並びに物品供給計画立
案用のプログラムに関し、詳しくは、発注元からの物品
の発注に対する複数の供給元からの物品の供給の計画を
立案する物品供給計画立案装置および物品供給計画立案
方法並びにコンピュータを物品供給計画立案装置として
機能させるコンピュータ読み取り可能なプログラムに関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an article supply planning device, an article supply planning method, and a program for article supply planning. More specifically, the present invention relates to an article supply plan for an article order from an order source. The present invention relates to an article supply planning device, an article supply planning method, and a computer-readable program that causes a computer to function as an article supply planning apparatus.
【0002】[0002]
【従来の技術】従来、この種の物品供給計画立案装置と
しては、顧客からの注文に応じて関連する部品工場から
の部品や原料が適正タイミングで供給されるよう各工場
の協調を促すシステムが提案されている(例えば、特開
平8−123535号公報など)。このシステムでは、
各工場に設置された計画協調システムによってネットワ
ークを構築し、計画協調システムを介してなされるネッ
トワーク上の工場からの要求に対し、要求を受け付けた
工場は計画システムにより計画されるその工場の生産計
画に基づいて応答することにより、部品や原料の供給の
タイミングの適正化が図れるものとされている。2. Description of the Related Art Conventionally, as an article supply planning system of this kind, there is a system for encouraging each factory to cooperate so that parts and raw materials from a related parts factory are supplied at an appropriate timing in response to an order from a customer. It has been proposed (for example, JP-A-8-123535). In this system,
A network is constructed by a plan coordination system installed at each factory, and in response to a request from a factory on the network made via the plan coordination system, the factory that receives the request prepares the production plan of the factory according to the planning system. , The timing of supply of parts and raw materials can be optimized.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、こうし
た工場間の協調システムでは、供給元の受注から納品ま
でに要する時間が考慮されていないため、より適切な供
給計画を立案することが困難であった。また、製品の全
体的なコストや在庫管理などが考慮されていないため、
企業体の収益がより大きくなるよう計画するのも困難で
あった。However, in such a cooperative system between factories, it is difficult to make a more appropriate supply plan because the time required from the ordering of the supplier to the delivery is not taken into account. . Also, since the overall cost of the product and inventory management are not taken into account,
It was also difficult to plan for a larger profit for the enterprise.
【0004】本発明の物品供給計画立案装置および物品
供給計画立案方法は、供給元の受注から納品までに要す
る時間を考慮してより適切な物品供給計画を立案するこ
とを目的の一つとする。また、本発明の物品供給計画立
案装置および物品供給計画立案方法は、企業体の収益が
より大きくなるよう物品供給計画を立案することを目的
の一つとする。An object of the present invention is to provide an article supply planning device and an article supply planning method in which a more appropriate article supply plan is created in consideration of the time required from order receipt to delivery of a supply source. Another object of the present invention is to provide an article supply plan drafting apparatus and an article supply plan drafting method for drafting an article supply plan so that the profit of a business entity is increased.
【0005】[0005]
【課題を解決するための手段およびその作用・効果】本
発明の物品供給計画立案装置および物品供給計画立案方
法並びに物品供給立案計画用のプログラムは、上述の目
的の少なくとも一部を達成するために以下の手段を採っ
た。Means for Solving the Problems and Action / Effects Thereof An article supply planning device, an article supply planning method and an article supply planning program according to the present invention are intended to achieve at least a part of the above objects. The following measures were taken.
【0006】本発明の物品供給計画立案装置は、発注元
からの物品の発注に対する複数の供給元からの物品の供
給の計画を立案する物品供給計画立案装置であって、前
記発注元からの物品の発注量を前記複数の供給元に分配
する発注量分配手段と、前記複数の供給元の物品の受注
に対して納品までに要する時間であるリードタイムだけ
前記発注元の発注工程からズラして該発注工程に対応す
る供給工程を供給元毎に設定する供給工程設定手段と、
該設定された供給工程と時間的に重なる発注工程におけ
る該供給工程が設定された供給元に対して前記発注量分
配手段により分配された発注量を前記リードタイムに基
づいて分配し、該供給工程の供給計画量を設定する供給
計画量設定手段とを備えることを要旨とする。An article supply planning apparatus according to the present invention is an article supply planning apparatus for planning an article supply from a plurality of suppliers in response to an article order from an orderer. Order quantity distributing means for distributing the order quantity to the plurality of suppliers, and shifting from the ordering process of the order source by the lead time which is the time required for the delivery of the order of the articles of the plurality of suppliers. Supply step setting means for setting a supply step corresponding to the ordering step for each supply source,
And distributing, based on the lead time, an order quantity distributed by the order quantity distributing means to a supply source for which the supply step is set in an order step overlapping with the set supply step in time. And a supply plan amount setting means for setting the supply plan amount of the above.
【0007】この本発明の物品供給計画立案装置では、
複数の供給元の物品の受注に対して納品までに要する時
間であるリードタイムだけ発注元の発注工程からズラし
てその発注工程に対応する供給工程を供給元毎に設定
し、この設定された供給工程と時間的に重なる発注工程
における供給工程が設定された供給元に対して分配され
た発注量をリードタイムに基づいて分配して各供給工程
の供給計画量を設定する。発注に対して納品までに要す
る時間であるリードタイムを考慮するから、納品のタイ
ミングや物品の生産等のタイミングをより適切なものと
することができる。即ち、より適切な物品の供給計画を
立案することができる。In the article supply planning device of the present invention,
The supply process corresponding to the ordering process is set for each supplier by shifting from the ordering process of the ordering source by the lead time which is the time required for the delivery of the order of the goods of a plurality of sources from the ordering source. The order quantity distributed to the supply source for which the supply process is set in the order process that temporally overlaps the supply process is distributed based on the lead time to set the supply plan amount of each supply process. Since the lead time, which is the time required for the order to be delivered, is taken into account, the timing of delivery and the timing of production of articles can be made more appropriate. That is, a more appropriate article supply plan can be drafted.
【0008】こうした本発明の物品供給計画立案装置に
おいて、前記発注元からの物品の発注から該発注した物
品が納入されるまでの企業経営指標を演算する経済指標
演算手段と、該演算された企業経営指標が最大となるよ
う前記発注量分配手段による発注量の分配を調整する発
注量分配調整手段とを備えるものとすることもできる。
こうすれば、企業経営指標が最大となるよう発注量を分
配するから、物品の供給計画を企業体の経営に資するも
のとすることができる。ここで、企業経営指標には、短
期的な収益指標や長期的な収益指標を用いることができ
る他、種々の指標を用いることができる。この態様の本
発明の物品供給計画立案装置において、前記発注量分配
調整手段は、前記複数の供給元に各々設定される供給可
能範囲内で前記発注量分配手段による発注量の分配を調
整する手段であるものとすることもできる。こうすれ
ば、供給元における供給可能範囲を制約条件として企業
経営指標が最大となるよう発注量を分配することができ
る。In the article supply planning device according to the present invention, economic index calculating means for calculating a business management index from the ordering of the article from the order source to the delivery of the ordered article, and the calculated company An order quantity distribution adjusting means for adjusting the order quantity distribution by the order quantity distributing means so as to maximize the management index may be provided.
In this case, the order quantity is distributed so that the corporate management index is maximized, so that the article supply plan can contribute to the management of the corporate entity. Here, a short-term profit index or a long-term profit index can be used as the corporate management index, and various indexes can be used. In the article supply planning device of this aspect of the present invention, the order quantity distribution adjusting means adjusts the distribution of the order quantity by the order quantity distribution means within a supplyable range set for each of the plurality of supply sources. May be used. In this way, the order quantity can be distributed so that the corporate management index is maximized with the supply range at the supplier being a constraint.
【0009】本発明の物品供給計画立案用のプログラム
は、コンピュータを、本発明のいずれかの態様の物品供
給計画立案装置として機能させるコンピュータ読み取り
可能なことを要旨とする。[0009] The program for planning an article supply plan of the present invention has a gist that it can be read by a computer that causes a computer to function as the article supply planning apparatus according to any one of the embodiments of the present invention.
【0010】この本発明の物品供給計画立案用のプログ
ラムによれば、コンピュータに読み取らせることによ
り、コンピュータを本発明のいずれかの態様の物品供給
計画立案装置として機能させることができる。According to the article supply planning program of the present invention, by causing a computer to read the program, the computer can function as the article supply planning apparatus according to any of the embodiments of the present invention.
【0011】本発明の物品供給計画立案方法は、発注元
からの物品の発注に対する複数の供給元からの物品の供
給の計画を立案する物品供給計画立案方法であって、前
記発注元からの物品の発注量を前記複数の供給元に分配
し、前記複数の供給元の物品の受注に対して納品までに
要する時間であるリードタイムだけ前記発注元の発注工
程からズラして該発注工程に対応する供給工程を供給元
毎に設定し、該設定された供給工程と時間的に重なる発
注工程における該供給工程が設定された供給元に対して
前記分配された発注量を前記リードタイムに基づいて分
配し、該供給工程の供給計画量を設定して物品の供給計
画を立案することを要旨とする。An article supply planning method according to the present invention is an article supply planning method for creating an article supply plan from a plurality of suppliers in response to an article order from an orderer. Is distributed to the plurality of suppliers, and the order process of the order source is shifted from the order process of the order source by a lead time which is a time required for delivery of the order of the articles of the plurality of sources. The supply order to be set is set for each supply source, and the order amount distributed to the supply source for which the supply process is set in the ordering process that temporally overlaps with the set supply process is based on the lead time. The gist of the present invention is to distribute and to set a supply plan amount of the supply process to draft a supply plan of articles.
【0012】この本発明の物品供給計画立案方法によれ
ば、発注に対して納品までに要する時間であるリードタ
イムを考慮して納品のタイミングや物品の生産等のタイ
ミングをより適切なものとする物品供給計画を立案する
ことができる。According to the article supply planning method of the present invention, the timing of delivery and the timing of production of articles are made more appropriate in consideration of the lead time which is the time required for order delivery. An article supply plan can be developed.
【0013】こうした本発明の物品供給計画立案方法に
おいて、前記発注元からの物品の発注から該発注した物
品が納入されるまでの企業経営指標を演算し、該演算さ
れた企業経営指標が最大となるよう前記複数の供給先へ
の発注量の分配を調整して物品の供給計画を立案するも
のとすることもできる。こうすれば、企業経営指標が最
大となるよう発注量を分配するから、物品の供給計画を
企業体の経営に資するものとすることができる。ここ
で、企業経営指標には、短期的な収益指標や長期的な収
益指標を用いることができる他、種々の指標を用いるこ
とができる。この態様の本発明の物品供給計画立案装置
において、前記複数の供給先への発注量の分配の調整
を、前記複数の供給元に各々設定される供給可能範囲内
で行なうものとすることもできる。こうすれば、供給元
における供給可能範囲を制約条件として企業経営指標が
最大となるよう発注量を分配することができる。In the article supply planning method according to the present invention, a business management index from the ordering of the article by the ordering party to the delivery of the ordered article is calculated, and the calculated business management index is maximized. The distribution of the order quantity to the plurality of supply destinations may be adjusted so as to draft the supply plan of the articles. In this case, the order quantity is distributed so that the corporate management index is maximized, so that the article supply plan can contribute to the management of the corporate entity. Here, a short-term profit index or a long-term profit index can be used as the corporate management index, and various indexes can be used. In the article supply planning device according to the aspect of the present invention, the distribution of the order amount to the plurality of destinations may be adjusted within the supplyable range set for each of the plurality of sources. . In this way, the order quantity can be distributed so that the corporate management index is maximized with the supply range at the supplier being a constraint.
【0014】[0014]
【発明の実施の形態】次に、本発明の実施の形態を実施
例を用いて説明する。図1は本発明の一実施例である物
品供給計画立案装置20の構成の概略を機能ブロックと
して示す構成図であり、図2は実施例の物品供給計画立
案装置20のハード構成を例示する構成図である。Next, embodiments of the present invention will be described with reference to examples. FIG. 1 is a configuration diagram showing, as functional blocks, an outline of a configuration of an article supply planning device 20 according to an embodiment of the present invention, and FIG. 2 is a configuration illustrating a hardware configuration of the article supply planning device 20 of the embodiment. FIG.
【0015】実施例の物品供給計画立案装置20は、図
2に示すように、ハード構成としては、中央演算処理装
置としてのCPU42を中心とする汎用のコンピュータ
として構成されている。CPU42に接続されたバス4
4には、キャッシュメモリ46やそのキャッシュコント
ローラ48,メインメモリ50,CRT54が接続され
たグラフィックスコントローラ52,キーボード58や
マウス60が接続されたキーボードインタフェース5
6,ハードディスク装置64やフロッピー(登録商標)
ディスク装置66などが接続された入出力インタフェー
ス62などが接続されている。As shown in FIG. 2, the article supply planning device 20 of the embodiment has a hardware configuration as a general-purpose computer centered on a CPU 42 as a central processing unit. Bus 4 connected to CPU 42
Reference numeral 4 denotes a cache memory 46, its cache controller 48, a main memory 50, a graphics controller 52 to which a CRT 54 is connected, and a keyboard interface 5 to which a keyboard 58 and a mouse 60 are connected.
6, Hard disk drive 64 and floppy (registered trademark)
The input / output interface 62 to which the disk device 66 and the like are connected is connected.
【0016】また、実施例の物品供給計画立案装置20
は、図1に示すように、機能ブロックとしては、各供給
元における各種データを記憶するデータ記憶部22と、
発注元の発注工程毎の発注量や制約条件などを入力する
データ入力部24と、各供給元の物品の供給に要する費
用などに基づいて収益指標を演算する指標演算部26
と、供給元の供給可能範囲などの制約条件を満たしてい
るかを判定する制約条件判定部28と、入力された発注
元の発注工程毎の発注量を制約条件を満たしながら収益
指標が最大となるよう各供給元へ分配する発注量分配調
整部30と、発注元の発注工程における物品の発注に対
して納品までに要する時間であるリードタイムだけ発注
工程からズラして供給工程を供給元毎に設定する供給工
程設定部32と、供給工程と時間的に重なる発注工程に
おける各供給元に分配された発注量をリードタイムに基
づいて分配し各供給工程における供給計画量を演算する
供給計画量演算部34と、各発注工程における発注量と
各供給元の供給工程に対して決定された発注量とを一覧
として出力する計画出力部36とを備える。こうした実
施例の物品供給計画立案装置20が備える各機能部は、
前述した図2に例示するハード構成と後述するソフトウ
エアとが一体となって実現されるものである。The article supply planning device 20 of the embodiment is also described.
As shown in FIG. 1, as functional blocks, a data storage unit 22 for storing various data at each supply source;
A data input unit 24 for inputting the order quantity and constraint conditions for each ordering process of the ordering source, and an index calculating unit 26 for calculating the profit index based on the cost required for the supply of the goods of each supplier.
And a constraint condition determination unit 28 that determines whether constraint conditions such as a supplyable range of the supply source are satisfied, and a profit index that is maximized while satisfying the constraint on the input order quantity of each order process of the order source. And an order quantity distribution adjusting unit 30 for distributing the order to each supplier, and the supply process is shifted for each supplier by shifting the order process from the ordering process by a lead time, which is the time required for delivery of the order in the ordering process of the orderer. A supply process setting unit 32 to be set, and a supply plan amount calculation for distributing an order amount distributed to each supply source in an order process overlapping with the supply process in time based on a lead time and calculating a supply plan amount in each supply process. And a plan output unit 36 that outputs a list of the order quantity in each ordering process and the order quantity determined for the supply process of each supplier as a list. Each functional unit included in the article supply planning device 20 of the embodiment includes:
The hardware configuration illustrated in FIG. 2 described above and software described later are integrally realized.
【0017】データ記憶部22には、各供給元の各供給
工程における供給可能範囲を設定する下限値および上限
値や各供給元の物品の供給に伴う費用、例えば物品1個
当たりの材料費や人件費,設備費,在庫保管費などの費
用に関するデータや物品を生産するのに要する時間や保
管時間などの時間に関するデータからなる工程データ、
物品の出荷に伴う輸送費用や輸送時間に関する輸送デー
タ、各供給元の在庫目標としての在庫目標値データ、物
品の販売価格などの販売データなどが記憶されている。The data storage unit 22 stores a lower limit value and an upper limit value for setting a suppliable range in each supply step of each supply source, a cost associated with supply of an article of each supply source, such as a material cost per article, Process data consisting of data on costs such as labor costs, equipment costs, and inventory storage costs, and data on time such as the time required to produce goods and storage time;
It stores transportation data relating to transportation costs and transportation time associated with the shipment of the goods, inventory target value data as stock targets for each supplier, sales data such as the selling price of the goods, and the like.
【0018】指標演算部26は、発注量分配調整部30
から要請されたときに各供給元に分配された発注量に基
づいてデータ記憶部22に記憶された工程データや輸送
データに基づいて収益指標を演算し、要請された発注量
分配調整部30に演算した収益指標を返す。収益指標と
しては、一般的に用いられている総資本利益率(ROA
=(収益−支出)/資産)を用いたり、利益を生み出す
力と利益を生み出すスピードの積として得られる指標
(S−ROA=(売上−生産投入材料費−業務費)/在
庫分材料費)などを定義して用いることもできる。ま
た、この他の収益指標を定義して用いてもよい。制約条
件判定部28は、発注量分配調整部30による発注量の
分配が各供給元に設定された供給可能範囲などの制約条
件を満たしているかを判定する。発注量分配調整部30
は、データ入力部24により入力された発注元の発注工
程毎の発注量の分配を制約条件判定部28の判定に基づ
いて各供給元に設定された制約条件の範囲内で変更し、
指標演算部26により演算される収益指標が最大となる
分配量を決定する。The index calculator 26 includes an order quantity distribution adjuster 30
Calculates a profit index based on the process data and the transport data stored in the data storage unit 22 based on the order quantity distributed to each supplier when requested by the Returns the calculated profit index. As a return index, a commonly used return on total capital (ROA)
= (Revenue-expenditure) / asset) or an index obtained as the product of the power of generating profit and the speed of generating profit (S-ROA = (sales-production input material cost-business cost) / inventory material cost) Etc. can also be defined and used. Further, another profit index may be defined and used. The constraint condition determination unit 28 determines whether the distribution of the order quantity by the order quantity distribution adjustment unit 30 satisfies the constraint conditions such as the suppliable range set for each supply source. Order quantity distribution adjustment unit 30
Changes the distribution of the order quantity for each ordering process of the order source input by the data input unit 24 within the range of the constraint set for each supplier based on the determination of the constraint determining unit 28;
The distribution amount that maximizes the profit index calculated by the index calculation unit 26 is determined.
【0019】供給工程設定部32は、データ記憶部22
に記憶された物品を生産するのに要する時間や保管時間
などの時間に関するデータを含む工程データに基づいて
発注元の発注工程における物品の発注に対して納品まで
に要する時間であるリードタイムを計算し、このリード
タイムだけ供給工程を発注工程からズラして設定する。
供給計画量演算部34は、設定された供給工程と時間的
に重なる発注工程の各供給元に分配された発注量をリー
ドタイムを用いて比例配分して各供給工程に対する発注
量を決定する。The supply step setting section 32 includes a data storage section 22
Calculates lead time, which is the time it takes to deliver an item in the ordering process of the orderer based on the process data including the time required to produce the item and the storage time, etc. Then, the supply process is shifted from the ordering process by this lead time and set.
The supply schedule calculation unit 34 determines the order quantity for each supply step by proportionally using the lead time to distribute the order quantity distributed to each supply source of the order step overlapping the set supply step in time.
【0020】次に、こうして構成された実施例の物品供
給計画立案装置20の動作について説明する。図3は実
施例の物品供給計画立案装置20により実行される供給
計画処理ルーチンの一例を示すフローチャートであり、
図4は発注元Aの発注工程An毎の発注量Xnに対する
二つの供給元B,Cからの物品供給の計画を立案してい
る様子を例示する説明図である。以下、図3の供給計画
処理ルーチンに沿って実施例の物品供給計画立案装置2
0により図4の具体例としての供給計画が立案される様
子について説明する。Next, the operation of the article supply planning device 20 of the embodiment configured as described above will be described. FIG. 3 is a flowchart illustrating an example of a supply planning process routine executed by the article supply planning device 20 according to the embodiment.
FIG. 4 is an explanatory diagram exemplifying a situation in which a plan for supplying articles from the two suppliers B and C to the order quantity Xn for each ordering process An of the ordering party A is made. Hereinafter, the article supply planning device 2 of the embodiment according to the supply plan processing routine of FIG.
A state in which a supply plan as a specific example of FIG.
【0021】供給計画処理ルーチンが実行されると、物
品供給計画立案装置20のCPU42は、まず、キーボ
ード58などのデータ入力部24から発注元Aの発注工
程Anと各発注工程Anの発注量Xnの入力処理を実行
する(ステップS100)。発注元Aの発注工程An
は、例えば月単位や週単位,日単位あるいは3月単位や
年単位などをスパンとして入力される。発注元Aの発注
工程Anと各発注工程Anの発注量Xnとが入力される
と、データ記憶部22に記憶されている物品を生産する
のに要する時間や保管時間などの時間に関するデータを
含む工程データから供給元B,Cの供給工程Bn,Cn
における物品の発注に対して納品までに要する時間とし
てリードタイムt1、t2を計算すると共に(ステップ
S102)、供給元B,Cの供給工程Bn,Cnをリー
ドタイムt1,t2だけ発注工程Anからズラして発注
工程Anと同一のスパンとして設定する(ステップS1
04)。When the supply planning process routine is executed, the CPU 42 of the article supply planning device 20 first inputs the ordering process An of the ordering source A and the order quantity Xn of each ordering process An from the data input unit 24 such as the keyboard 58. Is executed (step S100). Ordering process An of ordering source A
Is input as a span, for example, in units of months, weeks, days, or in units of three months or years. When the ordering process An of the ordering source A and the order quantity Xn of each ordering process An are input, the data including the data relating to the time required to produce the articles stored in the data storage unit 22 and the time such as the storage time are included. Supply process Bn, Cn of supply sources B, C from process data
The lead times t1 and t2 are calculated as the time required until delivery for the order of the goods in (1) (step S102), and the supply processes Bn and Cn of the supply sources B and C are shifted from the ordering process An by the lead times t1 and t2. To set the same span as that of the ordering process An (step S1).
04).
【0022】次に、各発注工程Anに設定された分配比
αnの初期値を用いて発注量Xnを供給元B,Cに初期
分配する(ステップS106)。ここで、分配比αnの
初期値として如何なる値を用いてもよい。Next, the order quantity Xn is initially distributed to the supply sources B and C using the initial value of the distribution ratio αn set in each ordering process An (step S106). Here, any value may be used as the initial value of the distribution ratio αn.
【0023】続いて、分配された発注量を同時刻の発注
工程Anからのリードタイムt1,t2による比例配分
として式(1)および式(2)により各供給工程Bn,
Cnの供給計画量Yn,Znとして計算すると共に(ス
テップS108)、計算された供給計画量Yn,Znに
基づいて収益指標を計算する(ステップS110)。Subsequently, the distributed order quantity is set as a proportional distribution based on the lead times t1 and t2 from the ordering process An at the same time, and the respective supply processes Bn,
The calculation is performed as the planned supply amounts Yn, Zn of Cn (step S108), and the profit index is calculated based on the calculated planned supply amounts Yn, Zn (step S110).
【0024】[0024]
【数1】 (Equation 1)
【0025】そして、分配比αnを制約条件の範囲内で
所定量だけ変更して(ステップS112)、変更が終了
するまで(ステップS114)、ステップS108〜S
112の処理、即ち、変更された分配比αnを用いて供
給計画量Yn,Znを計算すると共に収益指標を計算す
る処理を繰り返す。Then, the distribution ratio αn is changed by a predetermined amount within the range of the constraint condition (step S112). Until the change is completed (step S114), steps S108 to S108 are executed.
The process of 112, that is, the process of calculating the planned supply amounts Yn, Zn and the profit index using the changed distribution ratio αn is repeated.
【0026】分配比αnの変更が終了したら、計算した
収益指標が最大となる分配比αnとその際の供給計画量
Yn,Znを計画値として出力して(ステップS11
6)、本ルーチンを終了する。When the change of the distribution ratio αn is completed, the distribution ratio αn at which the calculated profit index is maximized and the planned supply amounts Yn and Zn at that time are output as plan values (step S11).
6), end this routine.
【0027】以上説明した実施例の物品供給計画立案装
置20によれば、供給元B,Cの受注から納品までに要
する時間であるリードタイムを考慮してより適切な物品
供給計画を立案することができる。また、供給可能範囲
などの制約条件の範囲内で分配比αnを変更して収益指
標が最大となる分配比αnを求め、求めた分配比αnに
基づいて供給元B,Cにおける各供給工程Bn,Cnの
供給計画量Yn,Znを計算するから、企業体の収益が
より大きくなるよう物品供給計画を立案することができ
る。According to the article supply planning device 20 of the embodiment described above, a more appropriate article supply plan is created in consideration of the lead time, which is the time required from the order receipt and delivery of the supply sources B and C. Can be. Further, the distribution ratio αn is changed within the range of the constrained conditions such as the supply possible range to obtain the distribution ratio αn that maximizes the profit index, and based on the obtained distribution ratio αn, each supply process Bn in the supply sources B and C is performed. , Cn, the supply plan amounts Yn and Zn are calculated, so that an article supply plan can be made so that the profit of the business entity is further increased.
【0028】実施例の物品供給計画立案装置20では、
一つの発注元Aからの発注に対して二つの供給元B,C
から供給するものとして説明したが、複数の発注元から
の発注に対して二つまたは三つ以上の供給元から供給す
るものとしてもよい。この場合、各供給元のリードタイ
ムを各発注元の発注に対して各々設定するものとしても
よいし、各供給元のリードタイムを固定したものとして
もよい。In the article supply planning device 20 of the embodiment,
Two suppliers B and C for an order from one supplier A
Although the description has been made on the assumption that the order is supplied from two or more order sources, the order may be supplied from two or three or more sources. In this case, the lead time of each supply source may be set for each order of each order source, or the lead time of each supply source may be fixed.
【0029】実施例の物品供給計画立案装置20では、
収益指標が最大となる分配比αnとその際の供給計画量
Yn,Znを計画値としたが、収益指標に無関係に分配
するものとしてかまわない。In the article supply planning device 20 of the embodiment,
Although the distribution ratio αn at which the profit index is maximized and the planned supply amounts Yn, Zn at that time are set as plan values, they may be distributed regardless of the profit index.
【0030】実施例では、本発明の実施の形態の一つと
して物品供給計画立案装置20を用いて説明したが、図
3に例示する供給計画処理ルーチンと同様な計画立案手
法を用いるものであれば如何なる手法を用いるものとし
てもよく、また、コンピュータを実施例の物品供給計画
立案装置20やその変形例の物品供給計画立案装置とし
て機能させるコンピュータ読み取り可能なプログラムと
してもよい。もとより、こうしたプログラムを記憶した
CD−ROMやDVDーROMなどの記憶媒体としても
かまわない。Although the embodiment has been described using the article supply planning device 20 as one embodiment of the present invention, any method using the same planning method as the supply planning processing routine illustrated in FIG. 3 may be used. Any method may be used, or a computer-readable program that causes a computer to function as the article supply planning device 20 of the embodiment or the article supply planning device of a modification thereof. Of course, a storage medium such as a CD-ROM or a DVD-ROM in which such a program is stored may be used.
【0031】以上、本発明の実施の形態について実施例
を用いて説明したが、本発明はこうした実施例に何等限
定されるものではなく、本発明の要旨を逸脱しない範囲
内において、種々なる形態で実施し得ることは勿論であ
る。The embodiments of the present invention have been described with reference to the embodiments. However, the present invention is not limited to these embodiments, and various embodiments may be made without departing from the scope of the present invention. Of course, it can be carried out.
【図1】 本発明の一実施例である物品供給計画立案装
置20の構成の概略を機能ブロックとして示す構成図で
ある。FIG. 1 is a configuration diagram showing an outline of a configuration of an article supply planning device 20 according to an embodiment of the present invention as functional blocks.
【図2】 実施例の物品供給計画立案装置20のハード
構成を例示する構成図である。FIG. 2 is a configuration diagram illustrating a hardware configuration of the article supply planning device 20 according to the embodiment;
【図3】 実施例の物品供給計画立案装置20により実
行される供給計画処理ルーチンの一例を示すフローチャ
ートである。FIG. 3 is a flowchart illustrating an example of a supply planning process routine executed by the article supply planning device 20 according to the embodiment.
【図4】 発注元Aの発注工程毎の発注量Xnに対して
二つの供給元B,Cの物品供給計画を立案している様子
を例示する説明図である。FIG. 4 is an explanatory diagram exemplifying a state in which an article supply plan of two supply sources B and C is made with respect to an order quantity Xn for each ordering process of an order source A;
20 物品供給計画立案装置、22 データ記憶部、2
4 データ入力部、26 指標演算部、28 制約条件
判定部、30 発注量分配調整部、32 供給工程設定
部、34 供給計画量演算部、36 計画出力部、42
CPU、44バス、46 キャッシュメモリ、48
キャッシュコントローラ、50 メインメモリ、52
グラフィックスコントローラ、54 CRT、56 キ
ーボードインタフェース、58 キーボード、60 マ
ウス、62 入出力インタフェース、64 ハードディ
スク装置、66 フロッピーディスク装置。20 goods supply planning device, 22 data storage unit, 2
4 data input section, 26 index calculation section, 28 constraint condition determination section, 30 order quantity distribution adjustment section, 32 supply process setting section, 34 supply plan quantity calculation section, 36 plan output section, 42
CPU, 44 bus, 46 cache memory, 48
Cache controller, 50 main memory, 52
Graphics controller, 54 CRT, 56 keyboard interface, 58 keyboard, 60 mouse, 62 input / output interface, 64 hard disk drive, 66 floppy disk drive.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 小島 英嗣 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 鈴木 浩佳 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 音窪 健太郎 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 Fターム(参考) 5B049 BB07 CC05 CC21 CC27 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Eiji Kojima 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Corporation (72) Inventor Hiroyoshi Suzuki 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Corporation (72) Inventor Kentaro Okubo 1st Toyota Town, Toyota City, Aichi Prefecture Toyota Motor Corporation F term (reference) 5B049 BB07 CC05 CC21 CC27
Claims (7)
供給元からの物品の供給の計画を立案する物品供給計画
立案装置であって、 前記発注元からの物品の発注量を前記複数の供給元に分
配する発注量分配手段と、 前記複数の供給元の物品の受注に対して納品までに要す
る時間であるリードタイムだけ前記発注元の発注工程か
らズラして該発注工程に対応する供給工程を供給元毎に
設定する供給工程設定手段と、 該設定された供給工程と時間的に重なる発注工程におけ
る該供給工程が設定された供給元に対して前記発注量分
配手段により分配された発注量を前記リードタイムに基
づいて分配し、該供給工程の供給計画量を設定する供給
計画量設定手段とを備える物品供給計画立案装置。1. An article supply planning device for planning an article supply from a plurality of suppliers in response to an article order from an orderer, the article supply planning apparatus comprising: Order amount distributing means for distributing the order, and a supply process corresponding to the order process by shifting from the order process of the order source by a lead time which is a time required until delivery for the order of the plurality of sources. Supply step setting means for setting, for each supply source, an order quantity distributed by the order quantity distribution means to a supply source in which the supply step is set in an order step overlapping with the set supply step in time. And a supply planning amount setting means for setting a supply planning amount in the supply step.
あって、 前記発注元からの物品の発注から該発注した物品が納入
されるまでの企業経営指標を演算する経済指標演算手段
と、 該演算された企業経営指標が最大となるよう前記発注量
分配手段による発注量の分配を調整する発注量分配調整
手段とを備える物品供給計画立案装置。2. An article supply planning device according to claim 1, wherein: an economic index calculating means for calculating a business management index from ordering of the article from the order source to delivery of the ordered article; An article supply planning device comprising: an order quantity distribution adjusting means for adjusting the order quantity distribution by the order quantity distributing means so that the calculated corporate management index is maximized.
供給元に各々設定される供給可能範囲内で前記発注量分
配手段による発注量の分配を調整する手段である請求項
2記載の物品供給計画立案装置。3. The article according to claim 2, wherein the order quantity distribution adjusting means adjusts the distribution of the order quantity by the order quantity distribution means within a suppliable range set for each of the plurality of supply sources. Supply planning equipment.
れか記載の物品供給計画立案装置として機能させるコン
ピュータ読み取り可能なプログラム。4. A computer-readable program for causing a computer to function as the article supply planning device according to claim 1.
供給元からの物品の供給の計画を立案する物品供給計画
立案方法であって、 前記発注元からの物品の発注量を前記複数の供給元に分
配し、 前記複数の供給元の物品の受注に対して納品までに要す
る時間であるリードタイムだけ前記発注元の発注工程か
らズラして該発注工程に対応する供給工程を供給元毎に
設定し、 該設定された供給工程と時間的に重なる発注工程におけ
る該供給工程が設定された供給元に対して前記分配され
た発注量を前記リードタイムに基づいて分配し、該供給
工程の供給計画量を設定して物品の供給計画を立案する
物品供給計画立案方法。5. An article supply planning method for planning an article supply from a plurality of suppliers in response to an article order from an order source, the method comprising: And a supply process corresponding to the ordering process is shifted for each supply source from the ordering process of the ordering source by a lead time that is a time required for delivery of the order of the plurality of suppliers for the order. Setting, distributing, based on the lead time, the distributed order quantity to the supply source for which the supply step is set in an order step overlapping with the set supply step in time, and supplying the supply step. An article supply plan drafting method for drafting an article supply plan by setting a planned amount.
した物品が納入されるまでの企業経営指標を演算し、該
演算された企業経営指標が最大となるよう前記複数の供
給先への発注量の分配を調整して物品の供給計画を立案
する請求項5記載の物品供給計画立案方法。6. An enterprise management index from the ordering of the goods from the ordering source to the delivery of the ordered goods is calculated, and the calculated business management index is transmitted to the plurality of supply destinations so that the calculated business management index is maximized. 6. The article supply planning method according to claim 5, wherein the article supply plan is created by adjusting the distribution of the order quantity.
整を、前記複数の供給元に各々設定される供給可能範囲
内で行なう請求項6記載の物品供給計画立案方法。7. The article supply planning method according to claim 6, wherein the adjustment of the distribution of the order quantity to the plurality of supply destinations is performed within a supplyable range set for each of the plurality of supply sources.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000262311A JP2002073750A (en) | 2000-08-31 | 2000-08-31 | Article supply planning device, article supply planning method, and article supply planning program |
| EP00126799A EP1107147A3 (en) | 1999-12-06 | 2000-12-06 | Demand-production scheme planning apparatus and storage medium |
| US09/729,800 US7668743B2 (en) | 1999-12-06 | 2000-12-06 | Demand-production scheme planning apparatus, and storage medium |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000262311A JP2002073750A (en) | 2000-08-31 | 2000-08-31 | Article supply planning device, article supply planning method, and article supply planning program |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2002073750A true JP2002073750A (en) | 2002-03-12 |
Family
ID=18750008
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000262311A Pending JP2002073750A (en) | 1999-12-06 | 2000-08-31 | Article supply planning device, article supply planning method, and article supply planning program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2002073750A (en) |
-
2000
- 2000-08-31 JP JP2000262311A patent/JP2002073750A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Wang et al. | Approach of just-in-time distribution requirements planning for supply chain management | |
| US8543473B2 (en) | Business partner collaboration and buy analysis | |
| Tiwari et al. | Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost | |
| Hsu et al. | Optimal ordering decision for deteriorating items with expiration date and uncertain lead time | |
| EA010284B1 (en) | Commercial information and analytical system | |
| JP2011145960A (en) | Apparatus and program for managing proportional distribution of commodity | |
| Çapar | Joint shipment consolidation and inventory decisions in a two-stage distribution system | |
| Hill et al. | A two-echelon inventory model with lost sales | |
| US20020077914A1 (en) | System and method for automatically controlling inventory | |
| Aghazadeh | MRP contributes to a company's profitability | |
| Yu et al. | How much does VMI better than RMI in a global environment? | |
| CN107679815A (en) | Supplier inventory management system | |
| AU2011242145A1 (en) | Method and Apparatus for Dynamic Online Pricing | |
| CN113837685A (en) | Warehouse-out interception method, warehouse logistics system, order system and readable storage medium | |
| Segerstedt | Master production scheduling and a comparison of material requirements planning and cover-time planning | |
| Godichaud et al. | EOQ models with stockouts for disassembly systems | |
| JP2004295257A (en) | Order proposal method, computer-readable program, and computer-readable medium via computer network | |
| JP7063781B2 (en) | Parallel distributed processing control system, program, and parallel distributed processing control method | |
| DAYANTI et al. | Implementation of distribution requirement planning in the subsidized fertilizer management system | |
| JP2015135567A (en) | Program, evaluation information generation method, and evaluation information generation system | |
| JP2002073750A (en) | Article supply planning device, article supply planning method, and article supply planning program | |
| JP2003316862A (en) | Inventory planning method | |
| JP2001225927A (en) | Demand / supply planning apparatus, demand / supply planning method, demand / supply planning program, and recording medium recording the program | |
| JP6713963B2 (en) | Method and apparatus for generating initial inventory information for supply chain operation simulation | |
| Li et al. | The dual implementation of lean and ERP in manufacturing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040427 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040624 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20040624 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20040831 |