[go: up one dir, main page]

WO2006114609A1 - Pressure responsive centralizer - Google Patents

Pressure responsive centralizer Download PDF

Info

Publication number
WO2006114609A1
WO2006114609A1 PCT/GB2006/001508 GB2006001508W WO2006114609A1 WO 2006114609 A1 WO2006114609 A1 WO 2006114609A1 GB 2006001508 W GB2006001508 W GB 2006001508W WO 2006114609 A1 WO2006114609 A1 WO 2006114609A1
Authority
WO
WIPO (PCT)
Prior art keywords
structural component
hollow structural
centralizer
borehole
overpressure
Prior art date
Application number
PCT/GB2006/001508
Other languages
French (fr)
Inventor
Ronald R. Faul
Original Assignee
Halliburton Energy Services, Inc.
Curtis, Philip, Anthony
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services, Inc., Curtis, Philip, Anthony filed Critical Halliburton Energy Services, Inc.
Priority to MX2007013403A priority Critical patent/MX2007013403A/en
Priority to AU2006239021A priority patent/AU2006239021A1/en
Priority to BRPI0610397A priority patent/BRPI0610397A2/en
Priority to EP06726897A priority patent/EP1880080A1/en
Publication of WO2006114609A1 publication Critical patent/WO2006114609A1/en
Priority to NO20076058A priority patent/NO20076058L/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00

Definitions

  • the present invention relates to systems and methods for controlling pressure in wellbores.
  • Annular pressure buildup within wellbores has been recognized in the oil and gas industry for many years as a serious problem. Fluids trapped in a wellbore or annular space in a wellbore will expand with a corresponding increase in temperature leading to a volume increase and increase in the force they exert upon the surrounding area. This pressure has been known to be a significant factor in the failure of subsea wells, including Well A-2 of British Petroleum 1999 Marlin development program in the deepwater program off the Gulf of Mexico. One relevant article is Practical and Successful Prevention of Annular Pressure Buildup on the Marlin Project. SPE International 77473, 2002, Richard F. Vargo, Jr., et al, and which is hereby incorporated by reference in its entirety.
  • Annular pressure buildup is the pressure generated by thermal expansion of trapped fluids as they are heated. When wellbore fluids heat up and expand in a closed system, the expansion causes high induced pressures. Most land and many offshore locations may be able to bleed this pressure through surface-accessible wellhead equipment. In subsea completions, the primary annulus between the tubing and production casing may be the only accessible annulus. Consequently, bleeding the outer annuli may not be possible. Therefore, when the risk of subsea APB exists, well designers should give serious consideration to appropriate mitigation as part of the fundamental well design.
  • Offshore hydrocarbon recovery operations are increasingly moving into deeper water and more remote locations.
  • Satellite wells are completed at the sea floor and are tied to remote platforms or other facilities through extended subsea pipelines.
  • Some of these pipelines extend through water that is thousands of feet deep, where temperatures of the water near the sea floor are in the range of about 40 0 F.
  • the hydrocarbon fluids usually produced along with some water, reach the sea floor at much higher temperatures, characteristic of depths thousands of feet below the sea floor.
  • APB In order for a well to experience APB, two conditions are generally known to be present. First, there must be a sealed region, typically an annulus, wherein pressure may build. Second, a temperature rise is generally associated with the increase in pressure.
  • a good starting point is to try to ensure that the annulus does not become trapped.
  • cement shortfall is usually designed. This assumes that cement heights will be below the previous casing shoe and that a trapped annulus condition may not occur.
  • cement can still channel because of poor mud displacement.
  • Such displacement problems are caused by poor casing eccentricity or poor erodibility of the wellbore fluids during the primary cementing operation.
  • barite sag following drilling can cause a trapped condition.
  • a trapped condition can occur either by cementitious materials or due to the settling of weighting materials from the mud.
  • a second APB prevention technique consists of attaching syntactic crushable-foam wrap to the casing.
  • the syntactic foam contains small, hollow glass spheres filled with air at atmospheric pressure. When ABP reaches a certain level, the hollow spheres collapse. This collapse results in a correspondent increase in available volume to thereby decrease pressure. Data demonstrate that the volume required for an effective solution is about 2% to about 8% of the annular volume.
  • APB Another way of prevention of APB is the use of compressible fluids in the trapped annulus to absorb volume increases as the heat up occurs.
  • a final way of mitigating APB is by using enhanced casing products. Increased casing capacities can accommodate a higher degree of pressure buildup without detrimental effects to the casing or well. Extensive work has been applied here also involving advanced, probabilistic performance properties of the subject casings.
  • an innovative centralizer comprises a centralizing structure with at least one sealed hollow structural component where a rupture disk is capable of breaking in response to sufficient pressure.
  • the present innovations further teach a method of effecting a volumetric change in response to overpressure within a wellbore comprising at least one hollow structural component.
  • the present innovative systems and methods can be used to avoid production loss due to wellbore damage or the need to restrict hydrocarbon flow in an effort to keep production temperature below danger levels.
  • Another advantage of the disclosed centralizer is the ability to be connected to the drilling and production equipment in a number of ways.
  • the centralizer can be fitted with a rupture component made part of the centralizer, screwed into the bottom of the centralizer by means of threads within the centralizer, or connected by some other means.
  • FIGS. Ia and Ib show a preferred embodiment of a centralizer.
  • FIG. 2 shows a preferred embodiment of a centralizer.
  • FIG. 3 shows a preferred embodiment of a centralizer configuration using a 'hinged' arrangement within a bore.
  • FIG. 4 shows a production system using a centralizer with hollow rupture components.
  • FIG. 5 shows a preferred embodiment of a centralizer with multiple rupture components.
  • FIG. 6 shows a preferred embodiment of a pressure responsive system with a centralizer and multiple rupture components.
  • FIG. 7 shows a preferred embodiment of a hollow rupture component.
  • FIG. 8 shows a preferred embodiment of a centralizer where an empty rupture component is affixed to the main chamber of the centralizer.
  • a centralizer is combined with a rupture disk to allow for the release of excess pressure from a wellbore.
  • the hollow components in this embodiment contain a burst disk or rupture disk, which are selected to rupture at a predetermined pressure as required by well hydrostatic pressure and other factors.
  • the inside and outside diameters of the centralizer preferably provide effective centering of the casing in the borehole or outer casing.
  • the number of struts and rupture and burst disks may be adjusted in such a way as to meet the specific pressure and volume needs of a specific project. For instance, in one embodiment, there may be six struts with one rupture disk in each strut. In another embodiment, there may be four struts with two rupture disks in each strut.
  • a centralizer is combined with a relief valve in order to allow for the release of excess pressure from a wellbore.
  • the hollow components in this embodiment contain a relief valve that is selected to open at a predetermined pressure as required by well hydrostatic pressure and other factors.
  • a relief valve is something that is not destroyed when it opens.
  • a hollow structural component is a prefabricated rigid structure capable of allowing for volumetric expansion.
  • the rupture disk is sealed in such a way as to 'burst' at a predetermined pressure to facilitate the production of hydrocarbons.
  • the centralizer may also comprise at least one centralizing structure and include at least one breakable structural component that can respond to pressure increase surges.
  • the breakable structural component can collapse, burst, or rupture to provide a volume change in response to overpressure.
  • One advantage of this embodiment is that pressures build up within boreholes can be alleviated.
  • Another advantage is that the volume in a well can be controlled in such a manner as to optimize the production within a well.
  • FIG. Ia shows a sample preferred embodiment of the centralizer unit 100. This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 100 has been installed, would normally pass through the axial central cavity 130.
  • the struts 110 of the centralizer 100 in this embodiment, run parallel with the wellbore 140.
  • One or more rapture disks are located in one or more of the struts. These struts are hollow structural components.
  • the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead.
  • FIG. Ib shows a sample preferred embodiment of one of the struts 110 of the centralizer unit 100.
  • This is a formed shape of tubular steel, having a hollow center (not visible in this figure).
  • a rupture disk 112 blocks the sole opening into the hollow center of strut 110. (Preferably a hole is drilled and tapped in the strut 110.)
  • the end of strut 110 is attached to circumferential element 120 by a weld 114, which also serves to close off the hollow within the strut 110.
  • the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead.
  • FIG. 2 shows a sample preferred embodiment of the pressure responsive system using centralizer unit 200.
  • This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 200 has been installed, would normally pass through the axial central cavity 230.
  • the struts 210 of the centralizer in this embodiment, run parallel with the wellbore 240.
  • One or more rupture disks are located in one or more of the struts.
  • the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead.
  • a centralizer is attached to the rupture component using threads 260.
  • FIG. 3 shows a sample preferred embodiment of the centralizer unit 300. This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 300 has been installed, would normally pass through the axial central cavity 330.
  • the struts 310 of the centralizer in this embodiment, ran parallel with the wellbore 340.
  • One or more rupture disks are located in one or more of the struts.
  • the centralizer is made of stainless steel, but or course carbon steel or chrome- moly or titanium or other materials can be used instead.
  • a centralizer is attached to the rupture component using hinges 360.
  • FIG. 4 shows a production system 400 using a centralizer 410 with hollow rapture component 420 surrounded by wellbore 440.
  • a casing used to move the desired hydrocarbons or other material is illustrated by 470 in which hydrocarbons or other desired products may be moved from the well to some kind of recovery equipment located at 480.
  • FIG. 5 shows a centralizer system 500 with multiple rupture components 510, 520, and 530.
  • Rupture components 510, 520, and 530 are attached to the centralizer component 540.
  • Centralizer component 540 is attached to hollow struts 550.
  • Rupture components 510, 520, and 530 may be of different sizes and pressure sensitivities.
  • FIG. 6 shows a casing combination with centralizer and hollow rupture components.
  • a hollow component 600 contains multiple rupture components 610 and 630. Within said hollow component walls 640 a hole is drilled and the first rupture component is placed at 610. A second rupture component 630 is held in place by elements within the hollow component at 620.
  • FIG. 7 shows a hollow rupture component 700.
  • a ring 710 separates the sealed disc components 720 and 730.
  • Hinges 740 can attach hollow rapture component to the centralizer system.
  • Hollow rapture component can also be attached by means of threads found at 750
  • FIG. 8 shows a centralizer system 800 with a rapture component 810 located at either end of the centralizer system 850 or 860. Additional rapture components may be placed at 820, 830, and 840. The structural centralizer support struts 850 are placed along the bore.
  • the present innovations are enabled as a method for avoiding overpressure in a borehole, comprising the actions of opening a sealed hollow structural component within the borehole to thereby relieve overpressure by volumetric expansion into the hollow structural component is claimed.
  • the present innovations are enabled as a method for avoiding overpressure in a borehole, comprising the actions of relieving overpressure within a borehole by collapsing at least part of a hollow structural component and creating volumetric expansion is also claimed.
  • the present innovations are enabled as a method of relieving overpressure in a borehole comprising of inserting a hollow structural component into a borehole and increasing pressure within the borehole and relieving overpressure in the borehole by increasing the available volume in the borehole through a change in the hollow structural component is also claimed.
  • the pressure responsive system may be made out of any number of materials, including, but not limited to, stainless steel, carbon steel, titanium, or any number of other materials.
  • the number of struts, rupture disks, and relief valves may vary from embodiment to embodiment.
  • the downhole string may be in different forms, including, but not limited to a tubular string or casing string.
  • One variation includes replacing the rupture disks with relief valves or other structures that will allow the enclosed volume to open at a predetermined pressure.
  • a particular advantage of the hollow chamber (at atmospheric pressure or pressurized) to be transported to a downhole location with a rupture disk is that it can be designed to rapture at a predetermined stage of operations.
  • the hollow structural component may be physically part of the centralizer, or be attached thereto, or may be separate from the centralizer itself.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Safety Valves (AREA)
  • Earth Drilling (AREA)
  • Check Valves (AREA)
  • Pressure Vessels And Lids Thereof (AREA)

Abstract

A centralizer including hollow structural components. In at least one embodiment, the hollow structural component is sealed by at least one valve or rupture disk. When unacceptable overpressures occur, the valve or rupture disks break to allow influx into the hollow element, thereby relieving pressure and avoiding damage that might otherwise occur. In other embodiments, the hollow structural component collapses to expand available volume.

Description

PRESSURE RESPONSIVE CENTRALIZER
FIELD OF THE INVENTION
The present invention relates to systems and methods for controlling pressure in wellbores.
BACKGROUND AND SUMMARY OF THE INVENTION
Background: Pressure In Well
Annular pressure buildup within wellbores has been recognized in the oil and gas industry for many years as a serious problem. Fluids trapped in a wellbore or annular space in a wellbore will expand with a corresponding increase in temperature leading to a volume increase and increase in the force they exert upon the surrounding area. This pressure has been known to be a significant factor in the failure of subsea wells, including Well A-2 of British Petroleum 1999 Marlin development program in the deepwater program off the Gulf of Mexico. One relevant article is Practical and Successful Prevention of Annular Pressure Buildup on the Marlin Project. SPE International 77473, 2002, Richard F. Vargo, Jr., et al, and which is hereby incorporated by reference in its entirety.
Background: Annular Pressure Build Up
Annular pressure buildup ("APB") is the pressure generated by thermal expansion of trapped fluids as they are heated. When wellbore fluids heat up and expand in a closed system, the expansion causes high induced pressures. Most land and many offshore locations may be able to bleed this pressure through surface-accessible wellhead equipment. In subsea completions, the primary annulus between the tubing and production casing may be the only accessible annulus. Consequently, bleeding the outer annuli may not be possible. Therefore, when the risk of subsea APB exists, well designers should give serious consideration to appropriate mitigation as part of the fundamental well design.
Offshore hydrocarbon recovery operations are increasingly moving into deeper water and more remote locations. Often satellite wells are completed at the sea floor and are tied to remote platforms or other facilities through extended subsea pipelines. Some of these pipelines extend through water that is thousands of feet deep, where temperatures of the water near the sea floor are in the range of about 40 0F. The hydrocarbon fluids, usually produced along with some water, reach the sea floor at much higher temperatures, characteristic of depths thousands of feet below the sea floor.
In order for a well to experience APB, two conditions are generally known to be present. First, there must be a sealed region, typically an annulus, wherein pressure may build. Second, a temperature rise is generally associated with the increase in pressure.
Background: General APB Mitigation Techniques
Several existing solutions have been presented in past literature. These solutions include:
• cement shortfall (leave cement short of previous casing);
• providing a leak path or bleed port;
• syntactic, crushable foam wrap;
• compressible fluids placed in the trapped annulus to absorb volume;
• heavyweight and/or high-yield casing (enhanced casing design); and
• full-height cementing (cement filling the entire annulus).
These can be incorporated into drilling plans to mitigate APB risks in some circumstances. A good starting point is to try to ensure that the annulus does not become trapped. Whenever possible, cement shortfall is usually designed. This assumes that cement heights will be below the previous casing shoe and that a trapped annulus condition may not occur. However, cement can still channel because of poor mud displacement. Such displacement problems are caused by poor casing eccentricity or poor erodibility of the wellbore fluids during the primary cementing operation. In addition, barite sag following drilling can cause a trapped condition. A trapped condition can occur either by cementitious materials or due to the settling of weighting materials from the mud. In many cases, subsea wells are drilled and left to be completed at a later date because of the lead time required for other components of the production infrastructure, i.e. pipelines, etc. Over time, the solids in the mud can settle out, creating a trapped condition. Later when the well is completed, the trapped annulus condition and the resulting APB may not show up until a failure occurs.
A second APB prevention technique consists of attaching syntactic crushable-foam wrap to the casing. The syntactic foam contains small, hollow glass spheres filled with air at atmospheric pressure. When ABP reaches a certain level, the hollow spheres collapse. This collapse results in a correspondent increase in available volume to thereby decrease pressure. Data demonstrate that the volume required for an effective solution is about 2% to about 8% of the annular volume.
Another way of prevention of APB is the use of compressible fluids in the trapped annulus to absorb volume increases as the heat up occurs.
A final way of mitigating APB is by using enhanced casing products. Increased casing capacities can accommodate a higher degree of pressure buildup without detrimental effects to the casing or well. Extensive work has been applied here also involving advanced, probabilistic performance properties of the subject casings.
Pressure Responsive Centralizer System
The present inventions describe methods and systems for controlling pressure and volume variations in boreholes. For example, in one embodiment an innovative centralizer comprises a centralizing structure with at least one sealed hollow structural component where a rupture disk is capable of breaking in response to sufficient pressure. The present innovations further teach a method of effecting a volumetric change in response to overpressure within a wellbore comprising at least one hollow structural component. The present innovative systems and methods can be used to avoid production loss due to wellbore damage or the need to restrict hydrocarbon flow in an effort to keep production temperature below danger levels. Another advantage of the disclosed centralizer is the ability to be connected to the drilling and production equipment in a number of ways. The centralizer can be fitted with a rupture component made part of the centralizer, screwed into the bottom of the centralizer by means of threads within the centralizer, or connected by some other means.
It should, of course, be understood that the description is merely illustrative and that various modifications and changes can be made in the structure disclosed without departing from the spirit of the invention.
BRIEF DESCRIPTION OF THE DRAWINGS
The disclosed inventions will be described with reference to the accompanying drawings, which show important sample embodiments of the invention and which are incorporated in the specification hereof by reference, wherein:
FIGS. Ia and Ib show a preferred embodiment of a centralizer.
FIG. 2 shows a preferred embodiment of a centralizer.
FIG. 3 shows a preferred embodiment of a centralizer configuration using a 'hinged' arrangement within a bore.
FIG. 4 shows a production system using a centralizer with hollow rupture components.
FIG. 5 shows a preferred embodiment of a centralizer with multiple rupture components.
FIG. 6 shows a preferred embodiment of a pressure responsive system with a centralizer and multiple rupture components.
FIG. 7 shows a preferred embodiment of a hollow rupture component.
FIG. 8 shows a preferred embodiment of a centralizer where an empty rupture component is affixed to the main chamber of the centralizer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
The numerous innovative teachings of the present application will be described with particular reference to the presently preferred embodiment (by way of example, and not of limitation).
The disclosed inventions take advantage of a new way in which the pressure in boreholes can be controlled. In one embodiment, a centralizer is combined with a rupture disk to allow for the release of excess pressure from a wellbore. The hollow components in this embodiment contain a burst disk or rupture disk, which are selected to rupture at a predetermined pressure as required by well hydrostatic pressure and other factors. The inside and outside diameters of the centralizer preferably provide effective centering of the casing in the borehole or outer casing. The number of struts and rupture and burst disks may be adjusted in such a way as to meet the specific pressure and volume needs of a specific project. For instance, in one embodiment, there may be six struts with one rupture disk in each strut. In another embodiment, there may be four struts with two rupture disks in each strut.
In another embodiment, a centralizer is combined with a relief valve in order to allow for the release of excess pressure from a wellbore. The hollow components in this embodiment contain a relief valve that is selected to open at a predetermined pressure as required by well hydrostatic pressure and other factors. A relief valve is something that is not destroyed when it opens. A hollow structural component is a prefabricated rigid structure capable of allowing for volumetric expansion.
In yet another embodiment, the rupture disk is sealed in such a way as to 'burst' at a predetermined pressure to facilitate the production of hydrocarbons. This invention avoids production loss due to wellbore damage due to overpressures and the need to restrict hydrocarbon flow in an effort to keep production temperature below danger levels.
In a further embodiment, the centralizer may also comprise at least one centralizing structure and include at least one breakable structural component that can respond to pressure increase surges. The breakable structural component can collapse, burst, or rupture to provide a volume change in response to overpressure. One advantage of this embodiment is that pressures build up within boreholes can be alleviated. Another advantage is that the volume in a well can be controlled in such a manner as to optimize the production within a well.
FIG. Ia shows a sample preferred embodiment of the centralizer unit 100. This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 100 has been installed, would normally pass through the axial central cavity 130. The struts 110 of the centralizer 100, in this embodiment, run parallel with the wellbore 140. One or more rapture disks (not shown in this figure) are located in one or more of the struts. These struts are hollow structural components. In this embodiment, the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead.
FIG. Ib shows a sample preferred embodiment of one of the struts 110 of the centralizer unit 100. This is a formed shape of tubular steel, having a hollow center (not visible in this figure). A rupture disk 112 blocks the sole opening into the hollow center of strut 110. (Preferably a hole is drilled and tapped in the strut 110.) In this embodiment, the end of strut 110 is attached to circumferential element 120 by a weld 114, which also serves to close off the hollow within the strut 110. In this embodiment the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead.
FIG. 2 shows a sample preferred embodiment of the pressure responsive system using centralizer unit 200. This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 200 has been installed, would normally pass through the axial central cavity 230. The struts 210 of the centralizer, in this embodiment, run parallel with the wellbore 240. One or more rupture disks (not shown in this figure) are located in one or more of the struts. In this embodiment, the centralizer is made of stainless steel. Carbon steel, chrome-moly, or titanium or other materials can be used instead. In this embodiment, a centralizer is attached to the rupture component using threads 260.
FIG. 3 shows a sample preferred embodiment of the centralizer unit 300. This is a side view of the centralizer unit itself, not showing the casing which, once the centralizer 300 has been installed, would normally pass through the axial central cavity 330. The struts 310 of the centralizer, in this embodiment, ran parallel with the wellbore 340. One or more rupture disks (not shown in this figure) are located in one or more of the struts. In this embodiment, the centralizer is made of stainless steel, but or course carbon steel or chrome- moly or titanium or other materials can be used instead. In this embodiment, a centralizer is attached to the rupture component using hinges 360.
FIG. 4 shows a production system 400 using a centralizer 410 with hollow rapture component 420 surrounded by wellbore 440. A casing used to move the desired hydrocarbons or other material is illustrated by 470 in which hydrocarbons or other desired products may be moved from the well to some kind of recovery equipment located at 480.
FIG. 5 shows a centralizer system 500 with multiple rupture components 510, 520, and 530. Rupture components 510, 520, and 530 are attached to the centralizer component 540. Centralizer component 540 is attached to hollow struts 550. Rupture components 510, 520, and 530 may be of different sizes and pressure sensitivities.
FIG. 6 shows a casing combination with centralizer and hollow rupture components. A hollow component 600 contains multiple rupture components 610 and 630. Within said hollow component walls 640 a hole is drilled and the first rupture component is placed at 610. A second rupture component 630 is held in place by elements within the hollow component at 620.
FIG. 7 shows a hollow rupture component 700. A ring 710 separates the sealed disc components 720 and 730. Hinges 740 can attach hollow rapture component to the centralizer system. Hollow rapture component can also be attached by means of threads found at 750
FIG. 8 shows a centralizer system 800 with a rapture component 810 located at either end of the centralizer system 850 or 860. Additional rapture components may be placed at 820, 830, and 840. The structural centralizer support struts 850 are placed along the bore.
In one example, the present innovations are enabled as a method for avoiding overpressure in a borehole, comprising the actions of opening a sealed hollow structural component within the borehole to thereby relieve overpressure by volumetric expansion into the hollow structural component is claimed. In another example, the present innovations are enabled as a method for avoiding overpressure in a borehole, comprising the actions of relieving overpressure within a borehole by collapsing at least part of a hollow structural component and creating volumetric expansion is also claimed.
In another example, the present innovations are enabled as a method of relieving overpressure in a borehole comprising of inserting a hollow structural component into a borehole and increasing pressure within the borehole and relieving overpressure in the borehole by increasing the available volume in the borehole through a change in the hollow structural component is also claimed.
None of the description in the present application should be read as implying that any particular element, step, or function is an essential element which must be included in the claim scope: THE SCOPE OF PATENTED SUBJECT MATTER IS DEFINED ONLY BY THE ALLOWED CLAIMS.
Modifications and Variations
As will be recognized by those skilled in the art, the innovative concepts described in the present application can be modified and varied over a tremendous range of applications, and accordingly the scope of patented subject matter is not limited by any of the specific exemplary teachings given.
The pressure responsive system may be made out of any number of materials, including, but not limited to, stainless steel, carbon steel, titanium, or any number of other materials. In addition, the number of struts, rupture disks, and relief valves may vary from embodiment to embodiment. The downhole string may be in different forms, including, but not limited to a tubular string or casing string.
One variation includes replacing the rupture disks with relief valves or other structures that will allow the enclosed volume to open at a predetermined pressure.
A particular advantage of the hollow chamber (at atmospheric pressure or pressurized) to be transported to a downhole location with a rupture disk is that it can be designed to rapture at a predetermined stage of operations.
Note that the pressure required for rupture will correspond directly with the internal design of the centralizer and the pressure with which it is sealed at.
The hollow structural component may be physically part of the centralizer, or be attached thereto, or may be separate from the centralizer itself.
None of the description in the present application should be read as implying that any particular element, step, or function is an essential element which must be included in the claim scope: THE SCOPE OF PATENTED SUBJECT MATTER IS DEFINED ONLY BY THE ALLOWED CLAIMS.

Claims

What is claimed is:
1. A method of avoiding overpressure in a borehole, comprising opening a sealed hollow structural component within the borehole to thereby relieve overpressure by volumetric expansion into the hollow structural component.
2. The method of claim 1 wherein the hollow structural component is sealed by at least one relief valve.
3. The method of claim 1 wherein the hollow structural component is sealed by at least one rupture disk.
4. The method of claim 1 wherein the hollow structural component is attached to a centralizer providing axial support for downhole equipment.
5. The method of claim 1 wherein the hollow structural component is placed along a downhole string.
6. The method of claim 1 wherein the hollow structural component includes a first seal and a second seal.
7. The method of claim 6 wherein the first seal is a relief valve or rupture disk and the second seal is a relief valve or rupture disk.
8. The method of claim 7 wherein the first seal and second seal are calibrated to respond to the same level of overpressure.
9. The method of claim 7 wherein the first seal is calibrated to respond to a different level of overpressure than the second seal.
10. A method of avoiding overpressure in a borehole, comprising relieving overpressure within the borehole by collapsing at least part of a hollow structural component.
11. The method of claim 10 wherein the hollow structural component is attached to a centralizer unit providing axial support for downhole equipment.
12. The method of claim 11 wherein the hollow structural component is placed along a downhole string.
13. The method of claim 12 further comprising a second hollow structural component that is sealed.
14. The method of claim 13 wherein the second hollow structural component is sealed by a relief valve or rupture disk.
15. The method of claim 14 wherein the first and second hollow structural components are calibrated to respond to the same overpressure.
16. The method of claim 14 wherein the first hollow structural component is calibrated to respond to a different level of overpressure than the second hollow structural component.
17. A method of relieving overpressure in a borehole, comprising: inserting a hollow structural component into the borehole; increasing pressure within the borehole; and relieving overpressure in the borehole by increasing the available volume in the borehole through a change in the hollow structural component.
18. The method of claim 17 wherein the available volume in the borehole is increased by opening the hollow structural component.
19. The method of claim 18 wherein the hollow structural component is sealed by a relief valve or rupture disk.
20. The method of claim 17 wherein volumetric expansion is created by collapsing of the hollow structural component.
PCT/GB2006/001508 2005-04-27 2006-04-25 Pressure responsive centralizer WO2006114609A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
MX2007013403A MX2007013403A (en) 2005-04-27 2006-04-25 Pressure responsive centralizer.
AU2006239021A AU2006239021A1 (en) 2005-04-27 2006-04-25 Pressure responsive centralizer
BRPI0610397A BRPI0610397A2 (en) 2005-04-27 2006-04-25 method to prevent and alleviate overpressure in a borehole
EP06726897A EP1880080A1 (en) 2005-04-27 2006-04-25 Pressure responsive centralizer
NO20076058A NO20076058L (en) 2005-04-27 2007-11-26 Procedure for preventing borehole overpressure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/115,998 US20060243456A1 (en) 2005-04-27 2005-04-27 Pressure responsive centralizer
US11/115,998 2005-04-27

Publications (1)

Publication Number Publication Date
WO2006114609A1 true WO2006114609A1 (en) 2006-11-02

Family

ID=36619285

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2006/001508 WO2006114609A1 (en) 2005-04-27 2006-04-25 Pressure responsive centralizer

Country Status (7)

Country Link
US (1) US20060243456A1 (en)
EP (1) EP1880080A1 (en)
AU (1) AU2006239021A1 (en)
BR (1) BRPI0610397A2 (en)
MX (1) MX2007013403A (en)
NO (1) NO20076058L (en)
WO (1) WO2006114609A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060243435A1 (en) * 2005-04-27 2006-11-02 Halliburton Energy Services, Inc. Pressure responsive centralizer
CA2843619C (en) 2010-02-18 2018-05-15 Ncs Oilfield Services Canada Inc. Downhole tool assembly with debris relief, and method for using same
US20130062073A1 (en) * 2011-09-14 2013-03-14 Nathan Landsiedel Packer Assembly with a Standoff
US8931559B2 (en) 2012-03-23 2015-01-13 Ncs Oilfield Services Canada, Inc. Downhole isolation and depressurization tool
US9057230B1 (en) 2014-03-19 2015-06-16 Ronald C. Parsons Expandable tubular with integral centralizers
US12435603B2 (en) * 2022-10-19 2025-10-07 Halliburton Energy Services, Inc. Enhanced expandable liner hanger rib engagement mechanism

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6293346B1 (en) * 1998-09-21 2001-09-25 Schlumberger Technology Corporation Method and apparatus for relieving pressure
US6736012B1 (en) * 2003-04-07 2004-05-18 Aker Kvaerner Oilfield Products, Inc. Safety device for use as overpressure protection for a trapped volume space

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2253675A (en) * 1940-08-22 1941-08-26 Arnold Rousseau Centering cage
US3366182A (en) * 1965-02-25 1968-01-30 B & W Inc Well tool for releasing liner hangers and the like
US4219081A (en) * 1978-11-03 1980-08-26 Halliburton Services Knockdown centralizer
US4875524A (en) * 1988-09-29 1989-10-24 Halliburton Company Casing centralizer
US5474127A (en) * 1992-12-14 1995-12-12 Halliburton Company Annular safety system for oil well
US5782298A (en) * 1996-06-07 1998-07-21 Alexander Oil Tools, Inc. Retrievable safety packer
US6457528B1 (en) * 2001-03-29 2002-10-01 Hunting Oilfield Services, Inc. Method for preventing critical annular pressure buildup
US7048059B2 (en) * 2002-10-15 2006-05-23 Baker Hughes Incorporated Annulus pressure control system for subsea wells
US20060196539A1 (en) * 2003-03-01 2006-09-07 Raska Nathan C Reversible rupture disk apparatus and method
US6957704B2 (en) * 2003-05-14 2005-10-25 Halliburton Energy Services Inc. Limit clamp for use with casing attachments

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6293346B1 (en) * 1998-09-21 2001-09-25 Schlumberger Technology Corporation Method and apparatus for relieving pressure
US6736012B1 (en) * 2003-04-07 2004-05-18 Aker Kvaerner Oilfield Products, Inc. Safety device for use as overpressure protection for a trapped volume space

Also Published As

Publication number Publication date
US20060243456A1 (en) 2006-11-02
BRPI0610397A2 (en) 2016-11-08
AU2006239021A1 (en) 2006-11-02
NO20076058L (en) 2008-01-23
EP1880080A1 (en) 2008-01-23
MX2007013403A (en) 2008-01-21

Similar Documents

Publication Publication Date Title
EP1880079A2 (en) Pressure responsive centralizer
US7090027B1 (en) Casing hanger assembly with rupture disk in support housing and method
US8066074B2 (en) Systems and methods for mitigating annular pressure buildup in an oil or gas well
US10208564B2 (en) Tubular airlock assembly
AU656066B2 (en) Borehole stressed packer inflation system
Vargo et al. Practical and successful prevention of annular pressure buildup on the Marlin project
US6622798B1 (en) Method and apparatus for maintaining a fluid column in a wellbore annulus
EP2239414B1 (en) Sealing assembly
CN107923230B (en) Downhole Completion System with Sealed Caprock
EP2418348B1 (en) Filler rings for swellable packers
WO2006114609A1 (en) Pressure responsive centralizer
WO2013033208A1 (en) Trapped pressure compensator
Freyer et al. Swelling packer for zonal isolation in open hole screen completions
Hole Geothermal well design-casing and wellhead
Santos et al. APB mitigation techniques and design procedure
US10415334B2 (en) Flow guides for regulating pressure change in hydraulically-actuated downhole tools
Saltel et al. Restoring casing integrity using an expandable steel patch prior to drilling ahead with minimal reduction of next hole size
NO20210901A1 (en) Hydraulic landing nipple
EP2670944A2 (en) Downhole pressure relief apparatus
Perdana et al. Annular Pressure Build up in Subsea Well
US12060773B2 (en) Controlling a wellbore pressure
EP3052750B1 (en) Flexible zone inflow control device
RU2286443C2 (en) Well provided with production flexible rising pipe
US20220154552A1 (en) Rupture apparatus
BRPI0400320B1 (en) UNIDIRECTIONAL HYDROSTATIC PRESSURE RESTRAINT ELASTIC DEVICE FOR USE ON COATING COLUMNS FOR OIL WELLS OR SIMILAR

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2006239021

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: MX/a/2007/013403

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Ref document number: DE

ENP Entry into the national phase

Ref document number: 2006239021

Country of ref document: AU

Date of ref document: 20060425

Kind code of ref document: A

WWP Wipo information: published in national office

Ref document number: 2006239021

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2006726897

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: RU

WWE Wipo information: entry into national phase

Ref document number: 9125/DELNP/2007

Country of ref document: IN

WWW Wipo information: withdrawn in national office

Ref document number: RU

WWP Wipo information: published in national office

Ref document number: 2006726897

Country of ref document: EP

ENP Entry into the national phase

Ref document number: PI0610397

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20071026