JPH05263768A - Booster pump operation controller - Google Patents
Booster pump operation controllerInfo
- Publication number
- JPH05263768A JPH05263768A JP6544792A JP6544792A JPH05263768A JP H05263768 A JPH05263768 A JP H05263768A JP 6544792 A JP6544792 A JP 6544792A JP 6544792 A JP6544792 A JP 6544792A JP H05263768 A JPH05263768 A JP H05263768A
- Authority
- JP
- Japan
- Prior art keywords
- pressure
- pump
- water distribution
- booster pump
- booster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Control Of Non-Electrical Variables (AREA)
- Control Of Positive-Displacement Pumps (AREA)
- Feedback Control In General (AREA)
Abstract
(57)【要約】
【構成】 本発明は、第1および第2の増圧ポンプから
なる並列配水接続の吐出側に設置されて配水圧力を測定
する圧力計と、第1および第2の増圧ポンプの運転方式
を一日単位で予め設定する24時間タイマーと、この2
4時間タイマーからの運転指令と圧力計からの圧力信号
とを比較検討し、第1または第2の増圧ポンプの運転を
選択する号機選択回路とを備えた増圧ポンプ運転制御装
置である。
【効果】 本発明により、配水場の効果的な運用を図る
ことが可能となる。
(57) [Summary] [Constitution] The present invention includes a pressure gauge installed on the discharge side of a parallel water distribution connection composed of first and second pressure boosting pumps for measuring water distribution pressure, and first and second pressure increasing gauges. A 24-hour timer that presets the operating method of the pressure pump on a daily basis
The booster pump operation control device is provided with a machine number selection circuit that compares and examines the operation command from the 4-hour timer and the pressure signal from the pressure gauge and selects the operation of the first or second booster pump. [Effect] According to the present invention, it is possible to effectively operate a water distribution plant.
Description
【0001】[0001]
【産業上の利用分野】本発明は、配水ポンプ場に用いら
れる増圧ポンプ運転制御装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a booster pump operation control device used in a distribution pump station.
【0002】[0002]
【従来の技術】従来、上水道の配水ポンプ場の増圧ポン
プにおいては1日の時間帯により予め設定された需要パ
ターンに基づき、24時間タイマーを用いて、配水ポン
プ場に設置された大小のポンプを切換えて需要量の変化
に対応してきた。2. Description of the Related Art Conventionally, in booster pumps of water supply water distribution pump stations, large and small pumps installed in the water distribution pump station are used by using a 24-hour timer based on a demand pattern preset by the time of day. To respond to changes in demand.
【0003】[0003]
【発明が解決しようとする課題】需要の変化は需要パタ
ーンどおりには推移しないため、ポンプ切換時の需要量
によっては、配水圧が長時間、極端に上昇、あるいは低
下することがあった。Since the demand change does not change according to the demand pattern, the water distribution pressure may increase or decrease extremely for a long time depending on the demand amount at the time of pump switching.
【0004】本発明は、切換時の需要量に対応し、大小
ポンプの切換え、タイミングを配水圧変動が極力少なく
なる様制御する。増圧ポンプ運転制御装置を提供するこ
とを目的とする。According to the present invention, the switching of the large and small pumps and the timing are controlled so that the fluctuation of the water distribution pressure is minimized according to the demand amount at the time of switching. An object of the present invention is to provide a booster pump operation control device.
【0005】[0005]
【課題を解決するための手段】本発明は、上水道配水ポ
ンプ場に設置されて配水圧力を昇圧する容量大なる第1
の増圧ポンプと、この第1の増圧ポンプと並列に配管接
続されて前記配水圧力を加減する容量小なる第2の増圧
ポンプと、これら第1および第2の増圧ポンプからなる
並列配水接続の吐出側に設置されて配水圧力を測定する
圧力計と、第1および第2の増圧ポンプの運転時刻を一
日単位で予め設定する24時間タイマーと、この24時
間タイマーからの運転指令と圧力計からの圧力信号とを
比較検討し、第1または第2の増圧ポンプの運転を選択
する号機選択回路と、24時間タイマーにより第1の増
圧ポンプから第2の増圧ポンプに切換える時刻では圧力
計の値が設定圧力以下に低下することを条件に切換えを
実行し、第2の増圧ポンプから第1の増圧ポンプに切換
える時刻では、圧力計の値が設定圧力以上に上昇したこ
とを条件に切換えを実行させる号機選択回路と、この号
機選択回路からの運転信号によって第1または第2の増
圧ポンプの運転を制御する運転制御回路と、を具備して
なる増圧ポンプ運転制御装置である。The present invention is a first large-capacity installed in a water supply water distribution pump station to increase the distribution pressure.
Pressure boosting pump, a second pressure boosting pump that is connected in parallel with the first pressure boosting pump and has a small capacity for adjusting the water distribution pressure, and a parallel combination of these first and second pressure boosting pumps. A pressure gauge installed on the discharge side of the water distribution connection to measure the distribution pressure, a 24-hour timer that presets the operating time of the first and second booster pumps on a daily basis, and operation from this 24-hour timer The command and the pressure signal from the pressure gauge are compared and examined, and the No. selection circuit that selects the operation of the first or second booster pump and the 24-hour timer from the first booster pump to the second booster pump. At the time of switching to, the switching is executed on condition that the value of the pressure gauge falls below the set pressure, and at the time of switching from the second booster pump to the first booster pump, the value of the pressure gauge is above the set pressure. Switch to the condition that it has risen to And Unit selection circuit to execute a pressure increase pump operation control device comprising comprising a driving control circuit for controlling the operation of the first or second boost pump, a by operating signals from the Unit selection circuit.
【0006】[0006]
【作用】本発明の増圧ポンプ運転制御装置においては、
上水道配水ポンプ場に第1の増圧ポンプを設置して配水
圧力を昇圧し、第1の増圧ポンプと並列に第2の増圧ポ
ンプを配管接続して配水圧力を加減し、これら第1およ
び第2の増圧ポンプからなる並列配水接続の吐出側に圧
力計を設置して配水圧力を測定し、第1および第2の増
圧ポンプの運転方式を24時間タイマーを用いて一日単
位で予め設定し、24時間タイマーからの運転指令と圧
力計からの圧力信号とを比較検討し、第1または第2の
増圧ポンプの運転を選択し、号機選択回路からの運転信
号によって第1または第2の増圧ポンプの運転を制御す
る。In the booster pump operation control device of the present invention,
The first booster pump is installed at the water supply water pumping station to increase the distribution pressure, and the second booster pump is connected in parallel with the first booster pump to adjust the distribution pressure. And a pressure gauge is installed on the discharge side of the parallel water distribution connection consisting of the second pressure boosting pump to measure the water distribution pressure, and the operation method of the first and second pressure boosting pumps is calculated on a daily basis using a 24-hour timer. In advance, the operation command from the 24-hour timer and the pressure signal from the pressure gauge are compared and examined, the operation of the first or second booster pump is selected, and the first operation is performed by the operation signal from the machine selection circuit. Alternatively, the operation of the second pressure boosting pump is controlled.
【0007】[0007]
【実施例】次に本発明の一実施例を説明する。図1にお
いて、7は上水道配水ポンプ場に設置されて配水圧力を
昇圧する第1の増圧ポンプ8は増圧ポンプ7と並列に配
管接続されて配水圧力を加減する第2の増圧ポンプ、5
は増圧ポンプ7、8からなる並列配水接続の吐出側に設
置されて配水圧力を測定する圧力計、2は増圧ポンプ
7、8の運転方式を一日単位で予め設定する24時間タ
イマー、3は24時間タイマー2からの運転指令と圧力
計5からの圧力信号とを比較検討し、増圧ポンプ7、8
の運転を選択する号機選択回路、6は号機選択回路3か
らの運転信号によって増圧ポンプ7、8の運転を制御す
る運転制御回路であり、予め予定された時間でポンプ容
量を切換える容量切換手段と、配水圧力を検出する圧力
検出手段とを持ち、この圧力検出手段が予め設定された
条件を満たさない時は、容量切換手段を消去することを
特徴とする制御装置で、24Hタイマによる容量切換制
御を行なっている配水ポンプ設備において、配水圧力を
計測する圧力計5を設置し、圧力計5のアナログ信号か
ら警報設点を検出する警報設定器4の出力信号(接点)
により、配水圧力上昇時は、配水流量を抑制するように
ポンプ設備を制御し、逆に、配水圧力低下時は配水流量
を増加させるようにポンプ設備を運転する。24Hタイ
マーによる容量切換制御に配水圧力制御を加味すること
で、配水圧力の急激な変化を抑え、安定した配水を行
う。EXAMPLE An example of the present invention will be described below. In FIG. 1, reference numeral 7 is a first pressure increasing pump 8 installed in a water supply water distribution pump station to increase the distribution pressure, and second pressure increasing pump 8 is connected in parallel with the pressure increasing pump 7 to adjust the distribution pressure. 5
Is a pressure gauge that is installed on the discharge side of the parallel water distribution connection consisting of the pressure boosting pumps 7 and 8 and measures the water distribution pressure. 2 is a 24-hour timer that presets the operating mode of the pressure boosting pumps 7 and 8 on a daily basis. 3 examines the operation command from the 24-hour timer 2 and the pressure signal from the pressure gauge 5, and examines the pressure boosting pumps 7 and 8.
Is an operation control circuit for controlling the operation of the booster pumps 7, 8 in accordance with an operation signal from the machine selection circuit 3, and is a capacity switching means for switching the pump capacity at a predetermined time. And a pressure detecting means for detecting the water distribution pressure, and when the pressure detecting means does not satisfy a preset condition, the capacity switching means is erased. An output signal (contact point) of an alarm setter 4 that detects the alarm setting point from an analog signal of the pressure gauge 5 by installing a pressure gauge 5 that measures the distribution pressure in the water distribution pump facility that controls
Therefore, when the distribution pressure rises, the pump equipment is controlled so as to suppress the distribution flow rate, and conversely, when the distribution pressure decreases, the pump equipment is operated so as to increase the distribution flow rate. By adding water distribution pressure control to the capacity switching control by the 24H timer, abrupt changes in water distribution pressure are suppressed and stable water distribution is performed.
【0008】即ち、この配水ポンプ場において24Hタ
イマー2により、大容量の増圧ポンプ7と小容量の増圧
ポンプ7を切換えて需要に応じた運転を行なう。これを
図2に示す。That is, in this water distribution pump station, the 24H timer 2 switches between the large capacity booster pump 7 and the small capacity booster pump 7 to perform the operation according to the demand. This is shown in FIG.
【0009】需要が高まり24Hタイマー2の信号に基
づき増圧ポンプから増圧ポンプに切換える時、圧力計5
において配水圧を測定し、警報設定器4より圧力低下の
信号が出されるまでは小ポンプによる運転を続ける。When the demand increases and the booster pump is switched to the booster pump based on the signal of the 24H timer 2, the pressure gauge 5
The distribution pressure is measured at, and the operation with the small pump is continued until the alarm setter 4 outputs a signal of pressure drop.
【0010】需要が下がり、大ポンプから小ポンプに切
換える時、需要減により圧力上昇が生じるまでは大ポン
プによる運転を続ける。When the demand is reduced and the large pump is switched to the small pump, the operation with the large pump is continued until the pressure rises due to the reduced demand.
【0011】次に他の実施例として同容量からなる複数
台の増圧ポンプの台数制御に用いることもできる。Next, as another embodiment, it can be used to control the number of a plurality of booster pumps having the same capacity.
【0012】即ち、需要が高まり、24Hタイマーの信
号に基づき増圧ポンプ1台から2台の運転に切換える
時、圧力計において、配水圧を測定し、警報設定器より
圧力低下の信号が出されるまではポンプ1台による運転
を続けるのである。That is, when the demand increases, and when the operation of one booster pump is switched to that of two booster pumps based on the signal of the 24H timer, the pressure gauge measures the water distribution pressure, and the alarm setter outputs a pressure drop signal. Until then, operation is continued with one pump.
【0013】[0013]
【発明の効果】本発明により配水圧力の極端な変動を最
小限に抑え、漏水、配管の亀裂、破損を防ぐことがで
き、需要パターンに合わない需要変動を吸収し、水圧低
下による給水の不足を防ぐことができる。According to the present invention, it is possible to minimize extreme fluctuations in distribution pressure, prevent water leakage, cracks in pipes, and breakage, absorb demand fluctuations that do not meet demand patterns, and lack water supply due to water pressure drop. Can be prevented.
【図1】本発明の一実施例を示す運動制御装置の構成図
である。FIG. 1 is a configuration diagram of a motion control device showing an embodiment of the present invention.
【図2】図1の特性を示す説明図である。FIG. 2 is an explanatory diagram showing the characteristics of FIG.
2…24時間タイマー 3…号機選択回路 5…圧力計 7、8…増圧ポンプ 2 ... 24-hour timer 3 ... Unit selection circuit 5 ... Pressure gauge 7, 8 ... Booster pump
Claims (1)
力を昇圧する容量大なる第1の増圧ポンプと、この第1
の増圧ポンプと並列に配管接続されて前記配水圧力を加
減する容量小なる第2の増圧ポンプと、これら第1およ
び第2の増圧ポンプからなる並列配水接続の吐出側に設
置されて前記配水圧力を測定する圧力計と、前記第1お
よび第2の増圧ポンプの運転時刻を一日単位で予め設定
する24時間タイマーと、この24時間タイマーからの
運転指令と前記圧力計からの圧力信号とを比較検討し、
前記第1または第2の増圧ポンプの運転を選択する号機
選択回路と、この24時間タイマーにより第1の増圧ポ
ンプから第2の増圧ポンプに切換える時刻では圧力計の
値が設定圧力以下に低下することを条件に切換えを実行
し、第2の増圧ポンプから第1の増圧ポンプに切換える
時刻では、圧力計の値が設定圧力以上に上昇したことを
条件に切換えを実行させる号機選択回路と、この号機選
択回路からの運転信号によって前記第1または第2の増
圧ポンプの運転を制御する運転制御回路と、を具備して
なる増圧ポンプ運転制御装置。1. A first pressure increasing pump having a large capacity installed in a water supply water distribution pump station to increase distribution pressure, and the first pressure increasing pump.
Second pressure boosting pump connected in parallel with the pressure boosting pump and having a small capacity for adjusting the water distribution pressure, and installed on the discharge side of the parallel water distribution connection composed of the first and second pressure boosting pumps. A pressure gauge for measuring the water distribution pressure, a 24-hour timer for presetting the operating time of the first and second booster pumps on a day-by-day basis, an operation command from the 24-hour timer and the pressure gauge Weigh the pressure signal,
At the time of switching from the first pressure boosting pump to the second pressure boosting pump by this unit selection circuit for selecting the operation of the first pressure boosting pump or the second pressure boosting pump, the value of the pressure gauge is below the set pressure at the time of switching. The changeover is performed on the condition that the pressure gauge is lowered to the lower limit, and at the time when the second pressure increasing pump is changed to the first pressure increasing pump, the changeover is executed on the condition that the value of the pressure gauge rises above the set pressure. A booster pump operation control device comprising: a selection circuit; and an operation control circuit that controls the operation of the first or second booster pump according to an operation signal from the unit selection circuit.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6544792A JPH05263768A (en) | 1992-03-24 | 1992-03-24 | Booster pump operation controller |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6544792A JPH05263768A (en) | 1992-03-24 | 1992-03-24 | Booster pump operation controller |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH05263768A true JPH05263768A (en) | 1993-10-12 |
Family
ID=13287405
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6544792A Pending JPH05263768A (en) | 1992-03-24 | 1992-03-24 | Booster pump operation controller |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH05263768A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003104655A1 (en) * | 2002-06-11 | 2003-12-18 | ダイキン工業株式会社 | Pump unit |
-
1992
- 1992-03-24 JP JP6544792A patent/JPH05263768A/en active Pending
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2003104655A1 (en) * | 2002-06-11 | 2003-12-18 | ダイキン工業株式会社 | Pump unit |
| EP1533525A4 (en) * | 2002-06-11 | 2005-09-14 | Daikin Ind Ltd | PUMP |
| US7399165B2 (en) | 2002-06-11 | 2008-07-15 | Daikin Industries, Ltd. | Pump unit with multiple operation modes |
| CN100414103C (en) * | 2002-06-11 | 2008-08-27 | 大金工业株式会社 | pump unit |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6045331A (en) | Fluid pump speed controller | |
| US8545189B2 (en) | Method and arrangement for controlling a pumping station | |
| KR20010022346A (en) | Adaptive cascade control algorithm | |
| JP3729648B2 (en) | Control device and control method for air compressor | |
| JPH05263768A (en) | Booster pump operation controller | |
| JP2875702B2 (en) | Automatic operation system for compressed air equipment | |
| CN106150994B (en) | A kind of water pump control method and controller, the water pump using this method | |
| JPH08193592A (en) | Distribution pump pressure controller | |
| EP0300003B1 (en) | Method of controlling a plurality of machines | |
| JP3002118B2 (en) | Operating method of compressor | |
| JPS60243701A (en) | Water level control device | |
| JP2708826B2 (en) | Water supply control device | |
| JPH06195102A (en) | Pump controller | |
| EP4115259B1 (en) | Method and system for controlling a plurality of compressors coupled to a compressed-air installation | |
| RU2056480C1 (en) | Method for regulating head in water supply system | |
| JPH11159468A (en) | Water supply device | |
| JPH07180694A (en) | Supply pressure control method of industrial air | |
| JP2019143541A (en) | Gas supply system and gas supply method | |
| SU1634830A1 (en) | Method of control of pump station | |
| JP3127169B2 (en) | Pump control method | |
| SU1765612A1 (en) | Boilers capacity control method | |
| JPS584196B2 (en) | Pump soil wash | |
| JP3709170B2 (en) | Switching method of wiping compressor in continuous hot dipping equipment | |
| JPS57151085A (en) | Method of controlling the number of operating compressors | |
| JPH05157891A (en) | Water supply pump controller for nuclear power plant |