KR100854551B1 - Acupressure plate and PC panel combined retaining wall structure and construction method - Google Patents
Acupressure plate and PC panel combined retaining wall structure and construction method Download PDFInfo
- Publication number
- KR100854551B1 KR100854551B1 KR1020070034048A KR20070034048A KR100854551B1 KR 100854551 B1 KR100854551 B1 KR 100854551B1 KR 1020070034048 A KR1020070034048 A KR 1020070034048A KR 20070034048 A KR20070034048 A KR 20070034048A KR 100854551 B1 KR100854551 B1 KR 100854551B1
- Authority
- KR
- South Korea
- Prior art keywords
- ground
- panel
- pressure plate
- bolt
- retaining wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0283—Retaining or protecting walls characterised by constructional features of mixed type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
- E02D5/801—Ground anchors driven by screwing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
본 발명은 지중볼트와 지압판, 그리고 PC 판넬을 이용한 옹벽시공방법 및 그 구조에 관한 것으로, 옹벽 시공시 절취사면을 지압판으로 먼저 1차 보강을 실시하여 원지반을 안정화시키고 그 위에 다시 PC 판넬을 지중볼트와 결합하여 2차 보강을 실시함으로써 뒤채움 면적을 축소하고 보다 증대된 원지반의 안정성을 확보하고자 하는 것이며, 또한 본 발명에 의한 구성은 지중볼트가 지압판을 관통하여 인장된 상태로 너트로 먼저 체결 고정되고 다시 상기 지중볼트가 PC 판넬과 결합되어 너트로 체결됨으로써 2차로 체결 고정되어 절취면을 압축하며 PC 판넬의 전면부 중앙에는 너트 체결을 위한 오목부가 형성되고 그 배면부에는 지압판이 삽입되어 정착되도록 지압판에 대응하는 형상으로 정착홈이 형성되며 지중볼트가 지면 또는 지압판에 대해 경사지게 설치되는 경우 레베링 블록을 지압판 밑에 설치하여 지압판의 설치각도가 조절될 수 있도록 하는 구성을 포함하는 것을 특징으로 한다.
지중볼트, PC 판넬, 지압판, 그라우팅, 옹벽, 레베링 블록, 절취사면, 뒤채움, 정착홈
The present invention relates to a retaining wall construction method using the underground bolt, a pressure plate, and a PC panel, and its structure. The secondary reinforcement in combination with to reduce the backfill area and ensure the increased stability of the base, and the configuration according to the present invention is first fastened with a nut while the ground bolt is tensioned through the pressure plate Then, the ground bolt is coupled to the PC panel and tightened with the nut to be secondarily fixed and compressed to cut the cutting surface. The fixing groove is formed in a shape corresponding to the ground bolt and the ground bolt is inclined with respect to the ground or the pressure plate. When installed, it characterized in that it comprises a configuration to install the levering block under the pressure plate to adjust the installation angle of the pressure plate.
Underground bolt, PC panel, acupressure plate, grouting, retaining wall, leveling block, cutout, backfill, settling groove
Description
도 1은 종래의 PEM 공법에 의한 옹벽 시공과정을 나타낸 과정도1 is a process diagram showing a retaining wall construction process by a conventional PEM method
도 2는 본 발명에 의한 옹벽 시공과정을 나타낸 과정도2 is a process diagram showing a retaining wall construction process according to the present invention
도 3은 본 발명에 의한 PC 판넬 및 지압판 결합구조를 나타낸 측면도(지중볼트와 수평방향으로 결합시)Figure 3 is a side view showing the PC panel and the pressure plate coupling structure according to the present invention (when coupled horizontally with the ground bolt)
도 4는 본 발명에 의한 PC 판넬 및 지압판 결합구조를 나타낸 측면도(지중볼트와 경사방향으로 결합시)Figure 4 is a side view showing the PC panel and the pressure plate coupling structure according to the present invention (when coupled in the oblique direction with the ground bolt)
도 5는 지중볼트, 지압판 및 PC판넬의 결합에 의한 보강으로, 도 5(가)는 지중볼트와 지압판의 1차 보강, 도 5(나)는 지중볼트와 PC판넬의 결합에 의한 2차 보강도 도 6은 지중볼트와 지압판 및 PC 판넬의 결합에 의해 2차로 원지반이 보강된 상태를 나타내는 측단면도5 is a reinforcement by combining the ground bolt, the pressure plate and the PC panel, Figure 5 (a) is the primary reinforcement of the ground bolt and the pressure plate, Figure 5 (b) is a secondary reinforcement by the combination of the ground bolt and the PC panel Figure 6 is a side cross-sectional view showing a state in which the secondary ground is reinforced by the combination of the ground bolt, the pressure plate and the PC panel.
도 7은 암반의 절리면이 있는 경우 지중볼트의 설치구조를 나타낸 측단면도Figure 7 is a side cross-sectional view showing the installation structure of the ground bolt when there is a joint surface of the rock
도 8은 지중볼트를 경사지게 설치할 경우 부지이용성 증대를 나타내는 측단면도Figure 8 is a side cross-sectional view showing the increase in site usability when the underground bolt is installed inclined
도 9는 손상된 PC 판넬만을 교체하는 과정을 설명하는 정면도 및 측면도9 is a front view and a side view illustrating a process of replacing only a damaged PC panel
〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
1 : 절취(사)면, 2 : 지중볼트 구멍, 3 : 지중볼트(Earth Bolt), 4 : 마이크로 파일,1: cut-out surface, 2: ground bolt hole, 3: earth bolt, 4: micro pile,
5 : 전면판, 6 : 뒤채움토, 7 : 짹(Jack), 8 : 지압판, 9 : PC 판넬,5: front panel, 6: backfill soil, 7: jack, 8: chiropractor, 9: PC panel,
91 : PC 판넬 전면부, 92 : PC 판넬 배면부, 10, 11 : 고정너트,91: PC panel front part, 92: PC panel rear part, 10, 11: fixing nut,
12, 12' : 레베링 블록, 13, 13' : 고정핀 구멍 및 고정핀, 14 : 지면, 15 : 정착홈,12, 12 ': lever block, 13, 13': fixing pin hole and fixing pin, 14: ground, 15: fixing groove,
16 : 오목부16: concave
본 발명은 절취사면을 보호하기 위해 설치하는 다단식 옹벽에 관한 것으로, 비탈면을 절취한 후에 드러나는 절취면에 지중볼트(Earth Bolt)를 통해 지압판을 먼저 결합 설치하여 불안정한 절취면을 안정화 시키고 지압판 위에 다시 PC 판넬을 상기 지중볼트를 통해 결합하되 지중볼트가 지면에 대해 수평 또는 경사지게 설치될 수 있는 구조에 관한 것이다.The present invention relates to a multi-stage retaining wall installed to protect the cut surface, and first installs the pressure plate through the ground bolt (Earth Bolt) to the cutting surface exposed after cutting the slope surface to stabilize the unstable cutting surface and the PC on the pressure plate again The panel is coupled to the ground bolt through the ground bolt relates to a structure that can be installed horizontally or inclined with respect to the ground.
일반적으로 PC판넬과 지중볼트(Earth Bolt) 결합옹벽은 절취면에 매설된 지중볼트(Earth Bolt)를 인장한 후 절취면 전면에 PC판넬을 결합시켜 PC판넬 배면토를 압축함으로써 뒤채움토부분이 일종의 중력체로 작용하여 절취면의 수평토압에 저항하도록 하는 공법으로 지중볼트를 이용하지 않는 일반옹벽 공법에 비해 원지반 의 보강효과가 크고 Top-down 방식의 시공이 가능하다는 장점이 있다.In general, PC retaining wall and Earth Bolt coupling retaining wall is tensioned with Earth Bolt embedded in the cutting surface, and then joins the PC panel in front of the cutting surface to compress the backing soil of the PC panel. It is a method that acts as a kind of gravity body to resist the horizontal earth pressure on the cutting surface. It has the advantage of greater reinforcement effect of the ground plate and top-down construction than the general retaining wall method without using underground bolts.
종래 PC 판넬과 지중볼트를 이용한 대표적 공법인 PEM옹벽은, 옹벽을 구성하기 위해 바닥면부까지 토사의 안식각에 따라 경사면이 형성되도록 절토작업을 하고, 절토경사면 최하단부에 수평방향으로 소정의 간격을 두고 앵커구멍을 옹벽면에 직각에 가까운 방향으로 굴착하여, 상기 앵커구멍의 중심부에 지중볼트를 삽입한 후 시멘트 모르타르등으로 상기 앵커구멍을 채워넣어 양생시키고, 상기 지중볼트의 말단 나사부에 그 중앙부에 오목부 및 구멍부가 형성되어 있는 전면판을 끼운후, 너트로서 체결하며, 상기 전면판과 절토면 사이의 공간부에 토사를 채워넣어 성토층을 형성하고, 다시 너트를 더욱 조임으로서 상기 성토층에 압축응력이, 상기 지중볼트에는 프리스트레스 인장력이 작용하도록 하며, 상기 공정을 그 윗부분 절취면에 되풀이하여 전체 옹벽을 완성하여 감을 특징으로 하는 옹벽시공방법이었다. 이 방법의 정확한 이해를 위해서 시공과정을 단계별로 살펴보면 아래와 같다.PEM retaining wall, which is a typical method using a PC panel and underground bolts, cuts to form an inclined surface according to the repose angle of the soil to the bottom surface to form the retaining wall, and anchor holes at predetermined intervals in the horizontal direction at the bottom of the cut slope. Excavation in a direction close to a right angle to the retaining wall surface, inserting the ground bolt in the center of the anchor hole, and filling the anchor hole with cement mortar or the like, and curing. After inserting the front plate with holes formed therein, it is fastened as a nut, and the earth is filled in the space between the front plate and the cut surface to form a fill layer, and the nut is further tightened to compress the stress layer. The ground bolts are subjected to prestressing tension, and the process is repeated on the upper cutting surface. It was a retaining wall construction method characterized by finishing the body retaining wall. In order to understand this method, the construction process is as follows.
1. 비탈면 상단부 상부 3m 구간을 절토(절토구배 1 : 0.2∼0.3)한다(도면 1. 가).1. Cut the upper 3m section of the upper part of the inclined surface (cutting gradient 1: 0.2 to 0.3) (Fig. 1A).
2. 절취면에 천공위치를 선정 한 후 지중볼트구멍(1)을 천공(천공경 75mm , C.T.C 1.5m)한다(도면 1. 나).2. After selecting the drilling position on the cut-out surface, drill the underground bolt hole (1) (drilling diameter 75mm, C.T.C 1.5m) (Fig. 1. B).
3. 지중볼트(Earth Bolt, Ø25)와 Spacer, Ø12 PVC 호스를 체결하여 지중볼트를 지중볼트 구멍에 삽입한 후 막음재겸용 케이싱 파이프를 삽입하고 시멘트 그라우팅 시공(주입압 3∼5Kg/cm2)을 한다(도면 1. 다).3. Insert the ground bolt (Ø25), Spacer and Ø12 PVC hose, insert the ground bolt into the ground bolt hole, insert the casing pipe for the blocking material, and cement grouting (injection pressure 3 ~ 5Kg / cm 2 ). (Fig. 1 c).
4. 상단부 하부 3m 구간을 절토하여 상기 1∼3의 과정을 수행한다(도면 1. 라).4. Cut the lower 3m section of the upper part and perform the
5. 기초블럭을 설치하고(도면 1. 마), 마이크로 파일(Micro Pile) 위치를 천공(천공경 75mm , C.T.C 1.0m)한 후, 마이크로 파일( Ø32 이형철근)을 삽입 및 그라우팅 한다(도면 1. 바).5. Install the basic block (Fig. 1 e), drill the micro pile location (drilling diameter 75mm, CTC 1.0m), and insert and grout the micro pile (Ø32 deformed steel bar) (Fig. 1). F).
6. 지중볼트의 자유장부 방수처리를 하고 지중볼트에 전면판을 끼워 설치한 후 너트를 체결한다(도면 1. 사).6. Waterproof the free bolts of the underground bolts, install the front plate on the underground bolts, and tighten the nuts (Fig. 1. g).
7. 전면판의 배면부 뒷채움 및 뒷채움 다짐을 실시한다(도면 1. 아).7. Carry back filling and back filling on the front panel (Fig. 1. a).
8. 상기 전면판 위에 다음 전면판을 적층설치하고 뒷채움 다짐을 한다(도면 1. 자).8. Lay the next faceplate on the faceplate and backfill compaction (Fig. 1).
9. 지중볼트와 전면판에 짹(Jack)을 설치하여 지중볼트를 인장(평균 5∼7 Ton)한다(도면 1. 차).9. Tighten the ground bolts (average 5-7 tons) by installing jacks on the ground bolts and the faceplate (Fig. 1).
10. 너트 결합 후 돌출된 긴장재를 절단하고 단부 그라우팅을 실시하고 긴장재 끝단에 Cap을 설치하여 상단부 PEM 옹벽 설치를 완료한다(도면 1. 카).10. After tightening the nut, cut out the protruding tension member, grout the end, and install the cap at the end of the tension member to complete the installation of the upper PEM retaining wall (Fig. 1. K).
11. 1에서 10의 동일한 방법을 수행하여 상하단부 PEM 옹벽 설치를 완료한다(도면 1. 타).11. Complete the installation of the upper and lower PEM retaining walls by following the same procedure as in 1 to 10 (Fig. 1).
그런데 상기와 같은 시공방법은 다음과 같은 문제가 있다. 첫째, P.C Panel과 Earth Bolt가 채결된 후 인장이 완료되어 옹벽의 구조적 메카니즘이 완전히 작용되기까지는 상기 시공순서 1.에서 시공순서 10.의 과정이 완료되어야 하므로 소요 시간이 많이 필요하게 되고 그 동안 원래의 지반(절취된 부분)은 많이 이완(느 슨해짐 현상)되어 지반이 불안정하고 취약해 진다는 문제점이 발생하게 된다.However, the construction method as described above has the following problems. First, it takes a lot of time because the process of
둘째, 지중볼트를 바닥지면에 대해 수평하게 설치하게 되어 지중볼트가 작용하는데 필요한 지반의 수평방향의 길이가 길어지게 되는데 (압축력 확보를 위해서는 일정 길이의 지중볼트를 사용해야 하므로) 지중볼트가 토지 소유의 경계를 넘어가는 경우 등에 있어서 이를 방지하기 위해서는 불가피하게 지중볼트가 충분히 삽입되어 매설될 수 있도록 절토량을 줄여야 하므로 부지 이용성이 저하되는 문제가 있었고 암반의 경우 절리(암반의 결)의 방향을 고려하지 못하고 수평방향으로만 설치되어 봉합의 효과가 낮다는 문제가 있었다.Secondly, the ground bolts are installed horizontally with respect to the ground surface, so the horizontal length of the ground required for the ground bolts to act becomes longer (because a certain length of ground bolts must be used to secure the compressive force). In case of crossing the boundary, in order to prevent this, the amount of cut is inevitably reduced so that underground bolts can be inserted and buried enough. Therefore, there is a problem that the site availability is deteriorated. In case of rock, the direction of jointing (rock formation) cannot be considered There was a problem that the effect of the suture is low because it is installed only in the horizontal direction.
셋째, 기존의 PEM 옹벽방식은 PC 판넬이 적층된 구조로 되어 지진등 외부충격에 의해서 P.C 판넬 부분에 파손이 생길 경우 보수를 하려면 해당 판넬만을 교체하기 어렵고 일정구간을 재 시공해야만 된다는 문제점이 있다.Third, the conventional PEM retaining wall method has a structure in which PC panels are stacked, so that in case of damage to the P.C panel part due to an external shock such as an earthquake, it is difficult to replace only the corresponding panel and rebuild a certain section.
본 발명은 첫째, 절취된 부분의 원지반의 이완(느슨해짐)을 최대한 억제시켜 보다 안전한 구조물을 만들고자 하는 것이며 이를 위해 PC 판넬과 별도로 먼저 지압판을 지중볼트와 결합하여 원지반을 안정화시키고 그 위에 다시 PC 판넬과 상기 지중볼트를 결합하여 이중으로 압축함으로써 보다 증대된 원지반의 안정성을 확보하는 PC 판넬과 지압판의 결합구성을 제공하고자 하는 것이며, 둘째, 지면에 대해 수평한 방향 뿐만아니라 경사진 방향으로도 지중볼트를 설치할 수 있도록 함으로써 기존 방식보다 역학적으로 우수한 옹벽을 제공하고 지중볼트 설치시 수평거리를 줄여 부지 활용성을 증대하고자 하는 것이며, 셋째, 손상된 PC 판넬을 간편하고 효율 적으로 교체할 수 있도록 하고자 하는 것이다.The present invention, first, to make a safer structure by restraining the loosening (loose) of the cut of the cut part as much as possible for this purpose separately from the PC panel to combine the pressure plate with the ground bolt to stabilize the base plate and again on the PC panel Combining the above and the ground bolt to double compression to provide a combined configuration of the PC panel and the pressure plate to secure the stability of the original ground, and secondly, the ground bolt not only in the horizontal direction to the ground but also in the inclined direction It is intended to increase the utilization of the site by providing a mechanically superior retaining wall by reducing the horizontal distance when installing underground bolts, and to make it easy and efficient to replace damaged PC panels. .
본 발명의 구성과 작용은 다음과 같다.The configuration and operation of the present invention is as follows.
도 5. 가에 도시된 바와 같이 절취사면(1)에 지중볼트 구멍을 뚫고 지중볼트(3)를 삽입한 다음 1차로 먼저 지압판(8)을 설치하고 지중볼트를 인장하여 너트(11)로 체결함으로써 절취된 원지반이 이완되기 전에 원지반이 안정화되도록 보강한다. 그리고 도 5. 나에 도시된 바와 같이 지압판(11)을 통과해서 연장되어 있는 지중볼트에 PC 판넬(9)을 결합하여 지압판을 PC 판넬이 덮은 상태로 결합되도록 상기 지중볼트를 너트(10)로 체결함으로써 2차로 보강한다. 이에 따라 지압판만을 사용하는 경우 보다 원지반에 압축력이 작용되는 범위를 더욱 크게 함으로써 원지반의 안정성을 증대시킬 수 있게 되는 것이다. 또한 도 7과 같이 암반의 절리면이나 원지반의 결이 형성되어 있는 경우에는 지중볼트를 지면 또는 지압판이나 PC 판넬에 대해 대해 경사지게 또는 암반의 절리면이나 원지반의 결에 대해 가능한 한 수직방향으로 설치함으로써 보강력을 더욱 증대시킬 수 있고, 도 8과 같이 부지의 이용 여건상 지중볼트의 수평설치길이를 짧게 해야 할 필요가 있는 경우에도 지중볼트를 지면 또는 지압판이나 PC 판넬에 대해 대해 경사지게 설치함으로써 부지의 이용성을 증대시킬 수 있다.5. As shown in FIG. 5, drill the underground bolt hole on the
이하 첨부 도면에 도시된 구체적인 실시예를 통해 본 발명의 기술 내용을 상세히 설명하면 다음과 같다.Hereinafter, the technical contents of the present invention will be described in detail with reference to specific embodiments illustrated in the accompanying drawings.
먼저 본 발명에 의한 옹벽의 시공 과정을 보면, 첫째, 옹벽을 구성하기 위한 상단부에서 1.5m 구간을 절토작업(절토구배 1:0.2)을 한다(도면 2. 가). 상단부에서 절토작업을 하는 것은 기존의 PEM옹벽과 같으나, 기존의 PEM 옹벽은 한번에 3.0m이상을 굴토작업하므로 절취면 경사가 본 발명보다 완만하게 형성되어 부지 이용성이 저하된다.First, when the construction process of the retaining wall according to the present invention, first, the 1.5m section at the upper end for constituting the retaining wall is cut (cut gradient 1: 0.2) (Fig. 2. A). Cutting work at the upper end is the same as the conventional PEM retaining wall, but the existing PEM retaining wall is excavated more than 3.0m at a time, so that the slope of the cut surface is formed more smoothly than the present invention, the site availability is reduced.
둘째, 절토경사부에서 소정의 간격을 두고, 일렬로 소정의 직경을 가진 지중볼트 구멍을 수평, 혹은 경사방향으로 소정 깊이만큼 천공한다(도면 2. 나). 지중볼트구멍을 천공하는 것은 기존의 PEM옹벽과 같으나, 기존의 수평방향 천공과는 달리 지면에 대해 수평 혹은 경사방향으로 천공을 함으로써 역학적으로 우수하며, 부지활용성도 유리하게 된다. 즉, 도 7에서와 같이 원지반의 결이 형성되어 있는 경우는 원지반의 결에 대해 수직방향으로 지중볼트를 설치함으로써 원지반의 결에 대해 지중볼트가 비스듬히 설치되는 것에 비해 지반의 봉합효과를 크게 할 수 있다는 장점이 있고, 도 8에서와 같이 토지의 경계 등으로 인해 지중볼트가 지중에서 일정 영역을 넘어가서는 안 되는 경우에 일정 길이의 지중볼트를 매설하기 위해서 지중볼트를 지면에 대해 경사지게 설치함으로써 지중볼트의 수평설치길이를 감소시켜 부지의 이용성을 증대시킬 수 있다. 즉, 도8에서 지중볼트의 수평설치길이가 감소하는 만큼(절토량을 늘려) 절취면을 더 안쪽으로 이동시킬 수 있게 되어 그만큼 이용공간을 늘릴 수 있게 된다.Second, at a cut slope, drill underground bolt holes having a predetermined diameter in a line or at a predetermined depth in a horizontal or inclined direction at predetermined intervals (Fig. 2B). Drilling the underground bolt hole is the same as the existing PEM retaining wall, but unlike the conventional horizontal drilling, it is mechanically excellent by drilling in the horizontal or inclined direction with respect to the ground, and the site utilization is also advantageous. That is, in the case where the grain of the ground is formed as shown in FIG. 7, the ground bolt is installed in the vertical direction with respect to the grain of the ground, thereby increasing the sealing effect of the ground as compared with the ground bolt installed at an angle to the grain of the ground. 8, the ground bolts are inclined with respect to the ground in order to bury the ground bolts of a certain length when the ground bolts should not go over a certain area in the ground due to the boundary of the land as shown in FIG. By reducing the installation length, the usability of the site can be increased. That is, in FIG. 8, the cutting surface can be moved further inward as the horizontal installation length of the ground bolt decreases (by increasing the amount of cut), thereby increasing the use space.
셋째, 천공된 지중볼트구멍에 지중볼트를 삽입한 후 시멘트 모르타르 등으로 지중볼트구멍에 그라우팅을 실시한다.(도면 2 다)Third, insert the ground bolt into the perforated ground bolt hole and grout the ground bolt hole with cement mortar.
넷째. 그라우팅이 양생된 후 지압판을 지중볼트에 끼우고 지중볼트를 인장하 여 너트를 체결한다(도면 2. 라). 기존의 PEM옹벽은 6.0m 굴토 후 PC 판넬을 지압판으로 이용해 인장함으로써(도면 1. 차), 옹벽 형성 메카니즘에서 중요한 인장이 늦어짐에 따라 원래 지반의 이완(느슨해짐)을 허용하는데 반해 본 발명의 경우에는 1.5m 단위로 지압판을 이용해서 인장을 해줌으로써 보다 역학적으로 우수한 메카니즘을 갖게 된다.fourth. After the grouting is cured, insert the pressure plate into the ground bolts and tension the ground bolts to tighten the nuts (Fig. 2. D). Existing PEM retaining wall is tensioned using a PC panel as a pressure plate after 6.0 m of excavation (Fig. 1), which allows the original ground to loosen (loose) as a significant tension is delayed in the retaining wall forming mechanism. The tension is applied by using a pressure plate in the unit of 1.5m to have a more mechanically superior mechanism.
다섯째, 지압판 상부에 PC 판넬을 덮어서 지중볼트와 너트를 체결함으로써 일체 구조를 형성한다(도면 2. 마). 이때 지압판은 PC 판넬 하부에 위치하게 되고, 지중볼트를 통해서 일체로 결합되므로 지압판이 설치되지 않은 부분에 대해서도 원래지반에 압축력을 전달하게 된다.(도면 5. 나)Fifth, cover the PC panel on the top of the pressure plate to form an integral structure by fastening the ground bolt and the nut (Fig. 2. E). At this time, the pressure plate is located in the lower part of the PC panel, it is coupled integrally through the underground bolt, so that the compressive force is transmitted to the original ground even for the part where the pressure plate is not installed.
여섯째, 상단부 하부 1.5m 구간을 절토하여 도 2. 가부터 도 2. 마의 과정을 되풀이하여 소단이 형성되는 소정의 높이까지 작업을 반복하여 옹벽을 축조한다(도면 2. 사). 기존의 PEM옹벽은 소단에서부터 PC 판넬을 상부로 축조한 후 원래 지반과 사이를 뒤채움재로 다져넣는 방식으로 시공하나, 본 발명의 경우는 원래지반이 풍화토 또는 풍화암층처럼 굴토 면을 매끄럽게 정리할 수 있을 경우에는 상부에서부터 PC 판넬을 설치할 수도 있고, 굴토면이 암반으로 형성되어 굴착면을 매끈하게 정리할 수 없을 시는 지압판을 이용해서 암반지반을 1차로 인장시킴으로써 안정성을 확보한 뒤 소정의 소단위치 굴착작업 후 PC 판넬을 상부로 설치하게 되며, 이 경우 종래의 시공방법에 비해 면을 정리하기 위해 깍아 내는 공간이 적기 때문에 기존 PEM옹벽보다 뒤채움 면적을 축소시킬 수 있다(도면 6).Sixth, the lower 1.5m section of the upper part is cut to repeat the process of Figure 2. A to 2. E to repeat the operation to a predetermined height to form a small step to build the retaining wall (Fig. 2. G). Existing PEM retaining wall is constructed by compacting the PC panel from the end to the original ground and then filling it with the backing material, but in the case of the present invention, when the original ground can clean up the oyster surface smoothly like weathered soil or weathered rock layers. PC panel can be installed from the upper part. If the excavation surface is formed by rock, the excavation surface can not be smoothly arranged. The PC panel is installed at the top, and in this case, since the space for cutting the surface is less than that of the conventional construction method, the backfill area can be reduced than the conventional PEM retaining wall (Fig. 6).
일곱째, 소단 설치 위치에서는 소단과 접하는 PC 판넬 하부는 원래 지반의 특성에 따라서 필요시 현장타설 콘크리트 기초를 설치하거나, 기 제작된 기초블럭을 설치하며 필요시 콘크리트 기초에 기초 고정용 지중볼트를 설치한다(도면 2. 사). 이때 형성되는 콘크리트는 소단 배수로로 활용이 가능토록 한다.Seventh, in the small installation position, the lower part of the PC panel which is in contact with the small stage is installed on-site concrete foundation if necessary according to the characteristics of the original ground, or a pre-fabricated foundation block is installed. (Fig. 2. G). The concrete formed at this time can be utilized as a small drainage channel.
여덟째, 소단하부 1.5m 구간을 절토작업 후 도면 2. 가에서부터 도면 2. 사까지의 공정을 반복하여 원하는 높이의 옹벽을 축조한다(도면 2. 아).Eighth, after cutting the small 1.5m section of the small step, repeat the process from Figure 2. A to Figure 2. 4 to build a retaining wall of the desired height (Fig. 2. A).
이상에서 설명한 바와 같이, 본 발명 옹벽은 절토 원래 지반면에 접하는 지압판을 통해서 지반의 이완(느슨해짐)을 직접 방지하고, 1.5m 마다 PC 판넬 설치시 지압판과 일체로 결합함으로 보강 메카니즘이 완성된다. 즉, 원래지반은 지중볼트와 지압판으로 원래지반을 절취면이 아닌 반대방향으로 미는 역학적구조로 1차 보강이 완료되며(도면 5. 가), 2차 보강으로 PC 판넬 전면이 원래지반을 압축하게 됨으로 원래지반의 안정성을 확보하게 되는 것이다(도면 5. 나). 이와 같은 방법으로 1.5m마다 절취와 보강옹벽이 완성되므로 지반의 이완을 최소화하며 옹벽의 시공이 가능하게 된다.As described above, the retaining wall of the present invention directly prevents the loosening of the ground through the pressure plate in contact with the original ground surface of the cut, and reinforces the mechanism by combining the pressure plate when the PC panel is installed every 1.5 m. In other words, the original ground is a ground bolt and a pressure plate with a mechanical structure that pushes the original ground in the opposite direction rather than the cut surface (fig. 5. A). Secondary reinforcement allows the front of the PC panel to compress the original ground. This will ensure the stability of the original ground (Fig. 5. b). In this way, the cutting and reinforcing retaining walls are completed every 1.5m, thus minimizing the loosening of the ground and allowing the construction of the retaining walls.
본 발명에 의한 지압판과 PC 판넬, 그리고 지중볼트의 결합구조에 대해 설명하면 다음과 같다. 도3에 나타난 바와 같이 철재 또는 콘크리트재 등으로 제작된 지압판(11) 중심부에 지중볼트가 통과되는 구멍을 형성하여 상기 구멍에 지중볼트가 삽입되도록 한 후 지중볼트를 인장하여 고정너트(11)를 체결하여 고정시키고, 지압판을 통과하여 연장된 상기 지중볼트를 다시 PC 판넬(9)에 결합한다. PC 판넬은 그 배면에 너트와 결합된 지압판이 삽입될 수 있는 정착홈(15)이 형성되고 그 전면 중앙에는 지중볼트를 고정너트를 체결하기 위한 오목부(16)가 형성되며 인접 한 PC 판넬을 고정핀(13')으로 서로 결합하기 위한 고정핀 구멍(13)이 PC 판넬의 가장자리나 네 귀퉁이 부분에 형성된다. 절취면의 여건에 따라 지압판이 PC 판넬의 정착홈에 삽입된 채 설치될 수도 있고 지압판과 PC 판넬 사이에 뒤채움이 된 경우 지압판이 PC 판넬의 정착홈에 삽입되지 않고 서로 이격되어 설치될 수도 있으나 두 경우 모두 동일한 지중볼트를 통해 지압판과 PC 판넬이 일체화되어 설치된다. 또한 지중볼트가 지면에 대해 경사지게 설치되는 경우 또는 지중볼트가 지압판이나 PC 판넬에 대해 수직방향이 아니라 경사지게 설치되는 경우는 PC 판넬 배면부(92)의 정착홈(15)과 전면부(91)의 오목부(16) 내에 레벨링 블록(12, 12')을 설치하여 지중볼트(3)의 설치방향에 대해 지압판(8)과 고정너트(11)가 수직으로 설치되도록 하여 압축력이 최대로 작용할 수 있도록 한다. 레벨링 블록의 규격은 지중볼트의 설치 각도에 따라 제작하고 그 재질은 강성 또는 다소의 탄성을 갖는 적당한 재질로 제작할 수 있는데 철재나 콘크리트로 제작할 수도 있다. 지압판이 PC 판넬 배면부의 정착홈에 삽입될 경우뿐만 아니라 지압판이 PC 판넬과 이격되어 설치되는 경우에도 지압판이 지중볼트에 대해 수직이 되도록 레벨링 블록(12)을 현장에서 당업자가 적당한 방법으로 설치할 수 있다. 지중볼트를 수평으로 설치할 경우 PC 판넬의 오목부(16)는 원형으로, 지중볼트를 경사지게 설치할 경우 PC 판넬의 오목부(16)는 타원형으로 제작할 수도 있고 또한 경사지게 설치할 경우 PC 판넬에 형성된 지중볼트 통과 구멍은 그 내부에 경사지게 제작할 수도 있고 또는 그 내부에서 지중볼트의 경사각도가 조절될 수 있도록 지중볼트의 통과구멍을 다소 크게 제작하여 레벨링 블록과 고정너트를 통해 지중볼트를 경사지게 고정할 수도 있다.Referring to the coupling structure of the pressure plate and the PC panel, and the ground bolt according to the present invention. As shown in FIG. 3, a hole through which the underground bolt passes is formed in the center of the
본 발명은 레벨링 블록을 이용한 방법 이외에도 당업자가 용이하게 할 수 있는 다양한 방법으로 지중볼트를 경사지게 설치하도록 하는 다른 변형된 실시 형태를 본 발명의 권리범위에서 배제하지 않는다.The present invention does not exclude, in addition to the method using the leveling block, other modified embodiments which allow the underground bolt to be inclined in various ways that can be easily made by those skilled in the art.
이상에서 살펴본 바와 같이, 본 발명의 옹벽 시공방법은 첫째, 기존공법에 비하여 한번에 보강이 마무리되는(지중볼트가 인장되어 지압판이 체결되는) 높이가 줄어들게 되므로 지반의 이완(느슨해짐)을 최소화 할 수 있어 안정성이 증가하게 되고 지압판과 PC판넬이 지중볼트를 통해 일체로 결합되어 절취된 지반을 지압판으로 1차 보강한 후 PC판넬로 2차 보강함으로써 절취사면 안정성이 훨씬 증대된다. 둘째, 지중볼트(Earth Bolt)를 수평은 물론 경사방향으로도 설치가 가능하게 되어 구조적 안정성이 증가되고 부지 활용성이 증대 된다. 셋째, 암반 절취면의 경우에도 지압판으로 1차 보강이 완료됨에 따라 기존공법에 비교하여 뒤채움 량이 줄어들 수 있어 부지 활용성이 증대하고, 경제적인 시공이 될 수 있다. 넷째, PC 판넬이 적층되어 고정되는 기존의 방식에 비해 본 발명에 의한 PC 판넬은 주로 지중볼트와의 결합에 의한 고정력에 의해 부착되므로 PC판넬이 손상되거나 교체해야 하는 경우 교체할 필요가 있는 해당 판넬만을 교체하면 되므로 유지보수에 있어서 훨씬 편리하고 경제적이다.As described above, the retaining wall construction method of the present invention is the first, compared to the existing method to reduce the height of the ground (loose) is reduced because the reinforcing is finished at a time (the ground bolt is tensioned and the pressure plate is fastened) is reduced. Stability is increased, and the pressure plate and the PC panel are integrally coupled through the underground bolts to reinforce the cut ground first with the pressure plate, and then to the secondary reinforcement with the PC panel. Second, the ground bolts can be installed horizontally as well as in the inclined direction, thereby increasing structural stability and increasing site utilization. Third, even in the case of rock cutting surface, as the primary reinforcement is completed with acupressure plate, the backfilling amount can be reduced compared to the existing method, so the site utilization can be increased and economical construction can be achieved. Fourth, the PC panel according to the present invention is attached by a fixing force mainly by coupling with the ground bolt, compared to the existing method that the PC panel is laminated and fixed, the corresponding panel that needs to be replaced when the PC panel is damaged or must be replaced It is much more convenient and economical to maintain because it only needs to be replaced.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020070034048A KR100854551B1 (en) | 2007-04-06 | 2007-04-06 | Acupressure plate and PC panel combined retaining wall structure and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020070034048A KR100854551B1 (en) | 2007-04-06 | 2007-04-06 | Acupressure plate and PC panel combined retaining wall structure and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20070043757A KR20070043757A (en) | 2007-04-25 |
| KR100854551B1 true KR100854551B1 (en) | 2008-08-26 |
Family
ID=38178076
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020070034048A Expired - Fee Related KR100854551B1 (en) | 2007-04-06 | 2007-04-06 | Acupressure plate and PC panel combined retaining wall structure and construction method |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100854551B1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100935317B1 (en) * | 2009-08-21 | 2010-01-06 | 주식회사 비엔디코퍼레이션 | Assembly retaining wall system with ground reinforcement and its construction method |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100858315B1 (en) * | 2008-04-08 | 2008-09-11 | 박태영 | Lengthening member for greening method and slope stability by creating flower bed of environmentally friendly slope stability |
| KR102264830B1 (en) * | 2019-07-01 | 2021-06-15 | 송영수 | Block for constructing inclined plane retaining wall and its constructing method |
| KR200495648Y1 (en) * | 2020-04-25 | 2022-07-15 | 강성호 | landscape block device for pressure plate of grouting anchor unit |
| KR102307686B1 (en) * | 2021-01-05 | 2021-09-30 | 최웅열 | Retaining wall block and the construction method for the same |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05202527A (en) * | 1992-01-29 | 1993-08-10 | Fujita Corp | How to construct a structure using diagonal permanent anchors |
| KR20000059203A (en) * | 2000-07-21 | 2000-10-05 | 최영식 | Retaining Wall Construction Method |
| KR200253355Y1 (en) * | 2001-08-03 | 2001-11-22 | 정성필 | Greening construction that prevents slope collapse. |
| KR100468035B1 (en) * | 2002-06-19 | 2005-01-27 | 주식회사 도담이앤씨 | A Precast Concrete Block for Retaining-Wall and Construction Method of Retaining-Wall for using Top-down Method |
| KR100650392B1 (en) * | 2005-11-08 | 2006-11-27 | 조영현 | Retaining wall structure and construction method |
-
2007
- 2007-04-06 KR KR1020070034048A patent/KR100854551B1/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05202527A (en) * | 1992-01-29 | 1993-08-10 | Fujita Corp | How to construct a structure using diagonal permanent anchors |
| KR20000059203A (en) * | 2000-07-21 | 2000-10-05 | 최영식 | Retaining Wall Construction Method |
| KR200253355Y1 (en) * | 2001-08-03 | 2001-11-22 | 정성필 | Greening construction that prevents slope collapse. |
| KR100468035B1 (en) * | 2002-06-19 | 2005-01-27 | 주식회사 도담이앤씨 | A Precast Concrete Block for Retaining-Wall and Construction Method of Retaining-Wall for using Top-down Method |
| KR100650392B1 (en) * | 2005-11-08 | 2006-11-27 | 조영현 | Retaining wall structure and construction method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100935317B1 (en) * | 2009-08-21 | 2010-01-06 | 주식회사 비엔디코퍼레이션 | Assembly retaining wall system with ground reinforcement and its construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20070043757A (en) | 2007-04-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100917044B1 (en) | Anchor-integrated double wall concrete retaining wall construction method | |
| KR102264250B1 (en) | Block style reinforced soil retaining wall and constructing method thereof | |
| US20140270990A1 (en) | Precast concrete retaining wall | |
| JP2009084919A (en) | Ground excavation method | |
| KR101957263B1 (en) | Retaining wall assembly and construction method thereof | |
| KR100854551B1 (en) | Acupressure plate and PC panel combined retaining wall structure and construction method | |
| KR20140013497A (en) | Method for constructing block type reinforced retaining wall in cut site | |
| KR101149895B1 (en) | Reinforcement block for pillar of tunnel | |
| KR20120106037A (en) | Reformed sheet plate and the method of installation of the same | |
| KR101077348B1 (en) | retaining wall and construction method thereof | |
| KR101077949B1 (en) | Block for reinforcement and construction method | |
| KR101211469B1 (en) | Retaining wall structure having prefabricated block and method for constructing retaining wall using the same | |
| KR102127377B1 (en) | Construction Method of Reinforced Earth Retaining Wall | |
| KR100984040B1 (en) | Method of reinforced earth retaining wall for cutting face through double reinforcing execution | |
| KR101015619B1 (en) | Adjustable fasteners for reinforcement retaining wall construction | |
| KR102079570B1 (en) | Soil nailing slope reinforcement system to panel | |
| JP5777435B2 (en) | Reinforcement method for foundations for small buildings | |
| KR102490872B1 (en) | Reinforced earth retaining wall and construction method using tensile force of steel rod piles | |
| KR100372821B1 (en) | Passive reinforced nail wall for cutting slope | |
| KR101032408B1 (en) | Construction Method of Reinforced Soil Retaining Wall Using Line Reinforcement Column and Concrete Block | |
| KR100935317B1 (en) | Assembly retaining wall system with ground reinforcement and its construction method | |
| KR20090049132A (en) | Ground reinforcement device and ground reinforcement method using the same | |
| KR101590057B1 (en) | Ground attachment type retaining wall structure for easy construction of round part | |
| KR101544756B1 (en) | Retaining wall block construction method using stone | |
| JP5830068B2 (en) | Slope reinforcement method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20110821 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20110821 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |