WO1998031877A1 - Ancrage par tubes et procede de fabrication - Google Patents

Ancrage par tubes et procede de fabrication Download PDF

Info

Publication number
WO1998031877A1
WO1998031877A1 PCT/FI1998/000039 FI9800039W WO9831877A1 WO 1998031877 A1 WO1998031877 A1 WO 1998031877A1 FI 9800039 W FI9800039 W FI 9800039W WO 9831877 A1 WO9831877 A1 WO 9831877A1
Authority
WO
WIPO (PCT)
Prior art keywords
tube
fundament
tubes
steel
anchoring
Prior art date
Application number
PCT/FI1998/000039
Other languages
English (en)
Inventor
Jyrki Tarkkonen
Original Assignee
Jyrki Tarkkonen Oy
Rautaruukki Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jyrki Tarkkonen Oy, Rautaruukki Oy filed Critical Jyrki Tarkkonen Oy
Priority to EP98900871A priority Critical patent/EP0960241A1/fr
Publication of WO1998031877A1 publication Critical patent/WO1998031877A1/fr
Priority to NO993506A priority patent/NO993506L/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2269Mounting poles or posts to the holder in a socket
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Definitions

  • the present invention relates to a method for manufacturing a tube fundament for a mast, especially for an elec- trifying mast of a railway line, as well as a tube fundament of this kind.
  • a significant problem related to the installation is caused by a rock close to the surface of the ground, which hinders a rapid progress of the installation work and increases work expenses, because it is necessary to mobilize a special work team to quarry the rock hindering the installation.
  • an electrifying mast for railway lines is founded in the ground so that a hole, having a diameter of about 400 mm and a depth of about 4 m, is drilled into the ground, a steel tube element of substantially same size is introduced into the hole, the upper end of which is provided with a plate for the attachment of the electrifying mast, concrete glue is pumped into the steel tube under pressure until the concrete glue is pressed out through an aperture provided around the tube.
  • a drawback related to this previously known method is that a tube to be driven into the ground as well as the driving equipment are in the practice so massive that said equipment must be installed in railway carriage, where-fore the railway line to be electrified cannot be in normal operation during the installation. For said reasons, the installation involves great total expenses also by this method.
  • the invention relates also to a tube fundament for a mast, especially for an electrifying mast of a railway line, which tube fundament is characterized by at least two steel tubes driven adjacently into the ground and filled with concrete and forming a small angle with each other, an anchoring tube embedded in the concrete filled into each steel tube, whereby the upper end of the anchoring tube is provided with means for the attachment of said anchoring tube to the attachment means of the other anchoring tubes of the tube fundament as well as a plate for the attachment of the mast, which plate is attached to one of the attachment means.
  • the steel tubes can be driven into the ground from railway embankment so that the passing traffic will not be disturbed.
  • a significant cost saving is reached by the fact that when using a tube having a diameter of about 200 mm, it is still possible to use an eccentrical driving method, whereby it is economical to leave said steel tube direct- ly in place as fundament. Said driving method does not work in a satisfactory manner, if said tube has a diameter of approximately 400 mm, which tube size must be used in a single-tube fundament for an electrifying mast of a railway line.
  • the moment directed to an electrifying mast is different in the direction of the railway line and vertically to said line, which fact can easily be taken into consideration when the fundament comprises more than one steel tube.
  • the skin friction between the tubes and the ground can be utilized, whereby also the stiffness (strength) of the system can be utilized.
  • the method and the tube fundament according to the present invention is suitable for all ground conditions. No excavations are needed, and each fundament can be dimensioned individually without any difficulties.
  • the tube fundament is ideal for an electrifying mast of a railway line, because the length of each tube to be driven into the ground, can be determined individually in each case in accordance with the ground conditions. Therefore, it is possible to provide an individual fundament for each mast, when necessary, which enables to secure that the fundament works reliably.
  • the occurrence of a rock close to the surface of the ground is especially desir- able when using the tube fundament according to our invention, because a tube driven to a depth of 0,5 metres of an unbroken rock constitutes an ideal fundament for masts of all kinds.
  • the tube fundament according to the invention is well suitable also for the use as a fundament for noise barriers or other protective fences and portals.
  • Fig. 1 shows a diagrammatic representation of an embodiment of a tube fundament according to the invention, intended for an electrifying mast of a railway line,
  • Fig. 2 shows a side view of an anchoring tube for a steel tube to be driven into the ground vertically
  • Fig. 3 shows a bottom view of the anchoring tube shown in Fig. 2,
  • Fig. 4 shows a side view of an anchoring tube for a steel tube to be driven into the ground diagonally
  • Fig. 5 shows a bottom view of the anchoring tube shown in Fig. 4.
  • the tube fundament comprises at least two steel tubes 1 to be driven adjacently into the ground, which, after having been driven into the ground, are filled with con- Crete 2.
  • a steel anchoring tube 3a, 3b is introduced or inserted into each steel tube 1 filled with the concrete 2, the upper end of said anchoring tube is provided with means 4a, 4b for the attachment of said anchoring tubes 3a, 3b to the corresponding attachment means 4b, 4a of the other anchoring tubes 3b, 3a of the tube fundament, as well as to the mast 5 to be founded.
  • the position of the anchoring tubes 3a, 3b is adjusted so that the attachment means 4a and 4b will be positioned horizontally one upon another, and the attachment means 4a and 4b are attached to each other, for instance by means of bolts.
  • the mast 5 to be founded can be erected and attached to an attachment plate 6 welded to an upper surface of the upper attachment means 4a.
  • the consistency of the concrete 2 is such that the anchoring tubes 3a, 3b, together with the attachment means 4a, 4b thereof, remain in the accurately adjusted position during the hardening process. Due to this, the fine adjustment of the attachment means 4a, 4b can easily be carried out while introducing the bond tubes 3a, 3b into the concrete 2 in the steel tubes 1.
  • ground consists of several earth layers (stratums), wherefore the ground is generally non-homogeneous, anisotropic and discontinuous. Due to the discontinuity, rules of stress-strain dependence of a material which are derived in the mechanics of solid matter, are not applicable to ground materials. The mechanical properties of ground materials are affected by various factors such as particle form, particle size distribution and the density of the ground.
  • a deformation generally will comprise an elastic part and a plastic part.
  • Characterizing properties of ground materials are an unlinear elastic behaviour, hysteresis and Bauschinger phenomenon.
  • a gap appearing behind the tube fundament and local collapsing of the ground are the main reasons for unlinear load-dislocation behaviour.
  • the hysteresis phenomenon means a non-uniform load and release stress-strain path.
  • the Bauschinger phenomenon means the fall of yield stress when the direction of load changes .
  • Side capacity of the tube fundament means the greatest horizontal load resistance of the tube fundament, which corresponds to the collapse load of the ground or the yield moment of the tube fundament.
  • the side capacity comprises the resistance of the surrounding ground and the flexural strength of the tube fundament.
  • the permiss- ible side capacity is often determined by the permissible horizontal dislocation, because deformations may grow significantly much before the side capacity corresponding to the collapse load of the ground or of the pile is exceeded.
  • the flexural strength of the tube fundament according to the invention is extremely good, especially at the upper end of the tube fundament, due to the strength of the system, which is achieved by the cooperation of the steel tubes 1, the concrete 2 casted to said tubes 1, the anchoring tubes 3a, 3b and the attachment means 4a, 4b.
  • the tube fundament according to the invention comprising two adjacent steel tubes, it is possible rea- sonably to utilize the knowledge that the moment directed to an electrifying mast in the direction of the line differs from the moment directed to it perpendicularly to the line. Due to this, the steel tubes 1 are driven into the ground as shown in figure 1 so that the steel tubes 1 of each fundament, after they have been driven down into the proper position, are located on opposite sides of the mast line to be erected, whereby said tubes are directed so that a small angle is formed between them.
  • the first steel tube 1 is driven down entirely vertically into the embankment of the railway line, outside the mast line to be erected, and the other steel tube 1 is driven down into the embankment in the area between the railway line and the mast line to be erected, whereby this other tube is driven down slightly diagonally, preferably at an angle of about 10 degrees to about 20 degrees with respect to the vertical level, so that the lower end of the steel tube 1 extends below the railway line.
  • the anchoring tube 3b shown in Figs. 4 and 5, which is provided with the attachment means 4b, is introduced into the diagonally positioned steel tube 1 filled with concrete 2.
  • Said attachment means 4b having a shape of an upwards open U-beam, is welded to the upper end of the anchoring tube 3b so that said attachment means 4b, when the anchoring tube 3b is properly positioned in the diagonally positioned steel tube 1, will be positioned entirely horizontally, when directed towards the verti- cally positioned steel tube 1.
  • the anchoring tube 3a shown in Figs. 2 and 3, which is provided with the attachment means 4a, is introduced into the vertically positioned steel tube 1 filled with concrete 2 so that the attachment means 4a will be positioned upon the attachment means 4b.
  • the attachment means 4a has a shape of a downwards open U-beam and is entirely perpendicularly welded to the upper end of the anchoring tube 3a.
  • the attachment means 4a is so much broader than the attachment means 4b that said prior installed attachment means 4b fits into the attachment means 4a.
  • the plate 6 for the attachment of the mast 5 is welded to the upper surface of the attachment means 4a. After the installation and the fine adjustment of both anchoring tubes 3a and 3b, the attachment means 4a and 4b are attached to each other, for instance by means of bolts.
  • the attachment means 4b is provided preferably with three centrically located threaded fixing holes 7, and the attachment means 4a is provided correspondingly with three centrically situated fixing apertures 8, through which the bolts to be screwed into the attachment holes 8 are brought, and due to which apertures 8 the mutual position of the attachment means 4a and 4b can practically be regulated in accordance with the mutual distance of the installed steel tubes 1 of the tube fundament.
  • the plate 6 for the attachment of an electrifying mast has preferably a rectangular shape and is provided with holes ( 9 ) or corresponding means for the attachment of the electrifying mast 5 to the tube fundament, for instance by means of bolts.
  • the surfaces of the attachment means 4a and 4b and the upper ends the bond tubes 3a and 3b are treated. Suitable surface treatment is for instance hot galvanizing.
  • a cutter shoe In order to facilitate the driving of the steel tube 1 into the ground, a cutter shoe, known as such, is attacted to the lower end of the steel tube.
  • the steel tube 1 to be driven into the ground may have a length of between 1 500 mm to 6 000 mm, a diameter of between 114 mm to 273 mm and a wall thickness of between 4 mm to 12 mm.
  • the anchoring tube 3a and 3b may have a length of between 1 000 mm to 2 000 mm, a diameter of between 85 mm to 170 mm and a wall thickness of between 5 mm to 25 mm.
  • the plate 6 for the attachment of the mast 5 is to be dimensioned in accordance with the bottom plate of the mast 5 to be erected, and may e.g. for an electrifying mast 5 of a railway line have a rectangular shape and a length of 524 mm, a width of 400 mm and a thickness of 20 mm.
  • a steel tube 1 to be driven into the ground, used in the double-tube fundament for an electrifying mast 5 of a railway line has a diameter of 193 mm and a wall thickness of 4 mm.
  • an additional thick- walled steel tube 11 having a diameter of 168 mm and a wall thickness of 10 mm, is first embedded in the concrete, and only thereafter the bond tube 3a respectively 3b together with their attachment means 4a respectively 4b, are introduced into the concrete.
  • the steel tubes 1 are first driven into the ground for the tube fundaments for all masts 5 to be erected and only after the driving works are carried out, the steel tubes 1 are filled with concrete 2 and the other parts 11, 3a, 3b of the tube fundament are introduced and installed in the manner described above.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

La présente invention concerne un procédé de réalisation d'un ancrage par tubes (5), particulièrement destiné à un poteau d'électrification de voie de chemin de fer. L'invention concerne également un encrage par tubes réalisé selon ce procédé. L'invention est caractérisée en ce qu'au moins deux tubes d'acier (1) sont enfoncés côte à côte dans le sol, que chaque tube d'acier (1) est rempli de béton (2), qu'un tube d'ancrage (3a, 3b) est introduit dans chaque tube d'acier (1) rempli de béton (2), que l'extrémité supérieure du tube d'ancrage considéré est équipée d'organes permettant la fixation (4a, 4b) dudit tube d'ancrage (3a, 3b), d'une part aux organes de fixation (4a, 4b) correspondants des autres tubes d'ancrage (3a, 3b) de l'ancrage par tubes, et d'autre part au poteau (5), et que la position des tubes d'ancrage (3a, 3b) fait l'objet d'une reprise avant la prise du béton (2).
PCT/FI1998/000039 1997-01-17 1998-01-19 Ancrage par tubes et procede de fabrication WO1998031877A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP98900871A EP0960241A1 (fr) 1997-01-17 1998-01-19 Ancrage par tubes et procede de fabrication
NO993506A NO993506L (no) 1997-01-17 1999-07-16 Rörfundament og fremgangsmÕte for tilvirkning av dette

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI970017U FI2894U1 (fi) 1997-01-17 1997-01-17 Putkiperustus
FIU970017 1997-01-17

Publications (1)

Publication Number Publication Date
WO1998031877A1 true WO1998031877A1 (fr) 1998-07-23

Family

ID=8547418

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI1998/000039 WO1998031877A1 (fr) 1997-01-17 1998-01-19 Ancrage par tubes et procede de fabrication

Country Status (4)

Country Link
EP (1) EP0960241A1 (fr)
FI (1) FI2894U1 (fr)
NO (1) NO993506L (fr)
WO (1) WO1998031877A1 (fr)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1205605A3 (fr) * 2000-11-13 2003-05-07 Gebr. van Leeuwen Harmelen B.V. Méthode pour stabiliser un bloc de base de portique ferroviaire
FR2846676A1 (fr) * 2002-11-05 2004-05-07 Eurl Midi Pyrenees Antennes Fondations d'un pylone ou similaire
WO2007110892A3 (fr) * 2006-03-28 2007-11-22 Co Ge P I S R L Système modulaire pour la réalisation de fondations pour supports de lignes aériennes et/ou pieux de support
WO2007141376A1 (fr) * 2006-06-02 2007-12-13 Rautaruukki Oyj Dispositif de construction de fondations
CN100424280C (zh) * 2006-04-05 2008-10-08 赵正义 桅杆式机械设备新型基础
JP2016056625A (ja) * 2014-09-11 2016-04-21 東日本旅客鉄道株式会社 柱体倒壊防止構造
DE102016217793A1 (de) * 2016-06-17 2017-12-21 Heicon Service Gesellschaft mbH Vorrichtung zur Verbindung einer Rammpfahlgründung mit einem Tragwerk und Verfahren zum Herstellen einer solchen Verbindung

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1484463A1 (de) * 1963-03-26 1969-01-23 Elek Sche Anlagen Gmbh Ges Vorrichtung und Verfahren zum Herstellen von Gruendungen fuer Freileitungsmaste
EP0102322A2 (fr) * 1982-07-28 1984-03-07 FIETZ & LEUTHOLD AG Dispositif et procédé pour l'enfoncement des poteaux de fondation pour des pylônes d'une voie ferrée
WO1993018253A1 (fr) * 1992-03-12 1993-09-16 Roeynestad Tom Toralv Pied de mat
US5437519A (en) * 1992-08-26 1995-08-01 Roger Bullivant Of Texas, Inc. Piles and pile forming methods

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1484463A1 (de) * 1963-03-26 1969-01-23 Elek Sche Anlagen Gmbh Ges Vorrichtung und Verfahren zum Herstellen von Gruendungen fuer Freileitungsmaste
EP0102322A2 (fr) * 1982-07-28 1984-03-07 FIETZ & LEUTHOLD AG Dispositif et procédé pour l'enfoncement des poteaux de fondation pour des pylônes d'une voie ferrée
WO1993018253A1 (fr) * 1992-03-12 1993-09-16 Roeynestad Tom Toralv Pied de mat
US5437519A (en) * 1992-08-26 1995-08-01 Roger Bullivant Of Texas, Inc. Piles and pile forming methods

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1205605A3 (fr) * 2000-11-13 2003-05-07 Gebr. van Leeuwen Harmelen B.V. Méthode pour stabiliser un bloc de base de portique ferroviaire
FR2846676A1 (fr) * 2002-11-05 2004-05-07 Eurl Midi Pyrenees Antennes Fondations d'un pylone ou similaire
WO2007110892A3 (fr) * 2006-03-28 2007-11-22 Co Ge P I S R L Système modulaire pour la réalisation de fondations pour supports de lignes aériennes et/ou pieux de support
CN100424280C (zh) * 2006-04-05 2008-10-08 赵正义 桅杆式机械设备新型基础
WO2007141376A1 (fr) * 2006-06-02 2007-12-13 Rautaruukki Oyj Dispositif de construction de fondations
EP2024575A4 (fr) * 2006-06-02 2010-01-13 Rautaruukki Oyj Dispositif de construction de fondations
JP2016056625A (ja) * 2014-09-11 2016-04-21 東日本旅客鉄道株式会社 柱体倒壊防止構造
DE102016217793A1 (de) * 2016-06-17 2017-12-21 Heicon Service Gesellschaft mbH Vorrichtung zur Verbindung einer Rammpfahlgründung mit einem Tragwerk und Verfahren zum Herstellen einer solchen Verbindung
DE102016217793B4 (de) * 2016-06-17 2019-11-14 Heicon Service Gesellschaft mbH Vorrichtung zur Verbindung einer Rammpfahlgründung mit einem Tragwerk und Verfahren zum Herstellen einer solchen Verbindung

Also Published As

Publication number Publication date
NO993506D0 (no) 1999-07-16
FI2894U1 (fi) 1997-05-20
FIU970017U0 (fi) 1997-01-17
EP0960241A1 (fr) 1999-12-01
NO993506L (no) 1999-09-15

Similar Documents

Publication Publication Date Title
US4911582A (en) Concrete replacement wall and method of constructing the wall
KR20190036591A (ko) 프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법
EP1123443B1 (fr) Procede servant a fabriquer un sol de dalles et sol de dalles
WO2007058463A1 (fr) Appareil pour fixer un raidisseur
BR112012033713B1 (pt) sistema de reforço para uma âncora para estai
CA3196584A1 (fr) Systeme et procede de protection d'equipements de services publics sous une dalle contre des changements de volume affectant les sols
CN102650127A (zh) 一种预制钢砼混合结构u型板桩
CN114837088A (zh) 一种公路上承台的施工方法
GB2582167A (en) Apparatus and method for installation of vehicle restraint system
KR102560642B1 (ko) 마이크로파일을 이용한 복합파일 및 그 시공방법
EP0960241A1 (fr) Ancrage par tubes et procede de fabrication
WO2016187615A1 (fr) Ancrage de fondation
CN109024670B (zh) 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法
US20240240421A1 (en) Reticulated driven micropile footing system
KR20230110120A (ko) 시공 안전성을 높인 띠장의 설치 방법 및 그 구조
CA2942788C (fr) Methode d'installation de supports de ligne de transmission en hauteur sur les sols de pergelisol
KR20130121271A (ko) 흙막이벽의 앵커 지지 조립체 및 그를 이용한 흙막이벽 시공방법
JP6675427B2 (ja) ホームドアの基礎構造、その構築方法及びねじ込み治具
JP6940709B1 (ja) 擁壁及びその築造方法
CA3171566A1 (fr) Dispositif de reparation de poteau de cloture
CN211312225U (zh) 基于现有路面改造为桥梁的桩柱一体结构
US10077539B1 (en) Wall and retaining members and fluidizing installation of retaining members
DE102005013993B3 (de) Gründung für einen Hochwasserschutz
JP3351663B2 (ja) 斜面安定化工法に用いるアンカー定着用台座
EP1710355A1 (fr) Rideau souterrain mixed-in-place avec des poutres filigranes

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): FI JP NO PL RU US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 09331846

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1998900871

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1998900871

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: JP

Ref document number: 1998531386

Format of ref document f/p: F

WWW Wipo information: withdrawn in national office

Ref document number: 1998900871

Country of ref document: EP