JP2003129495A - Jig and method for installing precast foundation - Google Patents
Jig and method for installing precast foundationInfo
- Publication number
- JP2003129495A JP2003129495A JP2001329818A JP2001329818A JP2003129495A JP 2003129495 A JP2003129495 A JP 2003129495A JP 2001329818 A JP2001329818 A JP 2001329818A JP 2001329818 A JP2001329818 A JP 2001329818A JP 2003129495 A JP2003129495 A JP 2003129495A
- Authority
- JP
- Japan
- Prior art keywords
- precast foundation
- precast
- foundation
- installation jig
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 claims abstract description 45
- 238000003780 insertion Methods 0.000 claims abstract description 13
- 230000037431 insertion Effects 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241001570513 Potamogeton diversifolius Species 0.000 description 1
- 101001062854 Rattus norvegicus Fatty acid-binding protein 5 Proteins 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、プレキャスト基礎の
据付治具及び据付方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast foundation installation jig and installation method.
【0002】[0002]
【従来の技術】建物の基礎を施工する方法として、予め
工場にて偏平な略立方体形状を成すプレキャスト基礎を
作製しておき、これを現場に搬送し、一つ一つクレーン
で吊り上げ、所定の配置に並べ置いて互いに連結し、こ
の連結部位等に現場でコンクリートを打設していく方法
が知られている。2. Description of the Related Art As a method of constructing a building foundation, a precast foundation having a flat and substantially cubic shape is prepared in advance in a factory, which is then transported to the site and hoisted by a crane one by one to a predetermined A method is known in which they are placed side by side in an arrangement and are connected to each other, and concrete is poured at the connection site or the like on site.
【0003】図5プレキャスト基礎50をワイヤー51
によって吊り上げ、既に据え付けているプレキャスト基
礎50の隣に据え付けようとしている様子を示してい
る。プレキャスト基礎50の上面には、アンカーボルト
50aが突出しているので、これにアイナット52を装
着し、このアイナット52のリング部に前記ワイヤー5
1の先端部(フック等)を引っかけることで吊り上げを
行っている。FIG. 5 Precast foundation 50 with wire 51
It is shown that it is being hung up by and is being installed next to the precast foundation 50 that has already been installed. Since the anchor bolt 50a projects from the upper surface of the precast foundation 50, an eye nut 52 is attached to the anchor bolt 50a, and the wire 5 is attached to the ring portion of the eye nut 52.
It is lifted by hooking the tip (hook, etc.) of 1.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、クレー
ンにて吊り上げたプレキャスト基礎50を既に据え付け
たプレキャスト基礎50の隣に据え付けるときに、作業
者による補助を得たとしてもプレキャスト基礎50を正
確に置くことは困難である。通常は、プレキャスト基礎
50を置いた後に、バール等を用いてプレキャスト基礎
50を動かし、予め張ってある水糸に合わせて通りを出
す作業を行うことになる。However, when the precast foundation 50 hoisted by the crane is installed next to the precast foundation 50 which has already been installed, the precast foundation 50 must be placed accurately even if the operator assists the precast foundation 50. It is difficult. Usually, after placing the precast foundation 50, the precast foundation 50 is moved by using a burl or the like, and the work is carried out according to the pre-stretched water thread.
【0005】この発明は、上記の事情に鑑み、プレキャ
スト基礎の通りを容易に出すことができる据付治具及び
プレキャスト基礎の据付方法を提供する。In view of the above circumstances, the present invention provides an installation jig and a method for installing a precast foundation that can easily take out the street of the precast foundation.
【0006】[0006]
【課題を解決するための手段】この発明のプレキャスト
基礎の据付治具は、上記の課題を解決するために、プレ
キャスト基礎の厚みよりも広い幅を有した断面略コ字形
状を成し、隣接配置されるプレキャスト基礎に跨がる長
さを有し、プレキャスト基礎の上面に突出するアンカー
ボルトを挿通させる挿通部と前記プレキャスト基礎の側
面を押すことができるようにねじが装着されるねじ穴部
とを両端側に各々備えたことを特徴としている。この据
付治具では、後述する据付方法における通りを出す際
に、断面略コ字形状における一方の垂直片部を基準面と
し、これにプレキャスト基礎の側面を当接(圧接)させ
ることになる。In order to solve the above-mentioned problems, the precast foundation installation jig of the present invention has a substantially U-shaped cross section having a width wider than the thickness of the precast foundation and is adjacent to each other. An insertion portion having a length that straddles the precast foundation to be arranged, and an insertion portion for inserting an anchor bolt projecting on the upper surface of the precast foundation and a screw hole portion to which a screw is attached so that the side surface of the precast foundation can be pushed. It is characterized by having and on both ends. In this installation jig, one vertical piece having a substantially U-shaped cross section is used as a reference surface, and the side surface of the precast foundation is brought into contact (pressure contact) with the vertical piece when the passage in the installation method described later is taken out.
【0007】そして、この発明のプレキャスト基礎の据
付方法は、既に据え付けたプレキャスト基礎に隣接させ
て次のプレキャスト基礎を据え付けるときに、前記据付
治具を両プレキャスト基礎を跨ぐように配置し、前記挿
通部にアンカーボルトを挿通させ、ねじ穴部に装着した
ねじによってプレキャスト基礎の側面を押して通りを出
すことを特徴とする。According to the method for installing a precast foundation of the present invention, when the next precast foundation is installed adjacent to the already installed precast foundation, the installation jig is arranged so as to straddle both precast foundations, and the insertion is performed. It is characterized in that an anchor bolt is inserted through the part and the side face of the precast foundation is pushed out by the screw attached to the screw hole part so as to pass through.
【0008】プレキャスト基礎を吊り上げる際に当該プ
レキャスト基礎に前記据付治具を装着してもよい。ま
た、据え付けようとするプレキャスト基礎の吊り上げ状
態を保持して既に据え付けたプレキャスト基礎の側面を
ねじにて押すのがよい。When the precast foundation is hoisted, the installation jig may be mounted on the precast foundation. Further, it is preferable to hold the suspended state of the precast foundation to be installed and push the side surface of the precast foundation already installed with a screw.
【0009】また、前記プレキャスト基礎の据付治具に
おいて、中央部に開口が形成されている構成であれば、
この開口を介してこの連結部位へのコンクリート充填を
行うことができる。Further, in the installation jig for the precast foundation, if the opening is formed in the central portion,
Through this opening, it is possible to fill the connection site with concrete.
【0010】[0010]
【発明の実施の形態】以下、この発明の実施形態のプレ
キャスト基礎の据付治具及び据付方法を図1乃至図3に
基づいて説明していく。BEST MODE FOR CARRYING OUT THE INVENTION An installation jig and installation method for a precast foundation according to an embodiment of the present invention will be described below with reference to FIGS.
【0011】図1はプレキャスト基礎1の斜視図であ
る。このプレキャスト基礎1は偏平な略立方体形状を成
しており、その上端面からは、家屋の土台固定用のアン
カーボルト12が突出している。そして、このプレキャ
スト基礎1の下部側の両端近傍部位には短辺方向に貫通
穴11・11が形成されている。FIG. 1 is a perspective view of a precast foundation 1. The precast foundation 1 has a flat and substantially cubic shape, and an anchor bolt 12 for fixing a base of a house projects from an upper end surface of the precast foundation 1. Then, through holes 11 are formed in the vicinity of both ends on the lower side of the precast foundation 1 in the short side direction.
【0012】図2はプレキャスト基礎1の据付治具2を
示した斜視図である。この据付治具2は、プレキャスト
基礎1の厚み(短辺方向長さ)よりも広い幅を有した断
面略コ字形状を成し、隣接配置されるプレキャスト基礎
1・1に跨がる長さを有した鋼製の治具である。そし
て、この据付治具2の両端側であって、断面略コ字形状
における上面部(水平面部)にはプレキャスト基礎1の
上面から突出するアンカーボルト12を挿通させる挿通
部21が形成されており、断面略コ字形状における垂直
片部の一方(図において手前側)には前記プレキャスト
基礎1を押すことができるようにねじ22が装着される
ねじ穴部23が形成されている。断面略コ字形状におけ
る垂直片部の他方は前記プレキャスト基礎1の通りをだ
す際の基準面となる。また、この実施形態においては、
据付治具2の中央部には開口24が形成されている。据
付治具2は1枚の鋼板の折り曲げ加工及び打ち抜き(或
いはガスバーナーによる切断)により作製してもよいし
(図2及び図3(a)参照)、断面略コ字形状における
上面部(水平面部)を成す平板部材と、垂直片部を成す
断面L字状の部材とを用い、これらを溶接等により固着
して作製してもよいものである(図3(b)及び図4参
照)。FIG. 2 is a perspective view showing the installation jig 2 of the precast foundation 1. This installation jig 2 has a substantially U-shaped cross section having a width wider than the thickness (length in the short side direction) of the precast foundation 1, and the length over which the precast foundations 1 and 1 are arranged adjacent to each other. It is a jig made of steel having. Then, on both end sides of the installation jig 2 and on the upper surface portion (horizontal surface portion) having a substantially U-shaped cross section, insertion portions 21 for inserting the anchor bolts 12 projecting from the upper surface of the precast foundation 1 are formed. A screw hole portion 23 into which a screw 22 is attached so that the precast foundation 1 can be pushed is formed on one side (on the front side in the drawing) of the vertical piece having a substantially U-shaped cross section. The other of the vertical pieces in the substantially U-shaped cross section serves as a reference surface when the precast foundation 1 is set out. Also, in this embodiment,
An opening 24 is formed in the center of the installation jig 2. The installation jig 2 may be manufactured by bending and punching a single steel plate (or cutting with a gas burner) (see FIGS. 2 and 3 (a)), and the upper surface (horizontal) in a substantially U-shaped cross section. It may be manufactured by using a flat plate member that forms a surface portion) and a member having an L-shaped cross section that forms a vertical piece portion and fixing these members by welding or the like (see FIGS. 3B and 4). .
【0013】図3(a)はプレキャスト基礎1(1A)
の吊り上げ状態の斜視図であり、同図(b)は、既に据
え付けたプレキャスト基礎1(1B)の隣に次に据え付
けるプレキャスト基礎1Aを近づけている状態を示した
斜視図である。この吊り上げ作業を行うときには、ま
ず、プレキャスト基礎1の貫通穴11・11に棒状の両
切りボルト(図示せず)をそれぞれ差し込み、これら両
切りボルトの両端にアイナット14を装着し、各アイナ
ット14にワイヤー(4本)16の先端に設けたフック
15を係合させる。この実施形態では、この吊り上げを
行うときに、プレキャスト基礎1Aに据付治具2を取り
付けている。この取り付けは、据付治具2の挿通部21
にアンカーボルト12を挿通させ、ねじ穴部23にねじ
22を装着することにより行う。このように据付治具2
をプレキャスト基礎1Aに取り付けた状態では、断面略
コ字形状をなす据付治具2の垂直片部(ねじ穴部23を
形成していない側)がプレキャスト基礎1Aの側面に圧
接し、また、据付治具2はプレキャスト基礎1Aの上角
部から突出するかたちとなる。FIG. 3A shows a precast foundation 1 (1A).
2B is a perspective view showing a state in which the precast foundation 1A to be installed next is brought close to the precast foundation 1 (1B) already installed. When performing this hoisting work, first, rod-shaped double-cut bolts (not shown) are inserted into the through holes 11 of the precast foundation 1, and eye nuts 14 are attached to both ends of these double-cut bolts. 4) 16 is engaged with the hook 15 provided at the tip. In this embodiment, the installation jig 2 is attached to the precast foundation 1A when performing this lifting. This attachment is performed by the insertion portion 21 of the installation jig 2.
The anchor bolt 12 is inserted into the screw hole 23 and the screw 22 is attached to the screw hole 23. In this way, the installation jig 2
In the state in which the pre-cast foundation 1A is attached, the vertical piece (the side where the screw hole 23 is not formed) of the installation jig 2 having a substantially U-shaped cross section is pressed against the side surface of the pre-cast foundation 1A, and the installation is performed. The jig 2 projects from the upper corner of the precast foundation 1A.
【0014】そして、図4(a)に示すように、据付治
具2におけるプレキャスト基礎1Aの上角部から突出す
る部分が既に据え付けたプレキャスト基礎1Bに嵌まる
ように、次に据え付けるプレキャスト基礎1Aを地面上
に置く。このとき、既に据え付けたプレキャスト基礎1
Bのアンカーボルト12を、据付治具2における他方側
の挿通部21に挿通させる。このように、据付治具2が
既に据え付けたプレキャスト基礎1Bに嵌まることで、
既に据え付けたプレキャスト基礎1Bに対して略規定の
位置にプレキャスト基礎1Aが置かれることになる。Then, as shown in FIG. 4 (a), the precast foundation 1A to be installed next so that the portion of the installation jig 2 protruding from the upper corner of the precast foundation 1A fits into the already installed precast foundation 1B. On the ground. At this time, the precast foundation 1 already installed
The anchor bolt 12 of B is inserted into the insertion portion 21 on the other side of the installation jig 2. In this way, by fitting the installation jig 2 to the precast foundation 1B already installed,
The precast foundation 1A will be placed at a substantially defined position with respect to the precast foundation 1B already installed.
【0015】そして、既に据え付けたプレキャスト基礎
1Bの側のねじ穴部23にもねじ22を装着し、このね
じ22にてプレキャスト基礎1Bの側面を押し、反対側
の側面を据付治具2の他方側の垂直片部に圧接する(こ
のとき、プレキャスト基礎1Aにおいて移動が生じ
る)。これにより、両プレキャスト基礎1A・1Bは共
に据付治具2の他方側の垂直片部に圧接して並ぶことに
なり、通りがでることになる(なお、挿通部21にアン
カーボルトが当たらないように、挿通部21は大きめに
しておけばよい)。ここで、プレキャスト基礎1Aを地
面上に完全に置くのではなく、当該プレキャスト基礎1
Aの吊り上げ状態を保っておくことにより、ねじ22に
てプレキャスト基礎1Bの側面を押してプレキャスト基
礎1Aの移動を行わせることが容易に行えることにな
る。Then, a screw 22 is also attached to the screw hole portion 23 on the side of the precast foundation 1B that has already been installed, the side surface of the precast foundation 1B is pushed by this screw 22, and the side surface on the opposite side is the other side of the installation jig 2. The vertical piece on the side is pressed (at this time, movement occurs in the precast foundation 1A). As a result, both of the precast foundations 1A and 1B are pressed against and aligned with the vertical piece on the other side of the installation jig 2 so that they can pass through (note that the anchor bolt does not hit the insertion portion 21). In addition, the insertion portion 21 may be made larger). Here, instead of completely placing the precast foundation 1A on the ground, the precast foundation 1
By keeping the suspended state of A, it becomes possible to easily move the precast foundation 1A by pushing the side surface of the precast foundation 1B with the screw 22.
【0016】両プレキャスト基礎1A・1Bは、その通
り方向に直交する側面から図示しない骨材が突出してお
り、これら骨材は互いにボルト等によって連結される。
この連結部分にはコンクリートが打設されるが、据付治
具2には中央部に開口24が形成されているので、この
コンクリート充填を円滑に行うことができる。また、基
礎全体として逆T字状を成すようにプレキャスト基礎1
の下部周辺にもコンクリートが打設される。Both precast foundations 1A and 1B have aggregates (not shown) protruding from the side faces orthogonal to the passing direction, and these aggregates are connected to each other by bolts or the like.
Concrete is poured into this connecting portion, but since the installation jig 2 has the opening 24 formed in the central portion, this concrete filling can be performed smoothly. Also, precast foundation 1 so that the entire foundation has an inverted T shape.
Concrete is also placed around the lower part of the.
【0017】なお、上記の例では、プレキャスト基礎1
に形成されている貫通穴11を利用して吊り上げること
としたが、このような貫通穴11を有しないプレキャス
ト基礎1に対しては、アンカーボルト12にアイナット
を装着して吊り上げるようにしてもよい。ただし、上記
貫通穴11を用いて吊り上げる方が、吊り上げ時のプレ
キャスト基礎1の傾きや揺れを小さくすることができ、
据付治具2を既に据え付けたプレキャスト基礎1Bには
め込む作業がやりやすくなる。In the above example, the precast foundation 1
Although it was decided to hang up using the through hole 11 formed in the above, for the precast foundation 1 that does not have such a through hole 11, an eye nut may be attached to the anchor bolt 12 to hang up. . However, it is possible to reduce the inclination and swing of the precast foundation 1 during the lifting by using the through hole 11 to lift the precast foundation 1.
The work of fitting the installation jig 2 into the precast foundation 1B already installed becomes easy.
【0018】[0018]
【発明の効果】以上説明したように、この発明によれ
ば、据付治具を用いることで、既に据え付けたプレキャ
スト基礎に対して略規定の位置に次に据え付けるプレキ
ャスト基礎を置くことができ、既に据え付けたプレキャ
スト基礎の側に位置する据付治具のねじ穴部にねじを装
着してねじ込むことで、両プレキャスト基礎は共に断面
略コ字形状をなす据付治具の垂直片部に圧接して並ぶこ
とになり、通りを容易に出すことができるという効果を
奏する。As described above, according to the present invention, by using the installation jig, it is possible to place the precast foundation to be installed next in a substantially prescribed position with respect to the precast foundation that has already been installed. By mounting and screwing the screws into the screw holes of the installation jig located on the side of the installed precast foundation, both precast foundations are lined up in pressure contact with the vertical piece of the installation jig that has a substantially U-shaped cross section. This brings about the effect that the street can be easily put out.
【図1】プレキャスト基礎の斜視図である。FIG. 1 is a perspective view of a precast foundation.
【図2】この発明の実施形態の据付治具の斜視図であ
る。FIG. 2 is a perspective view of an installation jig according to the embodiment of the present invention.
【図3】この発明の実施形態を示す図であって、同図
(a)はプレキャスト基礎の吊り上げ状態の斜視図であ
り、同図(b)は吊り上げ状態のプレキャスト基礎を既
に据え付けたプレキャスト基礎に近づけた状態の斜視図
である。FIG. 3 is a diagram showing an embodiment of the present invention, in which FIG. 3A is a perspective view of a precast foundation in a hoisting state, and FIG. 3B is a precast foundation on which a precast foundation in a hoisting state has already been installed. It is a perspective view of the state brought close to.
【図4】この発明の実施形態を示す図であって、隣接す
るプレキャスト基礎同士の通りを出す作業を示した説明
図である。FIG. 4 is a view showing the embodiment of the present invention, and an explanatory view showing a work of passing the precast foundations adjacent to each other.
【図5】従来のプレキャスト基礎の据付方法を示した斜
視図である。FIG. 5 is a perspective view showing a conventional precast foundation installation method.
1 プレキャスト基礎 2 据付治具 12 アンカーボルト 16 ワイヤー 21 挿通部 22 ねじ 23 ねじ穴部 24 開口 1 Precast foundation 2 Installation jig 12 Anchor bolt 16 wires 21 insertion part 22 screws 23 Screw hole 24 openings
───────────────────────────────────────────────────── フロントページの続き (72)発明者 鈴木 雅晶 奈良県奈良市左京6丁目6番地2 株式会 社大和総合技術研究所内 Fターム(参考) 2D046 BA26 BA27 2E174 AA03 BA02 CA03 DA11 DA21 DA33 DA57 DA58 ─────────────────────────────────────────────────── ─── Continued front page (72) Inventor Masaaki Suzuki 6-6 Sakyo, Nara City, Nara Stock Association 2 Inside Yamato Research Institute F-term (reference) 2D046 BA26 BA27 2E174 AA03 BA02 CA03 DA11 DA21 DA33 DA57 DA58
Claims (5)
有した断面略コ字形状を成し、隣接配置されるプレキャ
スト基礎に跨がる長さを有し、プレキャスト基礎の上面
に突出するアンカーボルトを挿通させる挿通部と前記プ
レキャスト基礎の側面を押すことができるようにねじが
装着されるねじ穴部とを両端側に各々備えたことを特徴
とするプレキャスト基礎の据付治具。1. An anchor bolt that has a substantially U-shaped cross section having a width wider than the thickness of the precast foundation, has a length that straddles the adjacent precast foundation, and projects onto the upper surface of the precast foundation. An installation jig for a precast foundation, comprising: an insertion part for inserting a precast foundation and a threaded hole into which a screw is attached so that a side surface of the precast foundation can be pushed.
付治具において、中央部に開口が形成されていることを
特徴とするプレキャスト基礎の据付治具。2. The precast foundation installation jig according to claim 1, wherein an opening is formed in a central portion of the precast foundation installation jig.
させて次のプレキャスト基礎を据え付けるときに、請求
項1又は請求項2に記載の据付治具を両プレキャスト基
礎を跨ぐように配置し、前記挿通部にアンカーボルトを
挿通させ、ねじ穴部に装着したねじによってプレキャス
ト基礎の側面を押して通りを出すことを特徴とするプレ
キャスト基礎の据付方法。3. When the next precast foundation is installed adjacent to the already installed precast foundation, the installation jig according to claim 1 or 2 is arranged so as to straddle both precast foundations, and the insertion part An installation method of a precast foundation, characterized in that an anchor bolt is inserted through and the side surface of the precast foundation is pushed out by a screw attached to a screw hole portion to allow passage.
付方法において、プレキャスト基礎を吊り上げる際に当
該プレキャスト基礎に前記据付治具を装着しておくこと
を特徴とするプレキャスト基礎の据付方法。4. The precast foundation installation method according to claim 3, wherein the installation jig is mounted on the precast foundation when the precast foundation is lifted.
スト基礎の据付方法において、据え付けようとするプレ
キャスト基礎の吊り上げ状態を保持して既に据え付けた
プレキャスト基礎の側面をねじにて押すことを特徴とす
るプレキャスト基礎の据付方法。5. The method for installing a precast foundation according to claim 3 or 4, wherein the precast foundation to be installed is held in a suspended state and a side surface of the precast foundation already installed is pushed by a screw. How to install the precast foundation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001329818A JP3779907B2 (en) | 2001-10-26 | 2001-10-26 | Precast foundation installation jig and installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001329818A JP3779907B2 (en) | 2001-10-26 | 2001-10-26 | Precast foundation installation jig and installation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003129495A true JP2003129495A (en) | 2003-05-08 |
| JP3779907B2 JP3779907B2 (en) | 2006-05-31 |
Family
ID=19145650
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001329818A Expired - Fee Related JP3779907B2 (en) | 2001-10-26 | 2001-10-26 | Precast foundation installation jig and installation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3779907B2 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008175036A (en) * | 2007-01-19 | 2008-07-31 | Grundage Corp | Construction method of solid foundation by connecting concrete foundation beam member and concrete foundation beam connecting member |
| KR100964155B1 (en) | 2008-02-04 | 2010-06-17 | 김근택 | Precast deck for bridges with lifting aids |
| JP2013241731A (en) * | 2012-05-17 | 2013-12-05 | Sansei:Kk | Pile head joint structure of winged steel pipe pile, and method of constructing the same |
| US9390560B2 (en) | 2007-09-25 | 2016-07-12 | Metaio Gmbh | Method and device for illustrating a virtual object in a real environment |
-
2001
- 2001-10-26 JP JP2001329818A patent/JP3779907B2/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008175036A (en) * | 2007-01-19 | 2008-07-31 | Grundage Corp | Construction method of solid foundation by connecting concrete foundation beam member and concrete foundation beam connecting member |
| US9390560B2 (en) | 2007-09-25 | 2016-07-12 | Metaio Gmbh | Method and device for illustrating a virtual object in a real environment |
| KR100964155B1 (en) | 2008-02-04 | 2010-06-17 | 김근택 | Precast deck for bridges with lifting aids |
| JP2013241731A (en) * | 2012-05-17 | 2013-12-05 | Sansei:Kk | Pile head joint structure of winged steel pipe pile, and method of constructing the same |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3779907B2 (en) | 2006-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101632030B1 (en) | Installation structure and method of steel tube columns and brackets | |
| KR100685862B1 (en) | Steel pipe pile head reinforcement structure | |
| JP2003129495A (en) | Jig and method for installing precast foundation | |
| CN108086697B (en) | Precise positioning device and precise positioning method for embedded part hoisting | |
| KR100819521B1 (en) | Head reinforcement device of concrete pipe pile for basic construction | |
| JP2000320142A (en) | Device and method for reinforcement assembly in construction work | |
| JP7182383B2 (en) | Building foundation construction method | |
| CN212670862U (en) | Open type wall connecting box | |
| JP6181000B2 (en) | Foundation structure of building with steel frame and its construction method | |
| JP4119943B1 (en) | Hardware for holding the base formwork spacing and anchor bolts | |
| KR20050075057A (en) | Apparatus for fixing a terminal box to a wall of building | |
| JPH0115774Y2 (en) | ||
| JP3806021B2 (en) | Lifting method of precast foundation | |
| JPH0247684Y2 (en) | ||
| JPH102010A (en) | Construction method of reinforced concrete column | |
| JPH0676277U (en) | Hanging metal fittings for precast concrete formwork | |
| KR102494024B1 (en) | Placing boom mast supporting bracket | |
| JP2008285832A (en) | Anchor metal fitting, lightweight cellular concrete panel, lifting method of lightweight cellular concrete panel, and mounting method of lightweight cellular concrete panel. | |
| JP2001227094A (en) | Floor structure of steel framed building | |
| JPH0211524Y2 (en) | ||
| KR200430669Y1 (en) | Terminal box fixture | |
| JP2512649Y2 (en) | U-shaped groove suspender | |
| JPH074285Y2 (en) | Anchor bolt installation jig | |
| JP2008138462A (en) | Base metal support for wall panel mounting and support structure using the same | |
| JP6181001B2 (en) | Steel unit level adjuster |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041020 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051122 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060119 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060221 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060303 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |