WO2003033867A2 - A system and method for injecting gas into a hydrocarbon reservoir - Google Patents
A system and method for injecting gas into a hydrocarbon reservoir Download PDFInfo
- Publication number
- WO2003033867A2 WO2003033867A2 PCT/GB2002/004635 GB0204635W WO03033867A2 WO 2003033867 A2 WO2003033867 A2 WO 2003033867A2 GB 0204635 W GB0204635 W GB 0204635W WO 03033867 A2 WO03033867 A2 WO 03033867A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- gas
- facility
- underwater
- production
- production fluid
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/122—Gas lift
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/18—Repressuring or vacuum methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/40—Separation associated with re-injection of separated materials
Definitions
- the present invention relates to a system and method for injecting gas into a hydrocarbon reservoir.
- production fluid extracted from the hydrocarbon reservoir by production wells, is driven to a host facility by the natural pressure of the reservoir.
- the reservoir does not have enough natural pressure to drive the production fluid to the host facility which may be due to the production fluid comprising heavy, high density fluid that is essentially oil
- a means of increasing the reservoir pressure or decreasing the specific gravity of the fluid is required.
- the means may inject water from the host facility into the reservoir to boost its pressure.
- the means may inject gas into the reservoir to boost its pressure via injection wells separate from the production wells.
- a known system for injecting gas into a reservoir comprises connecting the host facility to a seabed facility with a high pressure pipeline, and at the seabed facility, manifolding the pipeline into separate flowlines connected to injection wells.
- the gas for injection is processed at the host facility to a predetermined specification to make it suitable for compression and high pressure transportation. This processing may comprise drying the gas.
- the gas is then compressed by at least one gas compressor at the host facility and is conveyed by the high pressure pipeline down to the seabed facility and on into the reservoir via the well flowlines and the injection wells.
- the gas for injection is compressed to a pressure at least as high as that of the pressure of the reservoir at the bottom of the wellbores of the injection wells after taking into account the pressure losses incurred in the pipeline and flowlines so that it is able to drive production fluid from the reservoir up to the production wells and on to the host facility.
- the gas pumped from the host facility may be used for a process known as "gas lift" in which gas is injected into production wells.
- the wellbore of each production well has riser tubing surrounded by an outer casing, the spacing between the tubing and the outer casing being known as the annulus. Gas is injected into the annulus and enters the tubing via perforations spaced along the length of the tubing and the gas combines with the heavy production fluid in the tubing to produce a less dense fluid. This enables the fluid to be lifted to the host facility by the well pressure.
- the gas used may be hydrocarbon gas which may be from the field being developed or from a nearby or separate field and any other suitable gas may be used.
- the pipeline and flowlines for both gas injection and gas lift which are required to convey the gas to the wells have to have pipe walls thick enough to withstand the high pressure of the gas.
- the cost of the pipeline itself and the installation costs are high. This is particularly so when there is a long tie-back.
- a system for injecting gas into a hydrocarbon reservoir comprising: a host facility having gas supply means; an underwater gas compressor remote from the host facility, and connected to the gas supply means by a pipeline; and at least one well connected to the underwater gas compressor, whereby the gas compressor is arranged to supply the gas received from the pipeline to the or each well and into the hydrocarbon reservoir to improve conveyance of production fluid at least towards the host facility.
- At least one said well may be an injection well, the gas compressor being arranged to drive gas into the hydrocarbon reservoir via the or each injection well at a pressure at least as high as the pressure of the production fluid in the reservoir to raise the overall pressure in the reservoir.
- At least one said well may be a production well, the gas compressor being connected to inject gas into production fluid in the or each production well, and the production well is considered to be part of the hydrocarbon reservoir.
- the gas compressor may be connected to the at least one well by at least one flowline which is able to withstand conveyed gas of a higher pressure than the pipeline between the host facility and the gas compressor.
- the gas compressor is preferably located at an underwater facility such as a seabed facility.
- an underwater facility such as a seabed facility.
- a pipeline able to convey gas at a high pressure is not required between the host facility and the underwater facility, as gas from the host facility is only at a high pressure once it has been compressed by the gas compressor of the underwater facility.
- the pipeline between the host facility and the underwater facility may have its pipe wall thickness reduced as it does not need to convey gas at such a high pressure. As there is a reduction in the quantity of pipe material for this pipeline, there is a significant cost saving.
- the host facility would preferably have at least one lower pressure gas compressor for driving gas to the high pressure gas compressor at the underwater facility.
- the pressure losses due to friction in the pipeline are reduced. Consequently, less power is required to compress the gas for injection, enabling gas compressors and their drive motors (which are preferably electric motors) at both the host facility and the underwater facility to be of a lower/smaller specification.
- This is likely to provide a cost saving when compared with having a high pressure gas compressor and its associated drive motor at the host facility.
- the reduction in the size of the gas compressor and its associated drive motor at the host facility provides a saving in deck space on the host facility and in the weight to be supported by the host facility.
- the reduction in pipe wall thickness enables the sections of the pipe for making up the pipeline to the underwater facility to be welded together more easily and quickly which considerably reduces fabrication costs. Furthermore, the reduction in pipe wall thickness may enable the pipeline to be reeled onto a drum and be laid from a pipe reel-lay barge which is a faster method of installing a pipeline than other conventional methods.
- the savings in pipeline costs enables longer tie-backs to the host facility to be economically considered which may allow the use of an existing host facility to be used for a remote field as opposed to having to provide a new host facility. This is of particular benefit when the field to be developed is located beneath deep water.
- the underwater facility may include fluid separating means for separating gas from the production fluid from said at least one production well and recirculation means for conveying gas from the fluid separating means into the gas compressor.
- the gas separated from the production fluid comprises gas supplied from the host facility, hence by conveying the separated gas from the separating means to the gas compressor, gas is being recirculated. Therefore, the pipeline from the host facility to the underwater facility can be of a smaller diameter when gas is recirculated as the quantity of gas required from the host facility for injection is significantly reduced.
- the diameter of the pipeline for conveying production fluid from the underwater facility to the host facility can be significantly reduced as this pipeline is no longer required to transport gas.
- the problems of slugging, hydrate formation and of the flow of production fluid being choked due to gas expanding as pressure reduces along the pipeline is significantly reduced.
- the separation of gas from the production fluid at the underwater facility may enable only a single production fluid pipeline being required to convey production fluid to the host facility instead of two such pipelines.
- the reduction in the diameter of the production fluid pipeline also has the advantages mentioned in relation to the gas supply pipeline of requiring less material, being able to weld pipeline sections together more quickly or being able to be installed from a reel.
- the underwater facility may be on a seabed and the production fluid pipeline may include a production riser from the seabed to the host facility at topsides, and the host facility may be connected to the production riser at or close to the seabed by a separate riser.
- the production riser is arranged to convey production fluid to the host facility and the separate riser is arranged to convey gas from the host facility for injection into the production riser.
- the production fluid pipeline from the underwater facility to the base of the production riser may only need to be of a sufficient diameter to convey at least substantially gas free production fluid and does not need to be increased in diameter or have an additional pipeline in order to convey gas or to avoid production fluid being choked by gas. Also, by injecting gas into the production riser, the need for pressure boosting of the production fluid at the underwater facility may be reduced or eliminated thus reducing the size of or eliminating the need for any pumps for such a purpose there.
- the system preferably includes a power and control umbilical extending from the host facility to the underwater gas compressor for conveying power and control signals to the gas compressor.
- the power and control umbilical may be also arranged to convey power and control signals required for other underwater equipment such as Christmas trees and manifolds. Minimal additional cost is incurred when providing power to the underwater gas compressor if the same umbilical is used for the underwater gas compressor and other underwater equipment.
- the underwater facility may include a retrievable module which incorporates the gas compressor.
- the gas compressor may be easily recovered for inspection, maintenance or repair, for example.
- the module may be of the general type forming part of the modular system designed by Alpha Thames Ltd of Essex, United Kingdom, and named AlphaPRIME.
- a method for injecting gas into a hydrocarbon reservoir comprising the steps of: supplying gas from a host facility to an underwater gas compressor via a connecting pipeline; compressing the gas received by the underwater gas compressor to a higher pressure; and injecting the compressed gas into at least one well connected to the underwater gas compressor, and into the hydrocarbon reservoir to improve conveyance of production fluid at least towards the host facility.
- the step of injecting gas may include injecting gas into at least one injection well, and include driving the gas into the hydrocarbon reservoir via the or each injection well at a pressure at least as high as the pressure of the production fluid in the reservoir.
- the step of injecting gas may include injecting gas into at least one production well, and include injecting gas into production fluid in the or each production well.
- the method may include the additional steps of conveying production fluid from the reservoir, separating gas from the production fluid, and conveying the separated gas into the gas compressor.
- the gas separated from the production fluid may be disposed of into at least one cavity below the surface of the ground underneath the water in which the gas compressor is located.
- Present regulations do not allow flaring gas for new fields being developed, hence it is beneficial to dispose of gas in this way when there is no market for the gas or it is uneconomic to export the gas.
- the method may include the steps of receiving production fluid at the host facility via a production riser from a seabed, and injecting gas from the host facility into the production riser at or close to the seabed.
- the method may include the steps of using any of the system components referred to above.
- a method for handling production fluid comprising the steps of: receiving production fluid in an underwater facility from a hydrocarbon reservoir; separating gas from the production fluid in the underwater facility; and disposing of the gas into at least one cavity below the surface of the 5 ground underneath the water in which the underwater facility is located.
- Figure 1 is a schematic diagram of a system for putting the invention into practice
- Figure 2 is a schematic diagram of a modified system
- Figure 3 is a modified detail of Figure 2;
- FIGS 4 to 7 are schematic diagrams of other modified systems.
- a system 1 has a host facility 2 which may be, for example, onshore or an offshore fixed or floating 5 rig.
- the host facility 2 has a gas processing plant 3 with a connected gas compressor 4 which is connected to a remote seabed facility 5 by an injection gas supply pipeline 6.
- the seabed facility 5 is connected to a plurality of gas injection wells 7 for a hydrocarbon reservoir whereby each well is connected to the facility 5 by a separate supply flowline 8 which is able to withstand conveyed 0 gas of a higher pressure than the gas supply pipeline 6.
- the gas supply pipeline 6 is connected to an inlet 9 of a high pressure gas compressor 10 and a conduit 11 from an outlet 12 of the compressor 10 is manifolded to the flowlines 8 connected to the injection wells 7.
- the gas compressor 10 is arranged to be supplied with power and control 5 signals from the host facility 2 via a power and control umbilical 13.
- the gas processing plant 3 dries gas for injection to a predetermined specification to make it suitable for compression by the compressor 4 at the host facility 2.
- the dried gas is routed into the gas supply pipeline 6 which conveys o the gas to the seabed facility 5.
- the gas is further compressed by the high pressure gas compressor 10 and is injected into the hydrocarbon reservoir via the well supply flowlines 8 and the gas injection wells 7.
- the pressure of the injected gas is at least as high as the pressure of the fluid in the reservoir so that it drives the production fluid to the host facility 2 via production wells and an arrangement of pipelines and flowlines (not shown).
- FIG. 2 illustrates one modification to the system 1 showing the production wells 25 which are each connected to the seabed facility 15 via a flowline 16 which are manifolded to a single conduit 17 at the facility 15.
- the seabed facility 15 has a fluid separation vessel 19 and the manifold conduit 17 is connected to an inlet 20 of this vessel.
- a first outlet 21 of the fluid separation vessel 19 is connected to the gas supply pipeline 6 by a recirculation conduit 22 and a second outlet 23 of the vessel 19 is connected to a production fluid pipeline leading to the host facility 2 indicated by arrow 24.
- gas compressed by the high pressure gas compressor 10 at the seabed facility 15 is injected into the hydrocarbon reservoir via the well supply flowlines 8 and the gas injection wells 7.
- This drives production fluid in the reservoir up to the heads of production wells 25, and on into the fluid separation vessel 19 via the flowlines 16 and the manifold conduit 17.
- the vessel 19 separates most gas from the production fluid.
- the at least substantially gas free production fluid leaves the fluid separation vessel 19 by the second outlet 23 and is driven to the host facility 2.
- the separated gas includes or comprises gas supplied from the host facility 2 and this gas leaves the fluid separation vessel 19 by the first outlet 21 and is conveyed by the recirculation conduit 22 into the gas supply pipeline 6 to be compressed by the gas compressor 10 for injection into the reservoir.
- gas As gas is now being recirculated for injection into the hydrocarbon reservoir to lift the production fluid, gas only needs to be supplied by the host facility 2 to top-up the recirculated gas, replacing gas not separated by the fluid separation vessel 19 or remaining in the reservoir.
- the seabed facility 25 illustrated in Figure 3 comprises a base structure 26 which supports a retrievable module 27 that contains the high pressure gas compressor 10 and the fluid separation vessel 19.
- the gas compressor inlet 9 is connected to the injection gas supply pipeline 6 from the host facility 2 by a multi-ported fluid connector 28 such as that described in GB-A-2261271 and the gas compressor outlet 12 is connected by the outlet manifold conduit 11 to the well supply flowlines 8 via the same multi-ported fluid connector 28.
- the fluid separation vessel inlet 20 is connected by the inlet manifold conduit 17 of the flowlines 16 via the same connector 28 and the first outlet 21 from the vessel 19 is connected to the inlet 9 of the gas compressor 10 via the recirculation conduit 22.
- the second outlet 23 from the vessel is connected to the production pipeline 24 leading to the host facility 2 via the same fluid connector 28. This connector 28 enables the module 27 to be isolated from the pipelines
- the module 27 has a power and control pod 29 which is connected to the power and control umbilical 13 by a connector 30 whereby the pod 29 directs power and provides control signals to equipment within the module 27.
- the pod 29 controls the high pressure gas compressor 10 but it may be overridden by control signals received from the host facility 2 via the umbilical 13.
- the pod 29 also drives the gas compressor 10 with power received from the host facility 2 via the umbilical 13.
- gas from the host facility 2 is received by the high pressure gas compressor 10 in the retrievable module 27 which drives gas into the hydrocarbon reservoir.
- Production fluid from the reservoir is received by the fluid separation vessel 19 in the module 27 where gas is separated from the production fluid and is conveyed by the recirculation conduit 22 so as to be compressed by the high pressure gas compressor 10 for injection into the reservoir.
- the at least substantially gas free production fluid from the fluid separation vessel 19 leaves the module 27 via the fluid connector 28 and is conveyed to the host facility 2 via the production pipeline 24.
- FIG 4 Another modification to the system 1 is shown in Figure 4 where the modified system 32 is for gas lift and the injection wells are replaced by production wells 25.
- the conduit 17 is connected to a production fluid pipeline leading to the host facility 2 indicated by arrow 24.
- gas compressed by the high pressure gas compressor 10 at the seabed facility 33 is injected down the annulus of the wellbore of each production well 25 so that it enters the tubing via tubing perforations and combines with and lifts the production fluid from the hydrocarbon reservoir in the tubing of the wellbore.
- the production fluid is lifted up to the heads of production wells 25, and on to the host facility 2 via the flowlines 16, the manifold conduit 17 and the production fluid pipeline 24.
- Figure 5 illustrates a modification to the system 32 shown in Figure 4 which is similar to the system 18 shown in Figure 2 except that the modified system 34 is directed to gas lift as opposed to gas injection with the flowlines 8 from the seabed facility 15 being connected to the production wells 25.
- gas compressed by the high pressure gas compressor 10 at the seabed facility 15 is injected down the wellbore of each production well 25 so that it combines with and lifts the production fluid from the reservoir.
- the production fluid is lifted into the fluid separation vessel 19 which separates most gas from the production fluid.
- the at least substantially gas free production fluid leaves the fluid separation vessel 19 by the second outlet 23 and is lifted to the host facility 2 and the separated gas is conveyed by the recirculation conduit 22 into the gas supply pipeline 6 to be compressed by the gas compressor 10 for injection into the wellbore of each production well 25.
- Figure 6 illustrates one modification to the system 34 shown in Figure 5.
- the modified system 35 is particularly applicable to deepwater applications, and the host facility 36 is shown to be a floating production vessel as opposed to being a fixed production structure as previously illustrated.
- the production fluid pipeline 24 connects the seabed facility 15 to the host facility 36 and the portion of the pipeline 24 which rises from the seabed to the host facility 36 is known as a production fluid riser 37.
- the gas processing plant 3 is connected to a gas compressor 38 which is separate from the gas compressor 4 for the gas supply pipeline 6 and this gas compressor 38 is connected by a riser 39 to the base of the production fluid riser 37.
- production fluid from the seabed facility 15 has gas from the host facility 36 injected into it via the riser 39 so that sufficient lift is provided to raise the production fluid up the production riser 37 to the host facility 36.
- the host facility 36 may have a fluid separation vessel (not shown) for processing production fluid including gas which has previously been injected into the production fluid via the riser 39. Such gas is separated from the production fluid by this vessel. The separated gas may be then recirculated by being injected into the base of the production riser 37 via the riser 39.
- Figure 7 illustrates another modification to the system 34 shown in Figure 5 in which in the modified system 40, the gas separated by the fluid separation vessel 19 is disposed of beneath the seabed instead of being recirculated.
- the first outlet 21 of the fluid separation vessel 19 is connected by a pipeline 41 to a disposal well 42 which injects the gas into a cavity 43 beneath the seabed, such as a depleted reservoir.
- the seabed facility shown in Figures 1 or 2 or any one of Figures 4 to 7 may have a retrievable module like that illustrated in Figure 3 and containing the high pressure gas compressor 10 and any fluid separation vessel 19.
- the power and control pod 29 in the retrievable module 27 is optional, as power and control could be provided/controlled externally of the module 27.
- Production fluid from the fluid separation vessel 19 may be boosted by a pump to enable the production fluid to be conveyed to the host facility and/or increase production rate and overall recovery of the production fluid.
- the pipelines and flowlines described may be of a rigid or flexible construction.
- the seabed facility may have a plurality of fluid separation vessels and/or retrievable modules possibly arranged to operate in parallel with each other.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Jet Pumps And Other Pumps (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/492,137 US20050072574A1 (en) | 2001-10-12 | 2002-10-11 | System and method for injecting gas into a hydrocarbon reservoir |
EP02801389A EP1448870A2 (en) | 2001-10-12 | 2002-10-11 | A system and method for injecting gas into a hydrocarbon reservoir |
BR0213627-9A BR0213627A (en) | 2001-10-12 | 2002-10-11 | System and method for injecting gas into a hydrocarbon reservoir and method for manipulating production fluid |
NO20041937A NO20041937L (en) | 2001-10-12 | 2004-05-11 | System and method for injecting gas into a hydrocarbon reservoir |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0124609.9 | 2001-10-12 | ||
GBGB0124609.9A GB0124609D0 (en) | 2001-10-12 | 2001-10-12 | A system and method for injecting gas into production fluid |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2003033867A2 true WO2003033867A2 (en) | 2003-04-24 |
WO2003033867A3 WO2003033867A3 (en) | 2003-07-17 |
Family
ID=9923770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB2002/004635 WO2003033867A2 (en) | 2001-10-12 | 2002-10-11 | A system and method for injecting gas into a hydrocarbon reservoir |
Country Status (6)
Country | Link |
---|---|
US (1) | US20050072574A1 (en) |
EP (1) | EP1448870A2 (en) |
BR (1) | BR0213627A (en) |
GB (1) | GB0124609D0 (en) |
NO (1) | NO20041937L (en) |
WO (1) | WO2003033867A2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009002187A1 (en) * | 2007-06-25 | 2008-12-31 | Harald Benestad | High pressure, high voltage penetrator assembly |
WO2015010728A1 (en) * | 2013-07-23 | 2015-01-29 | Statoil Petroleum As | Methods and apparatus for removing fluid from a well |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0420061D0 (en) * | 2004-09-09 | 2004-10-13 | Statoil Asa | Method |
NO20052808L (en) * | 2005-06-10 | 2006-12-11 | Norsk Hydro Produksjon As | Underwater compression system |
GB2436575A (en) * | 2006-03-16 | 2007-10-03 | Statoil Asa | Method for protecting hydrocarbon conduits |
US7669659B1 (en) * | 2008-01-29 | 2010-03-02 | Lugo Mario R | System for preventing hydrate formation in chemical injection piping for subsea hydrocarbon production |
GB2458011B (en) * | 2008-02-26 | 2010-12-15 | Vetco Gray Inc | Underwater wireless communications |
CA2804007A1 (en) * | 2010-06-30 | 2012-01-26 | Jarrad Rexilius | System and method for producing hydrocarbons from a well |
BR112013031653B1 (en) * | 2011-07-01 | 2020-12-15 | Exxonmobil Upstream Research Company | METHOD AND INSTALLATION OF HYDROCARBON PROCESSING |
NO337004B1 (en) * | 2013-07-10 | 2015-12-21 | Kværner Concrete Solutions As | Process and system for deep water oil production |
MY179151A (en) * | 2014-05-28 | 2020-10-29 | Petroliam Nasional Berhad Petronas | Low pressure separation system |
US9181786B1 (en) * | 2014-09-19 | 2015-11-10 | Baker Hughes Incorporated | Sea floor boost pump and gas lift system and method for producing a subsea well |
BR102015003532A2 (en) * | 2015-02-19 | 2016-09-13 | Fmc Technologies Do Brasil Ltda | production-well and injection-mountable gas-liquid separation and compression / pumping units |
NO346560B1 (en) | 2018-04-24 | 2022-10-03 | Equinor Energy As | System and method for offshore hydrocarbon Processing |
GB2611539A (en) * | 2021-10-06 | 2023-04-12 | Equinor Energy As | Hydrocarbon production |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2167467B (en) * | 1984-11-23 | 1987-10-28 | Raymond Scott Park | A method of supplying offshore oil fields with gases for enhanced oil recovery |
BR9301439A (en) * | 1993-04-05 | 1994-11-15 | Petroleo Brasileiro Sa | Integrated system and method of infra-marine repressurization |
GB2327695B (en) * | 1995-03-27 | 1999-10-13 | Baker Hughes Inc | Hydrocarbon production using multilateral wellbores |
BR9602746A (en) * | 1996-06-12 | 1998-09-08 | Petroleo Brasileiro Sa | Method and apparatus for underwater oil production with primary gas separation and flow through high pressure gas injection |
WO1998015712A2 (en) * | 1996-10-08 | 1998-04-16 | Baker Hughes Incorporated | Method of forming wellbores from a main wellbore |
NO313767B1 (en) * | 2000-03-20 | 2002-11-25 | Kvaerner Oilfield Prod As | Process for obtaining simultaneous supply of propellant fluid to multiple subsea wells and subsea petroleum production arrangement for simultaneous production of hydrocarbons from multi-subsea wells and supply of propellant fluid to the s. |
US6575248B2 (en) * | 2000-05-17 | 2003-06-10 | Schlumberger Technology Corporation | Fuel cell for downhole and subsea power systems |
-
2001
- 2001-10-12 GB GBGB0124609.9A patent/GB0124609D0/en not_active Ceased
-
2002
- 2002-10-11 BR BR0213627-9A patent/BR0213627A/en not_active IP Right Cessation
- 2002-10-11 EP EP02801389A patent/EP1448870A2/en not_active Withdrawn
- 2002-10-11 US US10/492,137 patent/US20050072574A1/en not_active Abandoned
- 2002-10-11 WO PCT/GB2002/004635 patent/WO2003033867A2/en not_active Application Discontinuation
-
2004
- 2004-05-11 NO NO20041937A patent/NO20041937L/en unknown
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009002187A1 (en) * | 2007-06-25 | 2008-12-31 | Harald Benestad | High pressure, high voltage penetrator assembly |
US7718899B2 (en) | 2007-06-25 | 2010-05-18 | Harald Benestad | High pressure, high voltage penetrator assembly for subsea use |
NO329307B1 (en) * | 2007-06-25 | 2010-09-27 | Harald Benestad | High pressure, high voltage penetrator assembly |
US8097810B2 (en) | 2007-06-25 | 2012-01-17 | Harald Benestad | High pressure, high voltage penetrator assembly |
WO2015010728A1 (en) * | 2013-07-23 | 2015-01-29 | Statoil Petroleum As | Methods and apparatus for removing fluid from a well |
Also Published As
Publication number | Publication date |
---|---|
US20050072574A1 (en) | 2005-04-07 |
WO2003033867A3 (en) | 2003-07-17 |
NO20041937L (en) | 2004-05-11 |
BR0213627A (en) | 2004-09-14 |
GB0124609D0 (en) | 2001-12-05 |
EP1448870A2 (en) | 2004-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1266123B1 (en) | Subsea production system | |
US7669652B2 (en) | Subsea pumping system | |
US20050072574A1 (en) | System and method for injecting gas into a hydrocarbon reservoir | |
EP2198120B1 (en) | Pumping module and system | |
US8500419B2 (en) | Subsea pumping system with interchangable pumping units | |
US8083501B2 (en) | Subsea pumping system including a skid with wet matable electrical and hydraulic connections | |
US7152681B2 (en) | Method and arrangement for treatment of fluid | |
US20030170077A1 (en) | Riser with retrievable internal services | |
US20030075335A1 (en) | Extended reach tie-back system | |
US20070235195A1 (en) | Subsea Flowline Jumper Containing ESP | |
US4967843A (en) | Device for producing an effluent contained in a submarine geological formation and production method employed using such a device | |
CN1357077A (en) | Method of deploying electrically driven fluid transducer system in well | |
AU2009256454B2 (en) | Offshore drilling and production systems and methods | |
US20040244980A1 (en) | System and method for injecting water into an underwater hydrocarbon reservoir | |
WO2002063135A1 (en) | A method and a sea-based installation for hydrocarbon processing | |
NO345890B1 (en) | Supplying water in subsea installations | |
GB2590647A (en) | Supplying water in subsea installations | |
NO313768B1 (en) | Method and arrangement for controlling a downhole separator | |
NO315576B1 (en) | Procedure for Carrying a Submarine Manifold and a Submarine Petroleum Production Arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BY BZ CA CH CN CO CR CU CZ DE DM DZ EC EE ES FI GB GD GE GH HR HU ID IL IN IS JP KE KG KP KR LC LK LR LS LT LU LV MA MD MG MN MW MX MZ NO NZ OM PH PL PT RU SD SE SG SI SK SL TJ TM TN TR TZ UA UG US UZ VC VN YU ZA ZM |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ UG ZM ZW AM AZ BY KG KZ RU TJ TM AT BE BG CH CY CZ DK EE ES FI FR GB GR IE IT LU MC PT SE SK TR BF BJ CF CG CI GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 10492137 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2002801389 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 2002801389 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 2002801389 Country of ref document: EP |