WO2018168646A1
WO2018168646A1 PCT/JP2018/008998 JP2018008998W WO2018168646A1 WO 2018168646 A1 WO2018168646 A1 WO 2018168646A1 JP 2018008998 W JP2018008998 W JP 2018008998W WO 2018168646 A1 WO2018168646 A1 WO 2018168646A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
amount
customer
facility
time period
Prior art date
Application number
PCT/JP2018/008998
Other languages
English (en)
French (fr)
Inventor
潤一 加納
瞳 嶺岸
憲明 武田
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to JP2019505940A priority Critical patent/JP7002041B2/ja
Priority to CN201880018137.6A priority patent/CN110419151B/zh
Priority to US16/493,596 priority patent/US10833505B2/en
Publication of WO2018168646A1 publication Critical patent/WO2018168646A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present disclosure relates to a power control device for a power system including a plurality of customer facilities each provided with a power storage device.
  • the present disclosure also relates to a power system including such a power control device and a customer facility.
  • Some commercial power consumers include power storage devices and / or power generation devices in addition to various load devices that consume power in the customer facilities.
  • the power storage device By providing the power storage device, the peak value of the power consumed by the load device of the customer facility can be suppressed. Further, by providing the power generation device, it is possible to reduce the amount of commercial power consumption and its charge.
  • the price of the power storage device increases as its capacity increases. Introducing an excessively large capacity and expensive power storage device makes it difficult to recover the initial investment cost. On the other hand, if a small-capacity power storage device is used to reduce costs, it becomes easy to reach the upper limit or lower limit of the power storage amount, and the generated power is wasted or the load device cannot be supplied in the event of an emergency such as a power failure .
  • Patent Document 1 in an electric power system including a plurality of customer facilities each provided with a power storage device, it is proposed to transmit and receive power between the plurality of customer facilities.
  • the power storage rate fluctuates greatly due to charging and discharging, which facilitates the deterioration of the power storage device.
  • it is required to suppress fluctuations in the amount of stored power.
  • the purpose of the present disclosure is to provide power to a load device stably without waste while using a small-capacity power storage device, and to prevent deterioration of the power storage device between a plurality of customer facilities.
  • An object of the present invention is to provide a power control apparatus that can control power transmission / reception with a low computational load.
  • the purpose of the present disclosure is also to provide a power system including such a power control apparatus and customer equipment.
  • a power control apparatus for an electric power system including a plurality of customer facilities connected to each other via an electric power network,
  • the plurality of customer facilities each include a load device, at least one of the plurality of customer facilities further includes a power generation device, and at least two of the plurality of customer facilities further include a power storage device.
  • the power control device includes a predictor, an excess / deficiency energy calculator, a group former, and a power transmission / reception controller.
  • the predictor is Predicting the power demand of the load device of each customer facility in a unit time period, For each customer facility provided with the power generation device, predict the generated power of the power generation device of each customer facility in the unit time period, For each customer facility provided with the power storage device, the amount of power stored in the power storage device of each customer facility during the unit time period, indicating the amount of power stored when power is not transmitted to or received from another customer facility Predicting the amount of intrinsic storage, The excess / deficiency power calculator is: For each customer facility including the power generation device and the power storage device, the specific power storage amount reaches a first threshold value in the unit time period based on the demand power, the generated power, and the specific power storage amount.
  • the group former has at least one first customer facility having a surplus power amount in the unit time period, and at least a short amount of power in the unit time period among the customer facilities provided with the power storage device.
  • the power transmission / reception controller has a power storage amount of the power storage device of the first and second consumer equipments over the unit time period. Transmission power from the first consumer equipment to the second consumer equipment is determined so as to be equal to or less than a threshold value and greater than the second threshold value.
  • a plurality of power control devices are used so as to stably supply power to the load device without waste while using a small-capacity power storage device and to prevent deterioration of the power storage device. Transmission and reception between customer facilities can be controlled with a low calculation load.
  • FIG. 1 is a block diagram illustrating a configuration of a power system according to a first embodiment. It is a block diagram which shows the structure of the power control apparatus 4 of FIG. It is a figure which shows the time change of the demand electric power of the customer equipment 1 which has an insufficient electric energy in a unit time period, generated electric power, and the specific electrical storage amount. It is a figure which shows the time change of the demand electric power of the customer equipment 1 which has a surplus electric energy in a unit time period, generated electric power, and the specific electrical storage amount. It is a figure which shows the time change of the total demand electric power of the customer equipment 1 of FIG. 3A, and the customer equipment 1 of FIG.
  • FIG. 9 is a table showing exemplary groups formed by performing the grouping process of FIG. 8.
  • FIG. 11 is a table showing exemplary groups formed by performing the grouping process of FIG. 10.
  • FIG. 6 is a flowchart illustrating a power control process executed by the power control device 4 of the power system according to the second embodiment. It is a block diagram which shows the structure of 1 A of customer facilities contained in the electric power system which concerns on Embodiment 3.
  • FIG. It is a block diagram which shows the structure of the customer equipment 1B contained in the electric power system which concerns on Embodiment 3.
  • FIG. It is a block diagram which shows the structure of 1 C of customer facilities contained in the electric power system which concerns on Embodiment 3.
  • FIG. It is a block diagram which shows the structure of the electric power system which concerns on Embodiment 4.
  • FIG. It is a flowchart which shows the power control process performed by the power control apparatus 4A of FIG.
  • FIG. FIG. 1 is a block diagram illustrating a configuration of a power system according to the first embodiment.
  • the power system of FIG. 1 includes a plurality of customer facilities 1-1 to 1-4, a power network 2, a power company facility 3, and a power control device 4.
  • the plurality of customer equipments 1-1 to 1-4 are connected to each other via the power network 2, and further connected to the power company equipment 3 via the power network 2.
  • the electric power company facilities 3 include power stations, substations, power transmission networks, and distribution networks of electric power companies (electric power companies, grid operators, etc.). 4 is supplied with commercial power.
  • peak cut target power may be set by a contract between a consumer and an electric power company.
  • the customer facility 1-1 includes a customer control device 10, a load device 11, a power generation device 12, and a power storage device 13.
  • the customer facility 1-1 is one house, store, factory, or the like that includes these components.
  • the load device 11 includes various electric devices, and has power demand consumed by these electric devices.
  • the power generation device 12 generates generated power by using renewable energy such as a solar battery.
  • the power storage device 13 stores the generated power generated by the power generation device 12 or the commercial power supplied from the power company facility 3.
  • the customer control device 10 monitors the demand power of the load device 11, the generated power of the power generation device 12, and the amount of power stored in the power storage device 13, and notifies the power control device 4 of the result.
  • the customer control device 10 may be integrated with, for example, a distribution board or the like, and may be electrically connected to the distribution board or the like.
  • customer facilities 1-2 to 1-4 are configured in the same manner as the customer facility 1-1.
  • customer facilities 1-1 to 1-4 are collectively referred to as “customer facility 1”.
  • Each customer facility 1 transmits and receives power to and from each other.
  • each customer facility 1 code-modulates power with a modulation code orthogonal to each other. May be transmitted.
  • the power control device 4 controls power transmission / reception between the customer facilities 1-1 to 1-4.
  • FIG. 2 is a block diagram showing a configuration of the power control device 4 of FIG.
  • the power control device 4 includes a prediction circuit 21, an excess / deficient power amount calculation circuit 22, a grouping circuit 23, a power transmission / reception control circuit 24, and a reconfiguration determination circuit 25.
  • the prediction circuit 21 receives information about current demand power, current generated power, and current power storage amount from each customer facility 1.
  • the prediction circuit 21 further receives additional information such as weather information from a third-party server device or the like.
  • the prediction circuit 21 is based on the information received from the customer facility 1-1 in a time period (referred to as “unit time period” in this specification) from the current time to a future time of a predetermined length.
  • the power demand of the load device 11 of the customer facility 1-1 is predicted.
  • the length of the unit time period may be, for example, several hours, 24 hours, or several days.
  • the prediction circuit 21 may receive a history of power usage from the customer facility 1-1 in order to predict the demand power of the customer facility 1-1.
  • the prediction circuit 21 also predicts the generated power of the power generator 12 of the customer facility 1-1 during the unit time period based on information received from the customer facility 1-1 and based on weather information.
  • the prediction circuit 21 also stores the amount of power stored in the power storage device 13 of the customer facility 1-1 in the unit time period based on the information received from the customer facility 1-1, and the other customer facility 1-2 to A specific amount of storage indicating the amount of storage when power is not transmitted to or received from 1-4 is predicted.
  • the prediction circuit 21 predicts the demand power, generated power, and specific storage amount of the customer equipment 1-2 to 1-4 based on the information received from the customer equipment 1-2 to 1-4, respectively. To do.
  • the excess / deficient power amount calculation circuit 22 determines that the specific power storage amount has reached the first threshold value in a unit time period. The surplus electric power that is generated by the power generation device 12 and is not consumed by the load device 11 is calculated. The excess / deficient power amount calculation circuit 22 also has a specific power storage amount smaller than a first threshold value in a unit time period based on the predicted power demand, generated power, and specific power storage amount for each customer facility 1. When the second threshold value is reached, the amount of insufficient power that needs to be supplied from another customer facility 1 is calculated.
  • the first and second threshold values are upper limit values of the amount of electricity that can be operated for a long period of time so as not to cause much deterioration without applying an excessive load to the electricity storage device 13 and This is the lower limit.
  • the second threshold value is for the customer facility 1 including the power storage device 13 or in the power system in an emergency such as when a power failure occurs or when the power company facility 3 is disconnected. It may be set to the amount of power that can be supplied to all the customer facilities 1 over one to two days.
  • the first and second threshold values may be different for each power storage device 13. When the peak cut target power is set for the commercial power, the surplus power amount and the insufficient power amount may be calculated so that the portion of the demand power below the peak cut target power is obtained from the commercial power. .
  • the first threshold value is also referred to as “upper limit charge amount”
  • the second threshold value is also referred to as “lower limit charge amount”.
  • the grouping circuit 23 Based on the predicted demand power, generated power, and specific power storage amount of each customer facility 1 and the calculated surplus power amount and shortage power amount of each customer facility 1, the grouping circuit 23 A group of equipment 1 is formed.
  • the grouping circuit 23 combines at least one first customer facility 1 having a surplus electric energy in a unit time period and at least one second customer facility 1 having an insufficient electric energy in a unit time period. Thus, at least one group including the first and second customer facilities 1 is formed.
  • the power transmission / reception control circuit 24 includes the predicted demand power, generated power, and specific power storage amount of each customer facility 1, the calculated surplus power amount and insufficient power amount of each customer facility 1, and the customer facility 1.
  • the power transmission / reception between the plurality of customer facilities 1 is determined and instructed based on the group of In each group including the first and second consumer equipments 1, the power transmission / reception control circuit 24 has a first threshold for the amount of electricity stored in the power storage device 13 of the first and second consumer equipments 1 over a unit time period.
  • the transmission power from the first consumer equipment 1 to the second consumer equipment 1 is determined so as to be less than the value and greater than the second threshold value.
  • the power transmission / reception control circuit 24 instructs the first and second customer facilities 1 to transmit and receive the determined transmission power.
  • the reconfiguration determination circuit 25 detects a trigger for reconfiguring power transmission / reception among the plurality of customer facilities 1, the prediction circuit 21, the excess / deficiency power calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24 is instructed to reconfigure.
  • the prediction circuit 21, the excess / deficient power amount calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24 predict the demand power, the generated power, and the specific power storage amount, and surplus power.
  • the calculation of the amount and the amount of insufficient power, the formation of at least one group, and the determination of transmission power are repeated. Examples of the trigger for reconstruction include the following.
  • the reconfiguration determination circuit 25 may instruct the prediction circuit 21, the excess / deficient power amount calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24 to reconfigure every unit time period.
  • the reconfiguration determination circuit 25 at least one of the demand power newly generated by the prediction circuit 21, the generated power, and the specific storage amount is the demand power, the generated power, and the specific power previously predicted by the prediction circuit 21.
  • reconfiguration may be instructed to the excess / deficient power amount calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24.
  • the reconfiguration determination circuit 25 the prediction circuit 21, the excess / deficient power amount calculation circuit 22, Reconfiguration may be instructed to the grouping circuit 23 and the power transmission / reception control circuit 24.
  • the reconfiguration determination circuit 25 reconfigures the prediction circuit 21, the excess / deficient power amount calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24 when a failure or a power failure of the customer facility 1 or the power network 2 is detected. May be indicated.
  • a predetermined condition for transmitting power to the other customer facility 1 is determined. It may be determined whether or not the condition is satisfied, and power may be transmitted to another customer facility 1 only when the condition is satisfied. When the condition is not satisfied, the customer control device 10 notifies the power control device 4 that power transmission is rejected.
  • the electric power company can supply electricity when the wholesale power price rises, when the power supply and demand is tight, or when the reliability of the electric power system decreases Depending on the setting of charges or payment of incentives, control or cut off power consumption or request from customers. Therefore, in this case, the customer facility 1 must secure a part of the generated power and / or a part of the amount of stored power in order to reduce the power consumption of the commercial power.
  • the customer control device 10 is instructed by the power control device 4 to transmit power to other customer equipment 1 beyond the amount of generated power and / or stored electricity that must be secured by contract with the power company. When refusing power transmission.
  • the customer control device 10 transmits power when the total power sales or total power purchase exceeds a predetermined threshold. Alternatively, power reception may be refused.
  • the customer control apparatus 10 may refuse the power transmission or power reception with respect to the other customer equipment 1 according to a user's instruction
  • the reconfiguration determination circuit 25 also reconfigures the prediction circuit 21, the excess / deficient power amount calculation circuit 22, the grouping circuit 23, and the power transmission / reception control circuit 24 when receiving a notification of rejection of power transmission from the customer facility 1. May be indicated.
  • the prediction circuit 21, the excess / deficiency power calculation circuit 22, the grouping circuit 23, the power transmission / reception control circuit 24, and the reconfiguration determination circuit 25 are respectively referred to as a “predictor” and “over / deficiency energy calculator”.
  • the power control apparatus 4 may be implemented by hardware circuits 21 to 25 or may be implemented as a program that provides the same functions as the circuits 21 to 25 when executed by a processor.
  • FIG. 3A is a diagram illustrating temporal changes in demand power, generated power, and specific power storage amount of the customer facility 1 having a shortage of power during a unit time period.
  • FIG. 3B is a diagram illustrating changes over time in demand power, generated power, and specific power storage amount of the customer facility 1 having surplus power during a unit time period.
  • the unit time period is 24 hours.
  • the peak cut target power is set for the commercial power. According to FIG. 3A, the peak of generated electric power occurs after noon. During the morning hours when generated power is not available, demand power peaks. Of the demand power, the portion below the peak cut target power is acquired from the commercial power, and the portion exceeding the peak cut target power is acquired from the power storage device 13.
  • a portion of the demand power that exceeds the peak cut target power is an insufficient power amount.
  • the peak of generated electric power also occurs after noon in this case.
  • the portion below the demand power is supplied to the load device 11, and the portion exceeding the demand power is charged to the power storage device 13.
  • the portion of the generated power that exceeds the demand power is the surplus power amount.
  • the power control device 4 forms a group of customer facilities 1 by combining the customer facilities 1 in FIG. 3A and the customer facilities 1 in FIG. 3B.
  • FIG. 4 is a diagram showing temporal changes in the total demand power, generated power, and specific storage amount of the customer facility 1 in FIG. 3A and the customer facility 1 in FIG. 3B.
  • FIG. 4 it can be seen that the total specific power storage amount of the customer facility 1 in FIG. 3A and the customer facility 1 in FIG. 3B has not reached either the total upper limit power storage amount or the total lower limit power storage amount. . Therefore, the fluctuation
  • FIG. 5A is a diagram showing the change over time of the demand power of the customer facility 1 of FIG. 3A, the generated power, and the amount of stored electricity when power is transmitted and received within the group.
  • FIG. 5B is a diagram illustrating the change over time in the demand power of the customer facility 1 in FIG. 3B, the generated power, and the amount of stored electricity when power is transmitted and received within the group.
  • the amount of power stored in each power storage device 13 of the customer facility 1 in FIG. 3A and the customer facility 1 in FIG. 3B is determined in advance by transmitting and receiving power between these customer facilities 1. It is averaged.
  • the amount of electricity stored does not reach the lower limit amount of electricity even if discharged according to the demand power, and the amount of electricity stored does not reach the upper limit amount of electricity even if charged according to the generated power.
  • FIG. 6A is a diagram showing a change over time in the demand power of the customer facility 1 having a surplus power amount in a unit time period, the generated power, and the storage amount when power is transmitted and received within the group.
  • FIG. 6B is a diagram showing the change over time in the demand power of the customer facility 1 having a shortage of power during a unit time period, the generated power, and the amount of stored electricity when power is transmitted and received within the group.
  • 6A and 6B show an example in which the time change of the demand power is different from that in FIGS. 3A and 3B. In the case of FIG. 6A, since the demand power is smaller than in the case of FIG. 3A and FIG.
  • FIG. 7 is a flowchart showing a power control process executed by the power control device 4 of FIG.
  • the prediction circuit 21 of the power control device 4 generates the demand power and power generation of each customer facility 1 in a unit time period based on the current demand power, generated power, and specific storage amount of each customer facility 1. Predict power and specific power storage.
  • the excess / deficient power amount calculation circuit 22 of the power control device 4 determines the surplus power amount and the deficiency of each customer facility 1 in a unit time period based on the predicted demand power, generated power, and specific power storage amount. Calculate the amount of power.
  • the grouping circuit 23 of the power control apparatus 4 performs a grouping process.
  • FIG. 8 is a subroutine showing the grouping process in step S3 of FIG.
  • the grouping circuit 23 clusters (classifies) the customer facilities 1 according to the presence / absence of the surplus power amount and the insufficient power amount in the unit time period.
  • the customer facility 1 is classified into the following categories A to D.
  • C Customer facility 1 in which the specific power storage amount reaches both the upper limit power storage amount and the lower limit power storage amount in the unit time period, and has both the surplus power amount and the shortage power amount
  • D The customer facility 1 in which the specific power storage amount does not reach either the upper limit power storage amount or the lower limit power storage amount and has neither the surplus power amount nor the shortage power amount in the unit time period.
  • customer facilities 1 of categories A to D are also referred to as “first to fourth customer facilities”.
  • step S12 the grouping circuit 23 clusters customer facilities 1 according to the amount of surplus power and insufficient power.
  • the grouping circuit 23 forms a group by combining two or more customer facilities so as to substantially cancel the surplus power amount and the shortage power amount.
  • the grouping circuit 23 combines at least one category A customer facility 1 and at least one category B customer facility 1 to form at least one group including the category A and B customer facilities 1. It may be formed.
  • the grouping circuit 23 includes at least one category A customer facility 1 and at least one category B each having a total surplus power amount and a total shortage power amount that are closest to each other in a unit time period.
  • the customer equipment 1 may be combined.
  • the grouping circuit 23 combines at least one category A customer facility 1, at least one category B customer facility 1, and at least one category C customer facility 1, so that the category A At least one group including customer facilities 1 of ⁇ C may be formed.
  • the grouping circuit 23 includes at least one category A customer facility 1 and at least one category C each having a total surplus power amount and a total shortage power amount that are closest to each other in a unit time period.
  • At least one category B customer facility 1 and at least one category C customer that combine customer equipment 1 and have a total value of shortage and surplus power that are closest to each other in a unit time period.
  • Equipment 1 may be combined.
  • FIG. 9 is a table showing exemplary groups formed by executing the grouping process of FIG.
  • the power system includes a category A customer facility 1 (A-1, A-2, A-3) and a category B customer facility 1 (B-1, B-2, B-3). ), Category C customer facility 1 (C-1), and category D customer facility 1 (D-1).
  • the customer facilities A-1 and B-1 are combined, the customer facilities A-2 and B-2 are combined, and the customer facilities C-1 and A-1 are combined so as to substantially cancel the surplus power amount and the insufficient power amount.
  • -3 and B-3 are combined to form groups.
  • the customer equipment D-1 of category D does not have surplus power and insufficient power, so it is not necessary to group with other customer equipment 1.
  • the amount of surplus power and the amount of power shortage do not have to match completely.
  • the customer facility B-1 satisfies the customer facility A-1 so as to satisfy the power shortage. Even if power is transmitted in excess of the surplus power amount, the power storage amount of the power storage device 13 of the customer facility B-1 is considered to be sufficiently larger than the lower limit power storage amount.
  • the surplus power amount of the customer facility B-1 is slightly larger than the shortage power amount of the customer facility A-1, the customer facility B-1 consumes all the surplus power amount.
  • the customer equipment 1 may be combined so as to include a plurality of customer equipment 1 of the same category.
  • one group may be formed by combining two customer facilities 1 in category C, one customer facility 1 in category A, and two customer facilities 1 in category B.
  • the distance between customer equipment 1 , Etc. may be considered.
  • the distance between customer equipment 1 , Etc. may be considered.
  • transmitting and receiving power there is a high possibility that the surplus power amount and the insufficient power amount can be successfully resolved.
  • step S7 If the time when the surplus power amount is generated and the time when the shortage power amount are separated, as will be described in step S7 to be described later, the conditions such as demand power and generated power change, so that the surplus power amount and There is a possibility of failing to solve the insufficient power. Moreover, the loss by power transmission / reception becomes small, so that the distance between the customer facilities 1 which transmit / receive power is short. Therefore, you may form the group of the customer equipment 1 so that the loss by power transmission / reception may be reduced as follows.
  • FIG. 10 is a subroutine showing a modification of the grouping process in step S3 of FIG.
  • the grouping circuit 23 clusters the customer equipment 1 according to the presence / absence of the surplus power amount and the insufficient power amount, as in step S11 of FIG.
  • step S22 the grouping circuit 23 clusters the customer facilities 1 according to the amount of surplus power and insufficient power, the generation time, and the location.
  • step S23 the grouping circuit 23 forms a group by combining two or more customer facilities so as to substantially cancel the surplus power amount and the shortage power amount.
  • the grouping circuit 23 includes a total value of surplus electric energy and a total value of insufficient electric energy that are closer to each other than a predetermined threshold value (also referred to as “third threshold value” in this specification) in a unit time period.
  • a predetermined threshold value also referred to as “third threshold value” in this specification
  • category A and B customer facilities 1 are as follows: At least one group may be formed.
  • the grouping circuit 23 has at least one surplus power amount and a shortage power amount in the partial time period closest to each other in the unit time period among the customer facilities 1 of the categories A and B of each available combination.
  • One category A customer facility 1 and at least one category B customer facility 1 may be combined.
  • the grouping circuit 23 includes at least one category A customer facility 1 and at least one category provided in a location closest to each other among the available category A and B customer facilities 1.
  • B customer facilities 1 may be combined.
  • the grouping circuit 23 includes at least one category A customer facility 1 and at least 1 each having a total value of surplus power and a total value of shortage of power that are closer to each other than the third threshold value in a unit time period.
  • a plurality of combinations of customer equipment 1 of one category C can be used, and the total value of the insufficient power amount and the total value of the surplus power amount that are closer to each other than the third threshold value in the unit time period, respectively.
  • a plurality of combinations of at least one category B customer facility 1 and at least one category C customer facility 1 is available, including at least one category A-C customer facility 1 as follows:
  • One group may be formed.
  • the grouping circuit 23 has at least one surplus power amount and a shortage power amount in the partial time periods closest to each other in the unit time periods among the available customer facilities 1 of the categories A and C of each combination.
  • One category A customer facility 1 and at least one category C customer facility 1 may be combined.
  • the grouping circuit 23 has an insufficient power amount and a surplus power amount in the partial time periods closest to each other in the unit time periods among the customer facilities 1 of each category B and C that can be used.
  • At least one category B customer facility 1 and at least one category C customer facility 1 may be combined.
  • the grouping circuit 23 includes at least one category A customer facility 1 and at least one category provided at a location closest to each other among the available category A and C customer facilities 1.
  • C customer equipment 1 may be combined.
  • the grouping circuit 23 includes at least one category B customer facility 1 and at least one category provided in a location closest to each other among the available category B and C customer facilities 1.
  • C customer equipment 1 may be combined.
  • both the generation time of the surplus power amount and the insufficient power amount and the location of the customer equipment 1 may be considered.
  • FIG. 11 is a table showing exemplary groups formed by executing the grouping process of FIG.
  • the power system includes a category A customer facility 1 (A-1, A-2, A-3) and a category B customer facility 1 (B-1, B-2, B-3). ).
  • customer equipment A-2, B-2 provided at the same place or close to each other
  • customer equipment A-3, B-3 provided at the same place or close to each other, Each forms a group.
  • the success rate of power transmission / reception between the customer facilities 1 as a result of past grouping may be considered.
  • step S ⁇ b> 4 the power transmission / reception control circuit 24 of the power control device 4 determines the predicted demand power, generated power, and specific power storage amount of each customer facility 1, and each customer facility 1. Based on the calculated surplus power amount and shortage power amount and the group of the customer facility 1, in each group, the total value of the demand power of the customer facility 1, the total value of the generated power, and the total value of the stored electricity amount Calculate
  • step S5 the power transmission / reception control circuit 24 determines the transmission power and the reception power of each customer facility 1 in each group.
  • the power transmission / reception control circuit 24 is configured so that the power storage amount does not reach the upper limit power storage amount and the lower limit power storage amount so that the surplus power amount and the insufficient power amount do not occur in each customer facility 1 and Transmitted power and received power are determined so as to minimize fluctuations in the amount of stored electricity.
  • the power transmission / reception control circuit 24 causes the power storage amount of the power storage device 13 of the customer facility 1 to be equal to or lower than the upper limit charge amount and equal to or higher than the lower limit charge amount over a unit time period.
  • the power transmission / reception control circuit 24 has the power storage amount of the power storage device 13 of each customer facility 1 equal to or lower than the upper limit power storage amount and higher than the lower limit power storage amount over a unit time period. As described above, the transmission power from the category A customer facility 1 to the category C customer facility 1 and the transmission power from the category C customer facility 1 to the category B customer facility 1 are determined. The power transmission / reception control circuit 24 does not allow the category D customer facility 1 to transmit / receive power to / from other customer facilities 1.
  • step S6 the power transmission / reception control circuit 24 instructs each customer facility 1 to transmit and receive power.
  • step S7 the reconfiguration determination circuit 25 of the power control device 4 determines whether or not a trigger for reconfiguring power transmission / reception between the plurality of customer facilities 1 is detected. If YES, the process returns to step S1. If NO, step S7 is repeated.
  • step S5 When the power determined in step S5 is transmitted / received between the customer facilities 1 of each group determined in step S3, if conditions such as demand power and generated power change, the specific power storage amount, surplus power The amount of power and the amount of insufficient power also change. As a result, a new surplus power amount or a new insufficient power amount is generated, and there is a possibility that power cannot be transmitted / received with the fixed group, the transmitted power, and the received power. Therefore, the reconfiguration determination circuit 25 reconfigures power transmission and reception between the customer facilities 1 when detecting the following trigger.
  • power transmission and reception may be reconfigured for each unit time period as the first trigger.
  • the change of the demand power for every day of the week, the change of the demand power by a weekday or a holiday can be tracked.
  • At least one of the demand power newly generated by the prediction circuit 21, the generated power, and the specific storage amount is the demand power, the generated power previously predicted by the prediction circuit 21, and
  • the power transmission / reception may be reconfigured when it is different from the inherent power storage amount.
  • the power transmission and reception may be reconfigured. As a result, it is possible to cope with the interruption of power transmission and reception caused by unexpected natural disasters and accidents.
  • power transmission / reception may be reconfigured. Thereby, it is possible to cope with interruption of power transmission / reception caused by failure of the customer facility 1 (load device 11, power generation device 12, power storage device 13) and power network 2.
  • power transmission / reception when power transmission / reception instructed from the power control device 4 to the customer facility 1 is not performed due to an unknown cause, power transmission / reception may be reconfigured. It is also possible to cope with cases where the cause of obstructing power transmission / reception is unknown and whether it is possible to carry out power transmission / reception thereafter is unknown.
  • the third to fifth triggers are detected later when power transmission / reception is interrupted, whereas the first and second triggers can be detected in advance. If the actual demand power and generated power differ from the predicted demand power and generated power beyond the allowable error, there is a possibility that power transmission / reception cannot be performed for a certain period, but using the first or second trigger Such interruption of power transmission / reception can be avoided.
  • the reconfiguration determination circuit 25 detects a trigger for reconfiguring power transmission / reception between the plurality of customer facilities 1, the reconfiguration determination circuit 25 to the prediction circuit 21 and the excess / deficient power amount calculation circuit 22 as described above.
  • the grouping circuit 23 and the power transmission / reception control circuit 24 are instructed to reconfigure.
  • FIGS. 12A to 13B An example in the case where it is necessary to reconfigure power transmission / reception between a plurality of customer facilities 1 will be described with reference to FIGS. 12A to 13B.
  • FIG. 12A is a diagram showing a change over time of demand power, generated power, specific power storage amount, and estimated power storage amount when power is transmitted and received within a group, which is predicted based on a user's return time for a certain customer facility 1. is there.
  • FIG. 12B is a diagram illustrating temporal changes in the actual demand power, generated power, and storage amount of the same customer facility 1 as in FIG. 12A.
  • the power control device 4 instructs the other customer equipment 1 to transmit power.
  • FIG. 12A before the user returns home and the demand power increases, it is predicted that the specific power storage amount reaches the upper limit power storage amount and the surplus power amount is generated.
  • the power control device 4 instructs the other customer equipment 1 to transmit power.
  • FIG. 12A before the user returns home and the demand power increases, it is predicted that the specific power storage amount reaches the upper limit power storage amount and the surplus power amount is generated.
  • the power control device 4 instructs the other customer equipment 1 to transmit power.
  • FIG. 12A before the user returns home
  • the power control device 4 reconfigures the power transmission and reception so as not to transmit power to the other customer equipment 1 when detecting the return home of the user.
  • FIG. 13A is a diagram illustrating a demanded power, generated power, a specific power storage amount, and a time change of a planned power storage amount when power is transmitted and received within a group, which is predicted based on the weather for a certain customer facility 1.
  • FIG. 13B is a diagram illustrating temporal changes in the actual demand power, generated power, and storage amount of the same customer facility 1 as in FIG. 13A.
  • the electric power generated by the power generation device 12 that is a solar cell is predicted based on weather information.
  • the generated power is reduced due to the occurrence of rain clouds. For this reason, the power control device 4 reconfigures power transmission and reception when detecting a change in weather.
  • power is stably supplied to the load device 11 without waste while using the small-capacity power storage device 13, and the power storage device 13 is not easily deteriorated.
  • the power transmission / reception between the plurality of customer facilities 1 can be controlled with a low calculation load.
  • At least one group of a plurality of customer facilities 1 each provided with power storage device 13 is formed, and power is transmitted and received between customer facilities 1 of each group. Therefore, it is possible to stably supply power to the load device 11 of each customer facility 1 while using the small capacity power storage device 13 without waste.
  • the surplus power amount when the upper limit power storage amount of the power storage device 13 is reached is transmitted to another customer facility 1, and the lower limit power storage of the power storage device 13 is performed.
  • the amount of power shortage when the amount is reached is received from another customer facility 1. Therefore, the power storage amount of the power storage device 13 of each customer facility 1 can be set to be equal to or lower than the upper limit power storage amount and equal to or higher than the lower limit power storage amount.
  • the amount of power to be transmitted / received is minimized, loss due to power transmission / reception can be reduced.
  • the demand power, generated power, and specific power storage amount in the unit time period are predicted, and the customer facility 1 having the surplus power amount in the unit time period, and the insufficient power in the unit time period.
  • a group is formed by combining the customer facilities 1 having a quantity.
  • wasteful power transmission / reception between the customer facilities 1 can be prevented by considering the total demand power, generated power, and specific power storage amount in a unit time period. .
  • the calculation load is reduced.
  • clustering is performed as shown in FIGS. 8 to 11, it is determined whether or not to perform power transmission / reception only for the combination of the customer equipment 1 having the surplus power amount and the shortage power amount close to each other in the unit time period.
  • the calculation load can be reduced. For the customer facility 1 that does not have surplus power and insufficient power, it is not necessary to determine whether or not to perform power transmission and reception, and the calculation load can be further reduced.
  • demand power and supply electric power can be balanced in each group. It is considered that fluctuations in the amount of stored electricity can be minimized by forming a group of customer facilities 1 so as to balance demand power and supply power.
  • the power generation is performed in the customer facility 1 itself or in other customer facilities 1 included in the same group. Electricity can be consumed without waste (that is, the amount of power sold can be reduced).
  • Embodiment 2 has at least an upper limit storage amount and a lower limit storage amount of the power storage device 13 of each customer facility 1 during a normal time when commercial power is available and an emergency when commercial power is not available due to a power failure or the like. One may be changed. Thereby, the amount of power charged and discharged by the power storage device 13 can be increased in an emergency.
  • the power system according to the second embodiment is configured similarly to the power system according to the first embodiment.
  • FIG. 14 is a flowchart showing a power control process executed by the power control device 4 of the power system according to the second embodiment.
  • step S31 the power control device 4 calculates the upper limit storage amount and the lower limit storage amount in an emergency. If the upper limit power storage amount and the lower limit power storage amount in an emergency are short-term, the power storage device 13 can operate the power storage device 13 without causing excessive degradation without imposing an excessive load on the power storage device 13.
  • the upper limit storage amount in emergency may be set higher than the upper limit storage amount in normal time, and the lower limit storage amount in emergency may be set lower than the lower limit storage amount in normal time.
  • step S32 the power control apparatus 4 determines whether or not commercial power is available. If YES, the process proceeds to step S35, and if NO, the process proceeds to step S33.
  • step S33 the power control device 4 sets the value of the commercial power used when calculating the surplus power amount and the shortage power amount to zero in the over / under power amount calculation circuit 22.
  • step S ⁇ b> 34 the power control device 4 sets the upper limit storage amount and the lower limit storage amount in an emergency in the excess / deficient power amount calculation circuit 22.
  • step S35 the power control device 4 sets the peak cut target power of the commercial power used when calculating the surplus power amount and the shortage power amount in the over / under power amount calculation circuit 22.
  • step S ⁇ b> 36 the power control device 4 sets the upper limit storage amount and the lower limit storage amount at the normal time in the excess / deficiency power amount calculation circuit 22.
  • Steps S37 to S42 are the same as steps S1 to S6 in FIG.
  • a group may be formed so that the customer equipment 1 of category D is combined with the customer equipment 1 of categories A to C in the grouping process of step S39.
  • the power storage device 13 of the category D customer facility 1 can be effectively utilized in an emergency.
  • step S42 similarly to step S7 in FIG. 7, it may be determined whether or not a trigger for reconfiguring power transmission / reception between the plurality of customer facilities 1 has been detected.
  • At least one of the upper limit storage amount and the lower limit storage amount is changed according to whether or not commercial power is available, so that each customer facility 1 can be used in an emergency.
  • the power storage device 13 can be used effectively.
  • a buffer for the storage amount for an emergency can be secured.
  • Embodiment 3 Each customer facility of the power system is not limited to one including all of the load device 11, the power generation device 12, and the power storage device 13 as shown in FIG.
  • the power system may include customer equipment that does not include the power generation device 12, and may include customer equipment that does not include the power storage device 13.
  • FIG. 15 is a block diagram illustrating a configuration of a customer facility 1A included in the power system according to the third embodiment.
  • a customer facility 1 ⁇ / b> A customer control device 10 ⁇ / b> A, a load device 11, and a power storage device 13 are provided.
  • the customer control device 10A is configured similarly to the customer control device 10 of FIG. 1 except that the generated power of the power generation device is not monitored.
  • FIG. 16 is a block diagram illustrating a configuration of a customer facility 1B included in the power system according to the third embodiment.
  • the customer facility 1B includes a customer control device 10B, a load device 11, and a power generation device 12.
  • the customer control device 10B is configured in the same manner as the customer control device 10 of FIG. 1 except that the power storage amount of the power storage device is not monitored.
  • FIG. 17 is a block diagram illustrating a configuration of a customer facility 1C included in the power system according to the third embodiment.
  • the customer facility 1 ⁇ / b> C includes a customer control device 10 ⁇ / b> C and a load device 11.
  • the customer control device 10C is configured in the same manner as the customer control device 10 of FIG. 1 except that the generated power of the power generation device 12 and the amount of power stored in the power storage device are not monitored.
  • all customer facilities each include a load device 11.
  • at least one of the customer facilities (the customer facilities 1 and 1B) further includes a power generation device 12.
  • at least two of the customer facilities (the customer facilities 1 and 1A) further include a power storage device 13.
  • the power system according to Embodiment 3 includes all of the customer equipment 1 in FIG. 1, the customer equipment 1A in FIG. 15, the customer equipment 1B in FIG. 16, and the customer equipment 1C in FIG. It shall be.
  • the power control device 4 according to the third embodiment is configured in the same manner as the power control device 4 according to the first embodiment.
  • the prediction circuit 21 the excess / deficient power amount calculation circuit 22, and the grouping circuit 23.
  • the prediction circuit 21 predicts the generated power of the power generator 12 of each customer facility 1, 1B in a unit time period for each customer facility 1, 1B including the power generator 12.
  • the prediction circuit 21 is the amount of power stored in the power storage device 13 of each customer facility 1, 1A for each customer facility 1, 1A including the power storage device 13, and the other customer facilities 1, 1A to The specific amount of storage indicating the amount of storage when power is not transmitted to or received from 1C is predicted.
  • the excess / deficient power amount calculation circuit 22 sets the upper limit storage amount in the unit time period for each customer facility 1 including the power generation device 12 and the storage device 13 based on the demand power, the generated power, and the specific storage amount.
  • the surplus power amount that is generated by the power generation device 12 and is not consumed by the load device 11 when the power reaches the value is calculated.
  • the excess / deficient power amount calculation circuit 22 is based on the demand power and the specific power storage amount, or based on the demand power, the generated power, and the specific power storage amount for each of the customer facilities 1 and 1A including the power storage device 13.
  • the specific power storage amount reaches the lower limit power storage amount during the time period, the shortage power amount that needs to be supplied from the other customer facilities 1, 1A to 1C is calculated.
  • the excess / deficient power amount calculation circuit 22 is generated by the power generation device 12 in a unit time period for each customer facility 1B including the power generation device 12 and not including the power storage device 13 based on the demand power and the generated power.
  • the surplus power amount that is not consumed by the load device 11 is calculated, and the shortage power amount that needs to be supplied from the other customer facilities 1, 1A to 1C in the unit time period is calculated.
  • the excess / deficient power amount calculation circuit 22 supplies each customer facility 1C that does not include the power generation device 12 and the power storage device 13 from the other customer facilities 1, 1A to 1C in a unit time period based on the demand power. Calculate the amount of power shortage that needs to be received.
  • both surplus power and insufficient power may occur.
  • the customer facility 1A of FIG. 15 and the customer facility 1C of FIG. 17 there is a possibility that a shortage of electric power may be generated, but no surplus power is generated because the power generation device is not provided.
  • the grouping circuit 23 includes at least one surplus power amount in a unit time period so as to include at least one customer facility 1, 1A including the power storage device 13 among the plurality of customer facilities 1, 1A-1C.
  • the power control device 4 includes at least one surplus power amount in a unit time period so as to include at least one customer facility 1, 1A including the power storage device 13 among the plurality of customer facilities 1, 1A to 1C.
  • First consumer equipment 1, 1B, at least one second consumer equipment 1, 1A-1C having a shortage of electric power in a unit time period, and both surplus electric power and shortage of electric power in a unit time period By combining at least one third customer facility 1, 1B having at least one group including the first to third customer facilities 1, 1A-1C.
  • the power transmission / reception control circuit 24 limits the amount of electricity stored in the electricity storage device 13 of each customer equipment 1 including the electricity storage device 13 over a unit time period.
  • the transmission power from the first customer facility 1, 1B to the second customer facility 1, 1A-1C is determined so as to be less than the stored amount and greater than the lower limit stored amount.
  • the power transmission / reception control circuit 24 determines that the amount of electricity stored in the electricity storage device 13 of each customer equipment 1 and 1A including the electricity storage device 13 is a unit time period.
  • the transmission power to the second customer facility 1, 1A to 1C is determined.
  • the group of customer facilities 1, 1A to 1C is formed as follows, for example.
  • the grouping circuit 23 includes at least one first demand having a total value of surplus power and a total value of shortage of power that are closest to each other in a unit time period among the plurality of customer facilities 1, 1A to 1C. By combining the house facilities 1, 1B and at least one second customer facility 1, 1A-1C, at least one group including the first and second consumer facilities 1, 1A-1C may be formed. Good. In addition, the grouping circuit 23 has at least one first power having the total value of the surplus power and the total value of the shortage of power that are closest to each other in the unit time period among the plurality of customer facilities 1, 1A to 1C.
  • the customer facilities 1, 1B and at least one third customer facility 1, 1B, and each having at least one total amount of shortage and surplus power closest to each other in a unit time period By combining the second customer equipment 1, 1A-1C and at least one third customer equipment 1, 1B, at least one group including the first to third customer equipment 1, 1A-1C is obtained. It may be formed.
  • the grouping circuit 23 includes at least one first customer facility 1, 1B having a total value of surplus power and a total value of shortage of power that are closer to each other than the third threshold value in a unit time period, respectively.
  • at least one group comprising the first and second customer facilities 1, 1A-1C as follows: May be formed.
  • the grouping circuit 23 uses the surplus power amount and the shortage power amount in the partial time period closest to each other in the unit time period among the first and second customer facilities 1 and 1A to 1C of each available combination. May be combined with at least one first customer facility 1, 1B and at least one second customer facility 1, 1A-1C.
  • the grouping circuit 23 includes at least one first customer facility 1, 1B provided at a location closest to each other among the first and second customer facilities 1, 1A to 1C of each available combination. And at least one second customer facility 1, 1A-1C.
  • the grouping circuit 23 includes at least one first customer facility 1, 1B having a total value of surplus power and a total value of shortage of power that are closer to each other than the third threshold value in a unit time period, respectively.
  • a plurality of combinations of at least one third customer facility 1, 1B are available, and the total value of surplus power and surplus power that are closer to each other than the third threshold value in a unit time period
  • the first ⁇ At least one group including the third customer facilities 1, 1A to 1C may be formed.
  • the grouping circuit 23 sets the surplus power amount and the shortage power amount in the partial time periods closest to each other in the unit time period among the first and third consumer equipments 1 and 1B of each available combination.
  • the at least one first customer facility 1, 1B and the at least one third customer facility 1, 1B may be combined.
  • the grouping circuit 23 has a shortage of power and a surplus power in the partial time periods closest to each other in the unit time periods among the second and third customer equipments 1 and 1A to 1C of each available combination. May be combined with at least one second customer facility 1, 1A-1C and at least one third customer facility 1, 1B, respectively.
  • the grouping circuit 23 includes at least one first customer facility 1, 1B and at least one of the first and third customer facilities 1, 1 ⁇ / b> B of each combination that can be used, which are provided closest to each other.
  • One third customer facility 1, 1B may be combined.
  • the grouping circuit 23 includes at least one second customer facility 1, 1A provided at a location closest to each other among the second and third customer facilities 1, 1A-1C of each available combination. ⁇ 1C and at least one third customer facility 1, 1B may be combined.
  • the grouping circuit 23 When the grouping circuit 23 forms a group of the customer facilities 1, 1A to 1C, it takes into account both the generation time of the surplus power amount and the insufficient power amount and the location of the customer facilities 1, 1A to 1C. Also good.
  • a group including only the customer facility 1C is not formed. This is because the customer facility 1 ⁇ / b> C in FIG. 17 does not have surplus power.
  • a group including only the customer facility 1A in FIG. 15 may be formed, and a group including the customer facility 1A in FIG. 15 and the customer facility 1C in FIG. May be.
  • the power storage device may be charged with commercial power (such as nighttime power), but these groups are not formed when commercial power is not available due to a power failure or the like.
  • the load device can be stably used without waste while using the small-capacity power storage device 13. 11, power transmission / reception between a plurality of customer facilities 1 can be controlled with a low calculation load so that power is supplied to the power storage device 11 and deterioration of the power storage device 13 hardly occurs.
  • FIG. 18 is a block diagram illustrating a configuration of a power system according to the fourth embodiment.
  • the power system of FIG. 18 includes a plurality of power grid facilities 101-1 to 101-4, a power network 2, a power company facility 3, and a power control device 4A.
  • the power grid facility 101-1 includes a plurality of customer facilities 1-1 to 1-4 and a power grid control device 5.
  • the customer equipment 1-1 to 1-4 of the power grid equipment 101-1 are the customer equipment 1 in FIG. 1, the customer equipment 1A in FIG. 15, the customer equipment 1B in FIG. 16, or the customer equipment in FIG.
  • the configuration is the same as 1C.
  • the power grid control device 5 monitors the demand power of the load device 11 of each customer facility 1 included in the power grid facility 101-1, the generated power of the power generation device 12, and the amount of power stored in the power storage device 13, and the result is obtained. Notify the power control device 4A.
  • power grid facility 101 Other power grid facilities 101-2 to 101-4 are also configured similarly to the power grid facility 101-1.
  • the power grid facilities 101-1 to 101-4 are collectively referred to as “power grid facility 101”.
  • the power control device 4A is configured in substantially the same manner as the power control device 4 in FIG. 2, and includes a prediction circuit, an excess / deficiency power calculation circuit, a grouping circuit, a power transmission / reception control circuit, and a reconfiguration determination circuit.
  • the prediction circuit of the power control device 4A predicts the demand power of the load device 11 of each power grid facility 101 in a unit time period.
  • the prediction circuit of the power control device 4A predicts the generated power of the power generation device 12 of each power grid facility 101 during a unit time period for each power grid facility 101 including the power generation device 12.
  • the prediction circuit of the power control device 4 ⁇ / b> A is, for each power grid facility 101 including the power storage device 13, the amount of power stored in the power storage device 13 of each power grid facility 101 in a unit time period, with respect to the other power grid facilities 101.
  • a specific amount of electricity that indicates the amount of electricity stored when power is not transmitted or received is predicted.
  • the excess / deficient power amount calculation circuit of the power control device 4 ⁇ / b> A has a specific power storage amount in a unit time period for each power grid facility 101 including the power generation device 12 and the power storage device 13 based on demand power, generated power, and specific power storage amount. Is calculated by calculating the surplus electric power that is generated by the power generation device 12 and is not consumed by the load device 11 when the first threshold value is reached.
  • the excess / deficient power amount calculation circuit of the power control device 4A is based on the demand power and the specific power storage amount, or based on the demand power, the generated power, and the specific power storage amount for each power grid facility 101 including the power storage device 13.
  • the amount of insufficient power that needs to be supplied from the other power grid equipment 101 is calculated when the specific power storage amount reaches the second threshold value smaller than the first threshold value during the unit time period.
  • the grouping circuit of the power control device 4 ⁇ / b> A includes at least one first power grid facility 101 having a surplus power amount in a unit time period among the power grid facilities 101 including the power storage device 13, and insufficient power in the unit time period. By combining at least one second power grid facility 101 having a quantity, at least one group including the first and second power grid facilities 101 is formed.
  • the power transmission / reception control circuit of the power control device 4A has the power storage amount of the power storage devices 13 of the first and second power grid facilities 101 over the unit time period.
  • the transmission power from the first power grid equipment 101 to the second power grid equipment 101 is determined so as to be less than or equal to the first threshold value and greater than or equal to the second threshold value.
  • FIG. 19 is a flowchart showing a power control process executed by the power control device 4A of FIG.
  • step S ⁇ b> 51 the prediction circuit of the power control device 4 ⁇ / b> A determines the demand power and generated power of each power grid facility 101 in a unit time period based on the current demand power, generated power, and specific storage amount of each power grid facility 101. , And the amount of specific power storage is predicted.
  • step S52 the excess / deficient power amount calculation circuit of the power control device 4A, based on the predicted demand power, generated power, and specific storage amount, the surplus power amount and the insufficient power of each power grid facility 101 in the unit time period. Calculate the quantity.
  • step S53 the grouping circuit of the power control device 4A executes a grouping process.
  • step S54 the power transmission / reception control circuit of the power control device 4A determines the predicted demand power, generated power, and specific power storage amount of each power grid facility 101, and the calculated surplus power amount and shortage of each power grid facility 101. Based on the power amount and the group of the power grid facility 101, the total value of the demand power of the power grid facility 101, the total value of the generated power, and the total value of the stored power amount are calculated in each group.
  • step S55 the power transmission / reception control circuit of the power control device 4A determines the transmission power and the reception power of each power grid facility 101 in each group.
  • step S56 the power transmission / reception control circuit of the power control device 4A instructs each power grid facility 101 to transmit and receive power.
  • step S57 the reconfiguration determination circuit of the power control device 4A determines whether or not a trigger for reconfiguring power transmission / reception between the plurality of power grid facilities 101 is detected. If YES, the process returns to step S51. If NO, step S57 is repeated.
  • the present invention is applicable to a power system having a larger scale than the power system according to the first embodiment.
  • the power system according to each embodiment can be applied to a power network and customer equipment that are not connected to commercial power.
  • the electric power system according to the present disclosure can be realized as a “local production for local consumption type electric power system” that consumes generated electric power generated in a certain customer facility at the customer facility or a nearby customer facility.
  • a small-capacity power storage device it is possible to reduce the initial investment cost of the power storage device, minimize fluctuations in the amount of power storage, and operate the power storage device 13 for a long period of time so as not to cause much deterioration.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

電力制御装置(4)は、負荷装置(11)の需要電力、発電装置(12)の発電電力、及び蓄電装置(13)の固有蓄電量を予測する。電力制御装置(4)は、固有蓄電量が上限蓄電量に達しているときの余剰電力量を計算し、固有蓄電量が下限蓄電量に達しているときの不足電力量を計算する。電力制御装置(4)は、余剰電力量を有する少なくとも1つの第1の需要家設備(1)と、不足電力量を有する少なくとも1つの第2の需要家設備(1)とを組み合わせて少なくとも1つのグループを形成する。電力制御装置(4)は、各グループにおいて、第1及び第2の需要家設備(1)の蓄電装置(13)の蓄電量が上限蓄電量以下かつ下限蓄電量以上になるように、第1の需要家設備(1)から第2の需要家設備(1)への送電電力を決定する。

Description

電力制御装置及び電力システム
 本開示は、蓄電装置をそれぞれ備えた複数の需要家設備を含む電力システムのための電力制御装置に関する。本開示はまた、そのような電力制御装置及び需要家設備を含む電力システムに関する。
 商用電力の需要家には、その需要家設備において、電力を消費するさまざまな負荷装置に加えて、蓄電装置及び/又は発電装置を備えたものがある。蓄電装置を備えることにより、需要家設備の負荷装置で消費される電力のピーク値を抑制することができる。また、発電装置を備えることにより、商用電力の消費電力量及びその料金を低減することができる。
 日本国では、再生可能エネルギーの固定価格買取制度(FIT)が2019年に終了することが予定されている。これに伴い、ある需要家設備の発電装置で発電された電力を同じ需要家設備の負荷装置で無駄なく消費するために、蓄電装置の需要が増えると予想される。
 蓄電装置は、その容量が高くなるほど、価格が増大する。過度に大容量かつ高価な蓄電装置を導入すると、その初期投資費用の回収が困難になる。一方、費用を下げるために小容量の蓄電装置を用いると、蓄電量の上限又は下限に達しやすくなり、発電電力が無駄になったり、停電などの緊急時に負荷装置に電力を供給できなくなったりする。
 このため、例えば特許文献1のように、蓄電装置をそれぞれ備えた複数の需要家設備を含む電力システムにおいて、複数の需要家設備の間で送受電することが提案されている。
国際公開第2015/121937号
 小容量の蓄電装置を用いる場合、充電及び放電により蓄電率が大きく変動するので、蓄電装置の劣化がすすみやすくなる。蓄電装置の劣化を防止して保守費用などの増大を抑えるためには、蓄電量の変動を抑制することが求められる。
 また、複数の需要家設備の間で送受電する場合、何らかの指標を最適化するように需要家設備のすべての組み合わせについて計算すると、計算負荷が非常に高くなる。従って、送受電する需要家設備の組み合わせを低い計算負荷で決定することが求められる。
 本開示の目的は、小容量の蓄電装置を使用しながら、無駄なく安定的に負荷装置に電力を供給するように、かつ、蓄電装置の劣化を生じにくいように、複数の需要家設備の間の送受電を低い計算負荷で制御することができる電力制御装置を提供することにある。
 本開示の目的はまた、そのような電力制御装置及び需要家設備を含む電力システムを提供することにある。
 本開示の一態様に係る電力制御装置は、
 電力網を介して互いに接続された複数の需要家設備を含む電力システムのための電力制御装置であって、
 前記複数の需要家設備は負荷装置をそれぞれ備え、前記複数の需要家設備のうちの少なくとも1つは発電装置をさらに備え、前記複数の需要家設備のうちの少なくとも2つは蓄電装置をさらに備え、
 前記電力制御装置は、予測器と、過不足電力量計算器と、グループ形成器と、送受電制御器とを備え、
 前記予測器は、
 単位時間期間における前記各需要家設備の前記負荷装置の需要電力を予測し、
 前記発電装置を備える各需要家設備について、前記単位時間期間における前記各需要家設備の前記発電装置の発電電力を予測し、
 前記蓄電装置を備える各需要家設備について、前記単位時間期間における前記各需要家設備の前記蓄電装置の蓄電量であって、他の需要家設備に対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測し、
 前記過不足電力量計算器は、
 前記発電装置及び前記蓄電装置を備える各需要家設備について、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が第1のしきい値に達しているときに前記発電装置によって発電されて前記負荷装置によって消費されない余剰電力量を計算し、
 前記蓄電装置を備える各需要家設備について、前記需要電力及び前記固有蓄電量に基づいて、又は、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が前記第1のしきい値より小さい第2のしきい値に達しているときに他の需要家設備から供給を受ける必要がある不足電力量を計算し、
 前記グループ形成器は、前記蓄電装置を備える各需要家設備のうち、前記単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備と、前記単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備とを組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成し、
 前記送受電制御器は、前記第1及び第2の需要家設備を含む各グループにおいて、前記第1及び第2の需要家設備の前記蓄電装置の蓄電量が前記単位時間期間にわたって前記第1のしきい値以下かつ前記第2のしきい値以上になるように、前記第1の需要家設備から前記第2の需要家設備への送電電力を決定する。
 本開示に係る電力制御装置によれば、小容量の蓄電装置を使用しながら、無駄なく安定的に負荷装置に電力を供給するように、かつ、蓄電装置の劣化を生じにくいように、複数の需要家設備の間の送受電を低い計算負荷で制御することができる。
実施形態1に係る電力システムの構成を示すブロック図である。 図1の電力制御装置4の構成を示すブロック図である。 単位時間期間において不足電力量を有する需要家設備1の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。 単位時間期間において余剰電力量を有する需要家設備1の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。 図3Aの需要家設備1及び図3Bの需要家設備1の合計の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。 図3Aの需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。 図3Bの需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。 単位時間期間において余剰電力量を有する需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。 単位時間期間において不足電力量を有する需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。 図1の電力制御装置4によって実行される電力制御処理を示すフローチャートである。 図7のステップS3のグループ化処理を示すサブルーチンである。 図8のグループ化処理を実行することによって形成された例示的なグループを示す表である。 図7のステップS3のグループ化処理の変形例を示すサブルーチンである。 図10のグループ化処理を実行することによって形成された例示的なグループを示す表である。 ある需要家設備1についてユーザの帰宅時間に基づいて予測された、需要電力、発電電力、固有蓄電量、及びグループ内で送受電したときの予定蓄電量の時間変化を示す図である。 図12Aと同じ需要家設備1の実際の需要電力、発電電力、及び蓄電量の時間変化を示す図である。 ある需要家設備1について天気に基づいて予測された、需要電力、発電電力、固有蓄電量、及びグループ内で送受電したときの予定蓄電量の時間変化を示す図である。 図13Aと同じ需要家設備1の実際の需要電力、発電電力、及び蓄電量の時間変化を示す図である。 実施形態2に係る電力システムの電力制御装置4によって実行される電力制御処理を示すフローチャートである。 実施形態3に係る電力システムに含まれる需要家設備1Aの構成を示すブロック図である。 実施形態3に係る電力システムに含まれる需要家設備1Bの構成を示すブロック図である。 実施形態3に係る電力システムに含まれる需要家設備1Cの構成を示すブロック図である。 実施形態4に係る電力システムの構成を示すブロック図である。 図18の電力制御装置4Aによって実行される電力制御処理を示すフローチャートである。
 以下、図面を参照して、本開示の実施形態について説明する。
実施形態1.
 図1は、実施形態1に係る電力システムの構成を示すブロック図である。図1の電力システムは、複数の需要家設備1-1~1-4、電力網2、電力会社設備3、及び電力制御装置4を含む。
 複数の需要家設備1-1~1-4は、電力網2を介して互いに接続され、さらに、電力網2を介して電力会社設備3に接続されている。
 電力会社設備3は、電力会社(電気事業者、系統運用者など)の発電所、変電所、送電網、及び配電網などを含み、電力網2を介して各需要家設備1-1~1-4に商用電力を供給する。商用電力には、需要家と電力会社との契約により、ピークカット目標電力が設定されていてもよい。
 需要家設備1-1は、需要家制御装置10、負荷装置11、発電装置12、及び蓄電装置13を備える。需要家設備1-1は、これらの構成要素を備える1つの住宅、店舗、又は工場などである。
 負荷装置11は、さまざまな電気機器を含み、これらの電気機器によって消費される需要電力を有する。
 発電装置12は、例えば太陽電池などの再生可能エネルギーなどにより、発電電力を発生する。
 蓄電装置13は、発電装置12によって発生された発電電力、又は、電力会社設備3から供給された商用電力を蓄電する。
 需要家制御装置10は、負荷装置11の需要電力、発電装置12の発電電力、及び蓄電装置13の蓄電量をモニタリングし、その結果を電力制御装置4に通知する。需要家制御装置10は、例えば、分電盤などに一体化されてもよく、分電盤などに電気的に接続されていてもよい。
 他の需要家設備1-2~1-4もまた、需要家設備1-1と同様に構成される。本明細書では、需要家設備1-1~1-4を総称して「需要家設備1」とも表記する。
 各需要家設備1は互いに電力を送受電する。複数組の需要家設備1のうちの各組の需要家設備1の間で、共通の電力線を介して同時に送電するために、各需要家設備1は、互いに直交する変調符号で電力を符号変調して送電してもよい。
 電力制御装置4は、需要家設備1-1~1-4の間の送受電を制御する
 図2は、図1の電力制御装置4の構成を示すブロック図である。電力制御装置4は、予測回路21、過不足電力量計算回路22、グループ化回路23、送受電制御回路24、及び再構成判定回路25を備える。
 予測回路21は、各需要家設備1から、現在の需要電力、現在の発電電力、及び現在の蓄電量についての情報を受信する。予測回路21は、さらに、サードパーティのサーバ装置などから、気象情報などの追加の情報を受信する。予測回路21は、需要家設備1-1から受信した情報に基づいて、現在時刻から予め決められた長さの未来の時刻までの時間期間(本明細書では、「単位時間期間」という)における需要家設備1-1の負荷装置11の需要電力を予測する。単位時間期間の長さは、例えば、数時間、24時間、数日などであってもよい。予測回路21は、需要家設備1-1の需要電力を予測するために、需要家設備1-1から、その電力使用の履歴などを受信してもよい。予測回路21はまた、需要家設備1-1から受信した情報に基づいて、また、気象情報に基づいて、単位時間期間における需要家設備1-1の発電装置12の発電電力を予測する。予測回路21はまた、需要家設備1-1から受信した情報に基づいて、単位時間期間における需要家設備1-1の蓄電装置13の蓄電量であって、他の需要家設備1-2~1-4に対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測する。同様に、予測回路21は、需要家設備1-2~1-4から受信した情報に基づいて、需要家設備1-2~1-4の需要電力、発電電力、及び固有蓄電量をそれぞれ予測する。
 過不足電力量計算回路22は、各需要家設備1について、予測された需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が第1のしきい値に達しているときに発電装置12によって発電されて負荷装置11によって消費されない余剰電力量を計算する。過不足電力量計算回路22はまた、各需要家設備1について、予測された需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が第1のしきい値より小さい第2のしきい値に達しているときに他の需要家設備1から供給を受ける必要がある不足電力量を計算する。第1及び第2のしきい値は、蓄電装置13に過大な負荷をかけることなく、あまり劣化を生じることがないように長期間にわたって蓄電装置13を動作させることができる蓄電量の上限値及び下限値である。第2のしきい値は、停電が発生したとき、又は電力会社設備3から遮断されたとき、などの非常時において、蓄電装置13を備える需要家設備1に対して、又は、電力システム内の全需要家設備1に対して、1~2日にわたって電力を供給できる蓄電量に設定されてもよい。第1及び第2のしきい値は、蓄電装置13ごとに異なっていてもよい。商用電力についてピークカット目標電力が設定されている場合には、需要電力のうちでピークカット目標電力以下の分は商用電力から取得するように、余剰電力量及び不足電力量を計算してもよい。本明細書では、第1のしきい値を「上限蓄電量」ともいい、第2のしきい値を「下限蓄電量」ともいう。
 グループ化回路23は、各需要家設備1の予測された需要電力、発電電力、及び固有蓄電量と、各需要家設備1の計算された余剰電力量及び不足電力量とに基づいて、需要家設備1のグループを形成する。グループ化回路23は、単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備1と、単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備1とを組み合わせることにより、第1及び第2の需要家設備1を含む少なくとも1つのグループを形成する。
 送受電制御回路24は、各需要家設備1の予測された需要電力、発電電力、及び固有蓄電量と、各需要家設備1の計算された余剰電力量及び不足電力量と、需要家設備1のグループとに基づいて、複数の需要家設備1の間の送受電を決定して指示する。送受電制御回路24は、第1及び第2の需要家設備1を含む各グループにおいて、第1及び第2の需要家設備1の蓄電装置13の蓄電量が単位時間期間にわたって第1のしきい値以下かつ第2のしきい値以上になるように、第1の需要家設備1から第2の需要家設備1への送電電力を決定する。送受電制御回路24は、決定された送電電力を送受電するように、第1及び第2の需要家設備1にそれぞれ指示する。
 再構成判定回路25は、複数の需要家設備1の間の送受電を再構成するトリガを検出したとき、予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示する。予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24は、再構成の指示を受けたとき、需要電力、発電電力、及び固有蓄電量の予測と、余剰電力量及び不足電力量の計算と、少なくとも1つのグループの形成と、送電電力の決定とをそれぞれ繰り返す。再構成のトリガとして、例えば、以下のようなものがある。
 再構成判定回路25は、単位時間期間ごとに、予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示してもよい。
 再構成判定回路25は、予測回路21によって新たに予測された需要電力、発電電力、及び固有蓄電量のうちの少なくとも1つが、予測回路21によって以前に予測された需要電力、発電電力、及び固有蓄電量とは異なるとき、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示してもよい。
 再構成判定回路25は、実際の需要電力及び発電電力の少なくとも一方が、予測回路21によって以前に予測された需要電力及び発電電力とは異なるとき、予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示してもよい。
 再構成判定回路25は、需要家設備1又は電力網2の故障又は停電などを検出したとき、予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示してもよい。
 各需要家設備1の需要家制御装置10は、他の需要家設備1に送電するように電力制御装置4から指示されたとき、他の需要家設備1に送電するための予め決められた条件を満たしているか否かを判断し、条件を満たしているときのみ他の需要家設備1に送電してもよい。条件を満たしていないとき、需要家制御装置10は、送電を拒否することを電力制御装置4に通知する。
 例えば、需要家が電力会社とデマンドレスポンスの契約を結んでいる場合、電力会社は、卸電力価格が高騰したとき、電力需給が逼迫したとき、又は電力系統の信頼性が低下したときに、電気料金の設定またはインセンティブの支払いに応じて、電力消費の抑制又は遮断を実施するか、需要家に要請する。従って、この場合、需要家設備1は、商用電力の消費電力量を削減するために、発電電力の一部及び/又は蓄電量の一部を確保しておかなればならない。需要家制御装置10は、電力会社との契約により確保しておかなければならない発電電力及び/又は蓄電量を超えて、他の需要家設備1に送電するように電力制御装置4から指示されたとき、送電を拒否する。
 また、複数の需要家設備1の間の送受電に売買価格が設定されている場合、需要家制御装置10は、売電総額又は買電総額が予め決められたしきい値を超えるとき、送電又は受電を拒否してもよい。
 また、需要家制御装置10は、ユーザの指示に応じて、他の需要家設備1に対する送電又は受電を拒否してもよい。
 再構成判定回路25は、需要家設備1から送電の拒否の通知を受けたときもまた、予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示してもよい。
 本明細書において、予測回路21、過不足電力量計算回路22、グループ化回路23、送受電制御回路24、及び再構成判定回路25をそれぞれ、「予測器」、「過不足電力量計算器」、「グループ形成器」、「送受電制御器」、及び「再構成判定器」ともいう。電力制御装置4は、ハードウェアの回路21~25によって実装されてもよく、プロセッサによって実行されたときに回路21~25と同様の機能を提供するプログラムとして実装されてもよい。
 次に、図3A~図6Bを参照して、図1の需要家設備1-1~1-4の間における送受電について説明する。
 図3Aは、単位時間期間において不足電力量を有する需要家設備1の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。図3Bは、単位時間期間において余剰電力量を有する需要家設備1の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。図3Aほかの例では、単位時間期間は24時間である。商用電力にはピークカット目標電力が設定されている。図3Aによれば、正午前後に発電電力のピークが発生している。発電電力が得られない午前の時間帯において、需要電力のピークが発生している。需要電力のうちで、ピークカット目標電力以下の分は商用電力から取得され、ピークカット目標電力を超える分は蓄電装置13から取得される。蓄電量が下限蓄電量に達して蓄電装置13が放電できない時間期間では、需要電力のうちでピークカット目標電力を超える分は、不足電力量になる。また、図3Bによれば、この場合も、正午前後に発電電力のピークが発生している。発電電力のうちで、需要電力以下の分は負荷装置11に供給され、需要電力を超える分は蓄電装置13に充電される。蓄電量が上限蓄電量に達して蓄電装置13が充電できない時間期間では、発電電力のうちで需要電力を超える分は、余剰電力量になる。
 図3Aの需要家設備1では、不足電力量に相当する電力を他の需要家設備1から受電する必要がある。一方、図3Bの需要家設備1では、発電電力を無駄にしないために、余剰電力量に相当する電力を他の需要家設備1に送電することが望ましい。従って、電力制御装置4は、図3Aの需要家設備1及び図3Bの需要家設備1を組み合わせることにより、需要家設備1のグループを形成する。
 図4は、図3Aの需要家設備1及び図3Bの需要家設備1の合計の需要電力、発電電力、及び固有蓄電量の時間変化を示す図である。図4によれば、図3Aの需要家設備1及び図3Bの需要家設備1の合計の固有蓄電量は、合計の上限蓄電量及び合計の下限蓄電量のいずれにも達していないことがわかる。従って、図3Aの需要家設備1及び図3Bの需要家設備1の各蓄電装置13の蓄電量を予め平均化することにより、蓄電量の変動を抑制することができる。
 図5Aは、図3Aの需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。図5Bは、図3Bの需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。図5A及び図5Bによれば、図3Aの需要家設備1及び図3Bの需要家設備1の各蓄電装置13の蓄電量は、これらの需要家設備1の間で送受電することにより、予め平均化されている。図5A及び図5Bの両方において、需要電力に応じて放電しても蓄電量は下限蓄電量に達することなく、発電電力に応じて充電しても蓄電量は上限蓄電量に達することもない。
 図6Aは、単位時間期間において余剰電力量を有する需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。図6Bは、単位時間期間において不足電力量を有する需要家設備1の需要電力、発電電力、及びグループ内で送受電したときの蓄電量の時間変化を示す図である。図6A及び図6Bは、需要電力の時間変化が図3A及び図3Bのものとは異なる場合の例を示す。図6Aの場合、単位時間期間にわたって図3A及び図3Bの場合よりも需要電力が小さいので、固有蓄電量が上限蓄電量に達して蓄電装置13が充電できない時間期間はより長くなり、余剰電力量もより大きくなる。図6Bの場合、単位時間期間にわたって平均的に図3A及び図3Bの場合よりも需要電力が大きいので、固有蓄電量が下限蓄電量に達して蓄電装置13が放電できない時間期間はより長くなり、不足電力量もより大きくなる。図6A及び図6Bによれば、図6Aの需要家設備1及び図6Bの需要家設備1の各蓄電装置13の蓄電量は、これらの需要家設備1の間で送受電することにより、予め平均化されている。図6A及び図6Bの両方において、需要電力に応じて放電しても蓄電量は下限蓄電量に達することなく、発電電力に応じて充電しても蓄電量は上限蓄電量に達することもない。
 次に、図7~図9を参照して、図1の電力制御装置4によって実行される電力制御処理について説明する。
 図7は、図1の電力制御装置4によって実行される電力制御処理を示すフローチャートである。ステップS1において、電力制御装置4の予測回路21は、各需要家設備1の現在の需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間における各需要家設備1の需要電力、発電電力、及び固有蓄電量を予測する。ステップS2において、電力制御装置4の過不足電力量計算回路22は、予測された需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間における各需要家設備1の余剰電力量及び不足電力量を計算する。ステップS3において、電力制御装置4のグループ化回路23は、グループ化処理を実行する。
 図8は、図7のステップS3のグループ化処理を示すサブルーチンである。ステップS11において、グループ化回路23は、単位時間期間における余剰電力量及び不足電力量の有無に応じて需要家設備1をクラスタリング(分類)する。需要家設備1は、以下のカテゴリーA~Dに分類される。
A:単位時間期間において、固有蓄電量が上限蓄電量に達して余剰電力量を有するが、下限蓄電量には達しない(不足電力量なし)需要家設備1
B:単位時間期間において、固有蓄電量が下限蓄電量に達して不足電力量を有するが、上限蓄電量には達しない(余剰電力量なし)需要家設備1
C:単位時間期間において、固有蓄電量が上限蓄電量及び下限蓄電量の両方に達し、余剰電力量及び不足電力量の両方を有する需要家設備1
D:単位時間期間において、固有蓄電量が上限蓄電量及び下限蓄電量のどちらに達することもなく、余剰電力量及び不足電力量の両方をもたない需要家設備1
 本明細書では、カテゴリーA~Dの需要家設備1を「第1~第4の需要家設備」ともいう。
 ステップS12において、グループ化回路23は、余剰電力量及び不足電力量の大きさに応じて需要家設備1をクラスタリングする。
 ステップS13において、グループ化回路23は、余剰電力量及び不足電力量を実質的に相殺するように2つ以上の需要家設備を組み合わせることによりグループを形成する。グループ化回路23は、少なくとも1つのカテゴリーAの需要家設備1と、少なくとも1つのカテゴリーBの需要家設備1とを組み合わせることにより、カテゴリーA及びBの需要家設備1を含む少なくとも1つのグループを形成してもよい。この場合、グループ化回路23は、単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーBの需要家設備1を組み合わせてもよい。また、グループ化回路23は、少なくとも1つのカテゴリーAの需要家設備1と、少なくとも1つのカテゴリーBの需要家設備1と、少なくとも1つのカテゴリーCの需要家設備1とを組み合わせることにより、カテゴリーA~Cの需要家設備1を含む少なくとも1つのグループを形成してもよい。この場合、グループ化回路23は、単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせ、単位時間期間において互いに最も近接した不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーBの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせてもよい。
 図9は、図8のグループ化処理を実行することによって形成された例示的なグループを示す表である。図9の例では、電力システムは、カテゴリーAの需要家設備1(A-1、A-2、A-3)、カテゴリーBの需要家設備1(B-1、B-2、B-3)、カテゴリーCの需要家設備1(C-1)、及びカテゴリーDの需要家設備1(D-1)を含むものとする。余剰電力量及び不足電力量を実質的に相殺するように、需要家設備A-1、B-1を組み合わせ、需要家設備A-2、B-2を組み合わせ、需要家設備C-1、A-3、B-3を組み合わせることにより、それぞれグループを形成する。カテゴリーDの需要家設備D-1は、余剰電力量及び不足電力量を有しないので、他の需要家設備1とグループ化する必要はない。
 需要家設備A-1、B-1のグループにおいて、余剰電力量及び不足電力量は完全に一致していなくてもよい。例えば、需要家設備A-1の不足電力量が需要家設備B-1の余剰電力量よりもわずかに大きい場合、不足電力量を満たすように需要家設備B-1が需要家設備A-1へ余剰電力量よりも余分に送電しても、需要家設備B-1の蓄電装置13の蓄電量は下限蓄電量よりも十分に大きいと考えられる。同様に、需要家設備B-1の余剰電力量が需要家設備A-1の不足電力量よりもわずかに大きい場合、余剰電力量をすべて消費するように需要家設備B-1が需要家設備A-1へ不足電力量よりも余分に送電しても、需要家設備A-1の蓄電装置13の蓄電量は上限蓄電量よりも十分に小さいと考えられる。他のグループにおいても同様に、余剰電力量及び不足電力量は完全に一致していなくてもよい。
 図9に示すように、1つのグループにおいて、あるカテゴリーの需要家設備1を1つずつ含むのではなく、同じカテゴリーの複数の需要家設備1を含むように、需要家設備1を組み合わせてもよい。例えば、カテゴリーCの2つの需要家設備1と、カテゴリーAの1つの需要家設備1と、カテゴリーBの2つの需要家設備1とを組み合わせることにより、1つのグループを形成してもよい。
 需要家設備1のグループを形成するとき、余剰電力量及び不足電力量の有無及び大きさに加えて、余剰電力量及び不足電力量が発生する時刻又は時間帯、需要家設備1の間の距離、などを考慮してもよい。互いに離れた時間帯において余剰電力量及び不足電力量を有する需要家設備1の間で送受電する場合よりも、より近い時間帯において余剰電力量及び不足電力量を有する需要家設備1の間で送受電する場合のほうが、余剰電力量及び不足電力量の解消に成功する可能性が高い。余剰電力量が発生する時間と不足電力量が発生する時間とが離れていると、後述のステップS7で説明するように、需要電力及び発電電力などの条件が変化することにより、余剰電力量及び不足電力量の解消に失敗する可能性がある。また、送受電する需要家設備1の間の距離が近いほど、送受電による損失が小さくなる。従って、以下のように、送受電による損失を低減するように需要家設備1のグループを形成してもよい。
 図10は、図7のステップS3のグループ化処理の変形例を示すサブルーチンである。ステップS21において、グループ化回路23は、図8のステップS11と同様に、余剰電力量及び不足電力量の有無に応じて需要家設備1をクラスタリングする。
 ステップS22において、グループ化回路23は、余剰電力量及び不足電力量の大きさ、発生時刻、及び場所に応じて需要家設備1をクラスタリングする。
 ステップS23において、グループ化回路23は、余剰電力量及び不足電力量を実質的に相殺するように2つ以上の需要家設備を組み合わせることによりグループを形成する。
 グループ化回路23は、単位時間期間において所定のしきい値(本明細書では、「第3のしきい値」ともいう)よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーBの需要家設備1の複数の組み合わせが利用可能であるとき、以下のように、カテゴリーA及びBの需要家設備1を含む少なくとも1つのグループを形成してもよい。グループ化回路23は、利用可能な各組み合わせのカテゴリーA及びBの需要家設備1のうち、単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーBの需要家設備1を組み合わせてもよい。また、グループ化回路23は、利用可能な各組み合わせのカテゴリーA及びBの需要家設備1のうち、互いに最も近接した場所に設けられた少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーBの需要家設備1を組み合わせてもよい。
 グループ化回路23は、単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1の複数の組み合わせが利用可能であり、かつ、単位時間期間において第3のしきい値よりも互いに近接する不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つのカテゴリーBの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1の複数の組み合わせが利用可能であるとき、以下のように、カテゴリーA~Cの需要家設備1を含む少なくとも1つのグループを形成してもよい。グループ化回路23は、利用可能な各組み合わせのカテゴリーA及びCの需要家設備1のうち、単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせてもよい。また、グループ化回路23は、利用可能な各組み合わせのカテゴリーB及びCの需要家設備1のうち、単位時間期間のうちの互いに最も近接した部分時間期間において不足電力量及び余剰電力量をそれぞれ有する少なくとも1つのカテゴリーBの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせてもよい。また、グループ化回路23は、利用可能な各組み合わせのカテゴリーA及びCの需要家設備1のうち、互いに最も近接した場所に設けられた少なくとも1つのカテゴリーAの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせてもよい。また、グループ化回路23は、利用可能な各組み合わせのカテゴリーB及びCの需要家設備1のうち、互いに最も近接した場所に設けられた少なくとも1つのカテゴリーBの需要家設備1及び少なくとも1つのカテゴリーCの需要家設備1を組み合わせてもよい。
 グループ化回路23は、需要家設備1のグループを形成するとき、余剰電力量及び不足電力量の発生時刻と、需要家設備1の場所との両方を考慮してもよい。
 図11は、図10のグループ化処理を実行することによって形成された例示的なグループを示す表である。図11の例では、電力システムは、カテゴリーAの需要家設備1(A-1、A-2、A-3)、カテゴリーBの需要家設備1(B-1、B-2、B-3)を含むものとする。同じ時刻又は互いに近接した時刻に発生した余剰電力量及び不足電力量を実質的に相殺するように、同じ場所又は互いに近接した場所に設けられた需要家設備A-1、B-1を組み合わせ、同じ場所又は互いに近接した場所に設けられた需要家設備A-2、B-2を組み合わせ、同じ場所又は互いに近接した場所に設けられた需要家設備A-3、B-3を組み合わせることにより、それぞれグループを形成する。
 需要家設備1のグループを形成するとき、さらに、過去のグループ化の結果、需要家設備1の間の送受電の成功率、などを考慮してもよい。
 再び図7を参照すると、ステップS4において、電力制御装置4の送受電制御回路24は、各需要家設備1の予測された需要電力、発電電力、及び固有蓄電量と、各需要家設備1の計算された余剰電力量及び不足電力量と、需要家設備1のグループとに基づいて、各グループにおいて、需要家設備1の需要電力の合計値、発電電力の合計値、及び蓄電量の合計値を計算する。
 ステップS5において、送受電制御回路24は、各グループにおいて、各需要家設備1の送電電力及び受電電力を決定する。ここで、送受電制御回路24は、各需要家設備1において、余剰電力量及び不足電力量が発生しないように、蓄電量が上限蓄電量及び下限蓄電量に達することがないように、かつ、蓄電量の変動を最小化するように、送電電力及び受電電力を決定する。送受電制御回路24は、カテゴリーA及びBの需要家設備1を含む各グループにおいて、需要家設備1の蓄電装置13の蓄電量が単位時間期間にわたって上限蓄電量以下かつ下限蓄電量以上になるように、カテゴリーAの需要家設備1からカテゴリーBの需要家設備1への送電電力を決定する。送受電制御回路24は、カテゴリーA~Cの需要家設備1を含む各グループにおいて、各需要家設備1の蓄電装置13の蓄電量が単位時間期間にわたって上限蓄電量以下かつ下限蓄電量以上になるように、カテゴリーAの需要家設備1からカテゴリーCの需要家設備1への送電電力と、カテゴリーCの需要家設備1からカテゴリーBの需要家設備1への送電電力とを決定する。送受電制御回路24は、カテゴリーDの需要家設備1には、他の需要家設備1との間で電力を送受信させない。
 ステップS6において、送受電制御回路24は、各需要家設備1に送電及び受電を指示する。
 ステップS7において、電力制御装置4の再構成判定回路25は、複数の需要家設備1の間の送受電を再構成するトリガを検出したか否かを判断し、YESのときはステップS1に戻り、NOのときはステップS7を繰り返す。
 ステップS3で決定された各グループの需要家設備1の間で、ステップS5で決定された電力を送受電しているとき、需要電力及び発電電力などの条件が変化すると、固有蓄電量、余剰電力量、及び不足電力量なども変化する。これにより、新たな余剰電力量又は新たな不足電力量が発生し、固定されたグループ、送電電力、及び受電電力のままでは、送受電できなくなる可能性がある。従って、再構成判定回路25は、以下のトリガを検出したとき、需要家設備1の間の送受電を再構成する。
 例えば、第1のトリガとして、単位時間期間ごとに、送受電を再構成してもよい。これにより、曜日ごとの需要電力の変化、平日又は休日による需要電力の変化に追従することができる。
 例えば、第2のトリガとして、予測回路21によって新たに予測された需要電力、発電電力、及び固有蓄電量のうちの少なくとも1つが、予測回路21によって以前に予測された需要電力、発電電力、及び固有蓄電量とは異なるとき、送受電を再構成してもよい。
 例えば、第3のトリガとして、実際の需要電力及び発電電力の少なくとも一方が、予測回路21によって以前に予測された需要電力及び発電電力とは異なるとき、送受電を再構成してもよい。これにより、予想外の天変地異、事故などに起因する送受電の中断に対処することができる。
 例えば、第4のトリガとして、需要家設備1又は電力網2の故障又は停電などを検出したとき、送受電を再構成してもよい。これにより、需要家設備1(負荷装置11、発電装置12、蓄電装置13)及び電力網2の故障などに起因する送受電の中断に対処することができる。
 例えば、第5のトリガとして、未知の原因により、電力制御装置4から需要家設備1に指示した送受電が行われなかったとき、送受電を再構成してもよい。送受電を妨げる原因が不明であり、以後も送受電を実施可能になるか不明である場合にも対処することができる。
 第3~第5のトリガは送受電が中断されたとき事後的に検出されるのに対して、第1及び第2のトリガは事前に検出可能である。実際の需要電力及び発電電力が予測された需要電力及び発電電力から許容誤差を超えて相違すると、ある程度の期間にわたって送受電を実施できなくなる可能性あるが、第1又は第2のトリガを用いて、そのような送受電の中断を回避することができる。
 再構成判定回路25は、複数の需要家設備1の間の送受電を再構成するトリガを検出したとき、前述のように、再構成判定回路25から予測回路21、過不足電力量計算回路22、グループ化回路23、及び送受電制御回路24に再構成を指示する。
 図12A~図13Bを参照して、複数の需要家設備1の間の送受電を再構成することが必要になる場合の例について説明する。
 図12Aは、ある需要家設備1についてユーザの帰宅時間に基づいて予測された、需要電力、発電電力、固有蓄電量、及びグループ内で送受電したときの予定蓄電量の時間変化を示す図である。図12Bは、図12Aと同じ需要家設備1の実際の需要電力、発電電力、及び蓄電量の時間変化を示す図である。図12Aによれば、ユーザが帰宅して需要電力が増大する前に、固有蓄電量が上限蓄電量に達し、余剰電力量が発生すると予測されている。電力制御装置4は、他の需要家設備1に送電するように指示する。しかしながら、図12Bによれば、ユーザの帰宅が早くなったことにより余剰電力量が発生しなくなったので、他の需要家設備1への送電も不要になる。このため、電力制御装置4は、ユーザの帰宅を検知したとき、他の需要家設備1に送電しないように送受電を再構成する。
 図13Aは、ある需要家設備1について天気に基づいて予測された、需要電力、発電電力、固有蓄電量、及びグループ内で送受電したときの予定蓄電量の時間変化を示す図である。図13Bは、図13Aと同じ需要家設備1の実際の需要電力、発電電力、及び蓄電量の時間変化を示す図である。図13Aによれば、気象情報に基づいて、太陽電池である発電装置12の発電電力が予測されている。一方、図13Bによれば、雨雲の発生により発電電力が低下している。このため、電力制御装置4は、天候の変化を検出したとき、送受電を再構成する。
 実施形態1に係る電力システムによれば、小容量の蓄電装置13を使用しながら、無駄なく安定的に負荷装置11に電力を供給するように、かつ、蓄電装置13の劣化を生じにくいように、複数の需要家設備1の間の送受電を低い計算負荷で制御することができる。
 実施形態1に係る電力システムによれば、蓄電装置13をそれぞれ備える複数の需要家設備1の少なくとも1つのグループを形成し、各グループの需要家設備1の間で送受電する。従って、小容量の蓄電装置13を使用しながら、無駄なく安定的に、各需要家設備1の負荷装置11に電力を供給することができる。
 実施形態1に係る電力システムによれば、各需要家設備1において、蓄電装置13の上限蓄電量に達したときの余剰電力量を他の需要家設備1に送電し、蓄電装置13の下限蓄電量に達したときの不足電力量を他の需要家設備1から受電する。従って、各需要家設備1の蓄電装置13の蓄電量を上限蓄電量以下かつ下限蓄電量以上にすることができるので、蓄電装置13の劣化を生じにくくすることができる。また、送受電する電力量も最小化されるので、送受電による損失を低減することができる。
 実施形態1に係る電力システムによれば、単位時間期間における需要電力、発電電力、及び固有蓄電量を予測し、単位時間期間において余剰電力量を有する需要家設備1と、単位時間期間において不足電力量を有する需要家設備1とを組み合わせてグループを形成する。これにより、単位時間期間のうちの未来の需要電力、発電電力、及び固有蓄電量を考慮して、各需要家設備1の送電電力及び受電電力を決定することができる。従って、例えば、単位時間期間のうちの未来に大きな需要電力量が発生すると予測される需要家設備1では、他の需要家設備1への送電を抑制し、蓄電量を維持することができる。仮に、蓄電量の現在の瞬時値のみに基づいて他の需要家設備1に送電するか否かを決定する場合には、未来に大きな需要電力量が発生するにもかかわらず他の需要家設備1に送電して蓄電量を低下させてしまい、その後、実際に大きな需要電力量が発生したときに蓄電量が不足し、他の需要家設備1から受電しなければならなくなる。実施形態1に係る電力システムによれば、単位時間期間の全体の需要電力、発電電力、及び固有蓄電量を考慮することにより、需要家設備1の間の無駄な送受電を防止することができる。
 実施形態1に係る電力システムによれば、需要家設備1のグループを形成するとき、余剰電力量及び不足電力量の有無及び大きさに応じて需要家設備1をクラスタリングすることにより、計算負荷を低減することができる。例えば、クラスタリングを行わない場合、需要家設備1のすべての組み合わせについて送受電を行うか否かを判断しなければならず、計算負荷が非常に高く、制御のリアルタイム性が保証されない。一方、図8~図11に示すようにクラスタリングを行う場合、単位時間期間において互いに近接した余剰電力量及び不足電力量を有する需要家設備1の組み合わせについてのみ送受電を行うか否かを判断すればよく、計算負荷を低減することができる。余剰電力量及び不足電力量を有しない需要家設備1については、送受電を行うか否かを判断する必要がなく、計算負荷をさらに低減することができる。
 実施形態1に係る電力システムによれば、各グループにおいて、需要電力と供給電力とをバランス化させることができる。需要電力と供給電力とをバランス化させるように需要家設備1のグループを形成することにより、蓄電量の変動を最小化することができると考えられる。
 実施形態1に係る電力システムによれば、各需要家設備1の蓄電装置13の容量を最小化しながら、需要家設備1自体において、又は、同じグループに含まれる他の需要家設備1において、発電電力を無駄なく自己消費する(すなわち、売電量を減らす)ことができる。
 実施形態1に係る電力システムによれば、複数の需要家設備1の間の送受電を再構成する回数がなるべく少なくなるように(例えば、単位時間期間より短い時間で送受電を再構成する必要がないように)、需要家設備1のグループを形成してもよい。
実施形態2.
 電力制御装置4は、商用電力を利用可能である通常時と、停電などにより商用電力を利用可能でない非常時とで、各需要家設備1の蓄電装置13の上限蓄電量及び下限蓄電量の少なくとも一方を変化させてもよい。これにより、非常時において、蓄電装置13により充放電される電力量を増大することができる。
 実施形態2に係る電力システムは、実施形態1に係る電力システムと同様に構成される。
 図14は、実施形態2に係る電力システムの電力制御装置4によって実行される電力制御処理を示すフローチャートである。
 ステップS31において、電力制御装置4は、非常時の上限蓄電量及び下限蓄電量を計算する。非常時の上限蓄電量及び下限蓄電量は、短時間であれば、蓄電装置13に過大な負荷をかけることなく、あまり劣化を生じることがないように蓄電装置13を動作させることができる蓄電量の上限値及び下限値である。例えば、非常時の上限蓄電量は、通常時の上限蓄電量よりも高く設定されてもよく、非常時の下限蓄電量は、通常時の下限蓄電量よりも低く設定されてもよい。
 ステップS32において、電力制御装置4は、商用電力が利用可能であるか否かを判断し、YESのときはステップS35に進み、NOのときはステップS33に進む。
 ステップS33において、電力制御装置4は、過不足電力量計算回路22において、余剰電力量及び不足電力量を計算するときに使用される商用電力の値をゼロに設定する。ステップS34において、電力制御装置4は、過不足電力量計算回路22において、非常時の上限蓄電量及び下限蓄電量を設定する。
 ステップS35において、電力制御装置4は、過不足電力量計算回路22において、余剰電力量及び不足電力量を計算するときに使用される商用電力のピークカット目標電力を設定する。ステップS36において、電力制御装置4は、過不足電力量計算回路22において、通常時の上限蓄電量及び下限蓄電量を設定する。
 ステップS37~ステップS42は、図7のステップS1~S6と同様である。ただし、商用電力が利用可能でないとき、ステップS39のグループ化処理において、カテゴリーA~Cの需要家設備1とともにカテゴリーDの需要家設備1も組み合わせるようにグループを形成してもよい。カテゴリーDの需要家設備1に対して送受電することにより、非常時においてカテゴリーDの需要家設備1の蓄電装置13を有効に活用することができる。
 ステップS42の後で、図7のステップS7と同様に、複数の需要家設備1の間の送受電を再構成するトリガを検出したか否かを判断してもよい。
 実施形態2に係る電力システムによれば、商用電力が利用可能であるか否かに応じて、上限蓄電量及び下限蓄電量の少なくとも一方を変化させることにより、非常時において各需要家設備1の蓄電装置13を有効に活用することができる。非常時の上限蓄電量及び下限蓄電量を用いることにより、非常時のための蓄電量のバッファを確保することができる。
実施形態3.
 電力システムの各需要家設備は、図1に示すように負荷装置11、発電装置12、及び蓄電装置13のすべてを備えたものに限定されない。電力システムは、発電装置12を備えていない需要家設備を含んでいてもよく、蓄電装置13を備えていない需要家設備を含んでいてもよい。
 図15は、実施形態3に係る電力システムに含まれる需要家設備1Aの構成を示すブロック図である。需要家設備1A需要家制御装置10A、負荷装置11、及び蓄電装置13を備える。需要家制御装置10Aは、発電装置の発電電力をモニタリングしないことを除いて、図1の需要家制御装置10と同様に構成される。
 図16は、実施形態3に係る電力システムに含まれる需要家設備1Bの構成を示すブロック図である。需要家設備1Bは、需要家制御装置10B、負荷装置11、及び発電装置12を備える。需要家制御装置10Bは、蓄電装置の蓄電量をモニタリングしないことを除いて、図1の需要家制御装置10と同様に構成される。
 図17は、実施形態3に係る電力システムに含まれる需要家設備1Cの構成を示すブロック図である。需要家設備1Cは、需要家制御装置10C及び負荷装置11を備える。需要家制御装置10Cは、発電装置12の発電電力及び蓄電装置の蓄電量をモニタリングしないことを除いて、図1の需要家制御装置10と同様に構成される。
 実施形態3に係る電力システムにおいて、すべての需要家設備(需要家設備1、1A~1C)は負荷装置11をそれぞれ備える。実施形態3に係る電力システムにおいて、需要家設備のうちの少なくとも1つ(需要家設備1、1B)は発電装置12をさらに備える。実施形態3に係る電力システムにおいて、需要家設備のうちの少なくとも2つ(需要家設備1、1A)は蓄電装置13をさらに備える。以下の説明では、実施形態3に係る電力システムは、図1の需要家設備1、図15の需要家設備1A、図16の需要家設備1B、及び図17の需要家設備1Cのすべてを備えているものとする。
 実施形態3に係る電力制御装置4は、実施形態1に係る電力制御装置4と同様に構成され、例えば図2に示すように、予測回路21、過不足電力量計算回路22、グループ化回路23、送受電制御回路24、及び再構成判定回路25を備える。
 予測回路21は、発電装置12を備える各需要家設備1、1Bについて、単位時間期間における各需要家設備1、1Bの発電装置12の発電電力を予測する。予測回路21は、蓄電装置13を備える各需要家設備1、1Aについて、単位時間期間における各需要家設備1、1Aの蓄電装置13の蓄電量であって、他の需要家設備1、1A~1Cに対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測する。
 過不足電力量計算回路22は、発電装置12及び蓄電装置13を備える各需要家設備1について、需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が上限蓄電量に達しているときに発電装置12によって発電されて負荷装置11によって消費されない余剰電力量を計算する。過不足電力量計算回路22は、蓄電装置13を備える各需要家設備1、1Aについて、需要電力及び固有蓄電量に基づいて、又は、需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が下限蓄電量に達しているときに他の需要家設備1、1A~1Cから供給を受ける必要がある不足電力量を計算する。過不足電力量計算回路22は、発電装置12を備え、かつ、蓄電装置13を備えていない各需要家設備1Bについて、需要電力及び発電電力に基づいて、単位時間期間において発電装置12によって発電されて負荷装置11によって消費されない余剰電力量を計算し、単位時間期間において他の需要家設備1、1A~1Cから供給を受ける必要がある不足電力量を計算する。過不足電力量計算回路22は、発電装置12及び蓄電装置13を備えていない各需要家設備1Cについて、需要電力に基づいて、単位時間期間において他の需要家設備1、1A~1Cから供給を受ける必要がある不足電力量を計算する。
 図1の需要家設備1及び図16の需要家設備1Bでは、余剰電力量及び不足電力量の両方が発生する可能性がある。一方、図15の需要家設備1A及び図17の需要家設備1Cでは、不足電力量が発生する可能性はあるが、発電装置を備えていないので余剰電力量が発生することはない。
 グループ化回路23は、複数の需要家設備1、1A~1Cのうち、蓄電装置13を備える少なくとも1つの需要家設備1、1Aを含むように、単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備1、1Bと、単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備1、1A~1Cとを組み合わせることにより、第1及び第2の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成する。電力制御装置4は、複数の需要家設備1、1A~1Cのうち、蓄電装置13を備える少なくとも1つの需要家設備1、1Aを含むように、単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備1、1Bと、単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備1、1A~1Cと、単位時間期間において余剰電力量及び不足電力量の両方を有する少なくとも1つの第3の需要家設備1、1Bとを組み合わせることにより、第1~第3の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成する。
 送受電制御回路24は、第1及び第2の需要家設備1、1A~1Cを含む各グループにおいて、蓄電装置13を備える各需要家設備1の蓄電装置13の蓄電量が単位時間期間にわたって上限蓄電量以下かつ下限蓄電量以上になるように、第1の需要家設備1、1Bから第2の需要家設備1、1A~1Cへの送電電力を決定する。送受電制御回路24は、第1~第3の需要家設備1、1A~1Cを含む各グループにおいて、蓄電装置13を備える各需要家設備1、1Aの蓄電装置13の蓄電量が単位時間期間にわたって上限蓄電量以下かつ下限蓄電量以上になるように、第1の需要家設備1、1Bから第3の需要家設備1、1Bへの送電電力と、第3の需要家設備1、1Bから第2の需要家設備1、1A~1Cへの送電電力とを決定する。
 需要家設備1、1A~1Cのグループは、例えば以下のように形成される。
 グループ化回路23は、複数の需要家設備1、1A~1Cのうち、単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第2の需要家設備1、1A~1Cを組み合わせることにより、第1及び第2の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成してもよい。また、グループ化回路23は、複数の需要家設備1、1A~1Cのうち、単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第3の需要家設備1、1Bを組み合わせ、単位時間期間において互いに最も近接した不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つの第2の需要家設備1、1A~1C及び少なくとも1つの第3の需要家設備1、1Bを組み合わせることにより、第1~第3の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成してもよい。
 グループ化回路23は、単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第2の需要家設備1、1A~1Cの複数の組み合わせが利用可能であるとき、以下のように、第1及び第2の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成してもよい。グループ化回路23は、利用可能な各組み合わせの第1及び第2の需要家設備1、1A~1Cのうち、単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第2の需要家設備1、1A~1Cを組み合わせてもよい。グループ化回路23は、利用可能な各組み合わせの第1及び第2の需要家設備1、1A~1Cのうち、互いに最も近接した場所に設けられた少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第2の需要家設備1、1A~1Cを組み合わせてもよい。
 グループ化回路23は、単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第3の需要家設備1、1Bの複数の組み合わせが利用可能であり、かつ、単位時間期間において第3のしきい値よりも互いに近接する不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つの第2の需要家設備1、1A~1C及び少なくとも1つの第3の需要家設備1、1Bの複数の組み合わせが利用可能であるとき、以下のように、第1~第3の需要家設備1、1A~1Cを含む少なくとも1つのグループを形成してもよい。グループ化回路23は、利用可能な各組み合わせの第1及び第3の需要家設備1、1Bのうち、単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第3の需要家設備1、1Bを組み合わせてもよい。グループ化回路23は、利用可能な各組み合わせの第2及び第3の需要家設備1、1A~1Cのうち、単位時間期間のうちの互いに最も近接した部分時間期間において不足電力量及び余剰電力量をそれぞれ有する少なくとも1つの第2の需要家設備1、1A~1C及び少なくとも1つの第3の需要家設備1、1Bを組み合わせてもよい。グループ化回路23は、利用可能な各組み合わせの第1及び第3の需要家設備1、1Bのうち、互いに最も近接した場所に設けられた少なくとも1つの第1の需要家設備1、1B及び少なくとも1つの第3の需要家設備1、1Bを組み合わせてもよい。グループ化回路23は、利用可能な各組み合わせの第2及び第3の需要家設備1、1A~1Cのうち、互いに最も近接した場所に設けられた少なくとも1つの第2の需要家設備1、1A~1C及び少なくとも1つの第3の需要家設備1、1Bを組み合わせてもよい。
 グループ化回路23は、需要家設備1、1A~1Cのグループを形成するとき、余剰電力量及び不足電力量の発生時刻と、需要家設備1、1A~1Cの場所との両方を考慮してもよい。
 実施形態3に係る電力システムにおいて、需要家設備1Cのみを含むグループは形成されない。これは、図17の需要家設備1Cは余剰電力量を有しないからである。一方、実施形態3に係る電力システムにおいて、図15の需要家設備1Aのみを含むグループは形成されてもよく、図15の需要家設備1A及び図17の需要家設備1Cを含むグループは形成されてもよい。これらのグループでは、商用電力(夜間電力など)により蓄電装置に充電されてもよいが、停電などに起因して商用電力が利用可能でない場合には、これらのグループは形成されない。
 実施形態3に係る電力システムによれば、発電装置及び蓄電装置の少なくとも一方を備えていない需要家設備が存在しても、小容量の蓄電装置13を使用しながら、無駄なく安定的に負荷装置11に電力を供給するように、かつ、蓄電装置13の劣化を生じにくいように、複数の需要家設備1の間の送受電を低い計算負荷で制御することができる。
実施形態4.
 図18は、実施形態4に係る電力システムの構成を示すブロック図である。図18の電力システムは、複数の電力グリッド設備101-1~101-4、電力網2、電力会社設備3、及び電力制御装置4Aを含む。
 電力グリッド設備101-1は、複数の需要家設備1-1~1-4及び電力グリッド制御装置5をそれぞれ含む。電力グリッド設備101-1の需要家設備1-1~1-4は、図1の需要家設備1、図15の需要家設備1A、図16の需要家設備1B、又は図17の需要家設備1Cと同様に構成される。電力グリッド制御装置5は、電力グリッド設備101-1に含まれる各需要家設備1の負荷装置11の需要電力、発電装置12の発電電力、及び蓄電装置13の蓄電量をモニタリングし、その結果を電力制御装置4Aに通知する。
 他の電力グリッド設備101-2~101-4もまた、電力グリッド設備101-1と同様に構成される。本明細書では、電力グリッド設備101-1~101-4を総称して「電力グリッド設備101」とも表記する。
 電力制御装置4Aは、図2の電力制御装置4と実質的に同様に構成され、予測回路、過不足電力量計算回路、グループ化回路、送受電制御回路、及び再構成判定回路を備える。
 電力制御装置4Aの予測回路は、単位時間期間における各電力グリッド設備101の負荷装置11の需要電力を予測する。電力制御装置4Aの予測回路は、発電装置12を備える各電力グリッド設備101について、単位時間期間における各電力グリッド設備101の発電装置12の発電電力を予測する。電力制御装置4Aの予測回路は、蓄電装置13を備える各電力グリッド設備101について、単位時間期間における各電力グリッド設備101の蓄電装置13の蓄電量であって、他の電力グリッド設備101に対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測する。
 電力制御装置4Aの過不足電力量計算回路は、発電装置12及び蓄電装置13を備える各電力グリッド設備101について、需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が第1のしきい値に達しているときに発電装置12によって発電されて負荷装置11によって消費されない余剰電力量を計算する。電力制御装置4Aの過不足電力量計算回路は、蓄電装置13を備える各電力グリッド設備101について、需要電力及び固有蓄電量に基づいて、又は、需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間において固有蓄電量が第1のしきい値より小さい第2のしきい値に達しているときに他の電力グリッド設備101から供給を受ける必要がある不足電力量を計算する。
 電力制御装置4Aのグループ化回路は、蓄電装置13を備える各電力グリッド設備101のうち、単位時間期間において余剰電力量を有する少なくとも1つの第1の電力グリッド設備101と、単位時間期間において不足電力量を有する少なくとも1つの第2の電力グリッド設備101とを組み合わせることにより、第1及び第2の電力グリッド設備101を含む少なくとも1つのグループを形成する。
 電力制御装置4Aの送受電制御回路は、第1及び第2の電力グリッド設備101を含む各グループにおいて、第1及び第2の電力グリッド設備101の蓄電装置13の蓄電量が単位時間期間にわたって第1のしきい値以下かつ第2のしきい値以上になるように、第1の電力グリッド設備101から第2の電力グリッド設備101への送電電力を決定する。
 図19は、図18の電力制御装置4Aによって実行される電力制御処理を示すフローチャートである。
 ステップS51において、電力制御装置4Aの予測回路は、各電力グリッド設備101の現在の需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間における各電力グリッド設備101の需要電力、発電電力、及び固有蓄電量を予測する。
 ステップS52において、電力制御装置4Aの過不足電力量計算回路は、予測された需要電力、発電電力、及び固有蓄電量に基づいて、単位時間期間における各電力グリッド設備101の余剰電力量及び不足電力量を計算する。
 ステップS53において、電力制御装置4Aのグループ化回路は、グループ化処理を実行する。
 ステップS54において、電力制御装置4Aの送受電制御回路は、各電力グリッド設備101の予測された需要電力、発電電力、及び固有蓄電量と、各電力グリッド設備101の計算された余剰電力量及び不足電力量と、電力グリッド設備101のグループとに基づいて、各グループにおいて、電力グリッド設備101の需要電力の合計値、発電電力の合計値、及び蓄電量の合計値を計算する。
 ステップS55において、電力制御装置4Aの送受電制御回路は、各グループにおいて、各電力グリッド設備101の送電電力及び受電電力を決定する。
 ステップS56において、電力制御装置4Aの送受電制御回路は、各電力グリッド設備101に送電及び受電を指示する。
 ステップS57において、電力制御装置4Aの再構成判定回路は、複数の電力グリッド設備101の間の送受電を再構成するトリガを検出したか否かを判断し、YESのときはステップS51に戻り、NOのときはステップS57を繰り返す。
 実施形態4に係る電力システムによれば、小容量の蓄電装置13を使用しながら、無駄なく安定的に負荷装置11に電力を供給するように、かつ、蓄電装置13の劣化を生じにくいように、複数の需要家設備1の間の送受電を低い計算負荷で制御することができる。実施形態4によれば、実施形態1に係る電力システムよりも大規模な電力システムに適用可能であることがわかる。
 各実施形態に係る電力システムは、商用電力に接続されていない電力網及び需要家設備にも適用可能である。
 本開示に係る電力システムは、ある需要家設備で発生した発電電力をその需要家設備又は近隣の需要家設備で消費する「地産地消型電力システム」として実現可能である。小容量の蓄電装置を用いることにより蓄電装置の初期投資費用を低減し、蓄電量の変動を最小化して、あまり劣化を生じることがないように長期間にわたって蓄電装置13を動作させることができる。
1-1~1-4,1A,1B,1C…需要家設備、
2…電力網、
3…電力会社設備、
4,4A…電力制御装置、
5…電力グリッド制御装置、
10,10A,10B,10C…需要家制御装置、
11…負荷装置、
12…発電装置、
13…蓄電装置、
21…予測回路、
22…過不足電力量計算回路、
23…グループ化回路、
24…送受電制御回路、
25…再構成判定回路、
101-1~101-4…電力グリッド設備。

Claims (21)

  1.  電力網を介して互いに接続された複数の需要家設備を含む電力システムのための電力制御装置であって、
     前記複数の需要家設備は負荷装置をそれぞれ備え、前記複数の需要家設備のうちの少なくとも1つは発電装置をさらに備え、前記複数の需要家設備のうちの少なくとも2つは蓄電装置をさらに備え、
     前記電力制御装置は、予測器と、過不足電力量計算器と、グループ形成器と、送受電制御器とを備え、
     前記予測器は、
     単位時間期間における前記各需要家設備の前記負荷装置の需要電力を予測し、
     前記発電装置を備える各需要家設備について、前記単位時間期間における前記各需要家設備の前記発電装置の発電電力を予測し、
     前記蓄電装置を備える各需要家設備について、前記単位時間期間における前記各需要家設備の前記蓄電装置の蓄電量であって、他の需要家設備に対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測し、
     前記過不足電力量計算器は、
     前記発電装置及び前記蓄電装置を備える各需要家設備について、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が第1のしきい値に達しているときに前記発電装置によって発電されて前記負荷装置によって消費されない余剰電力量を計算し、
     前記蓄電装置を備える各需要家設備について、前記需要電力及び前記固有蓄電量に基づいて、又は、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が前記第1のしきい値より小さい第2のしきい値に達しているときに他の需要家設備から供給を受ける必要がある不足電力量を計算し、
     前記グループ形成器は、前記蓄電装置を備える各需要家設備のうち、前記単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備と、前記単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備とを組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成し、
     前記送受電制御器は、前記第1及び第2の需要家設備を含む各グループにおいて、前記第1及び第2の需要家設備の前記蓄電装置の蓄電量が前記単位時間期間にわたって前記第1のしきい値以下かつ前記第2のしきい値以上になるように、前記第1の需要家設備から前記第2の需要家設備への送電電力を決定する、
    電力制御装置。
  2.  前記過不足電力量計算器は、前記発電装置を備え、かつ、前記蓄電装置を備えていない各需要家設備について、前記需要電力及び前記発電電力に基づいて、前記単位時間期間において前記発電装置によって発電されて前記負荷装置によって消費されない余剰電力量を計算し、前記単位時間期間において他の需要家設備から供給を受ける必要がある不足電力量を計算し、
     前記過不足電力量計算器は、前記発電装置及び前記蓄電装置を備えていない各需要家設備について、前記需要電力に基づいて、前記単位時間期間において他の需要家設備から供給を受ける必要がある不足電力量を計算し、
     前記グループ形成器は、前記複数の需要家設備のうち、前記蓄電装置を備える少なくとも1つの需要家設備を含むように、前記単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備と、前記単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備とを組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成し、
     前記送受電制御器は、前記第1及び第2の需要家設備を含む各グループにおいて、前記蓄電装置を備える各需要家設備の前記蓄電装置の蓄電量が前記単位時間期間にわたって前記第1のしきい値以下かつ前記第2のしきい値以上になるように、前記第1の需要家設備から前記第2の需要家設備への送電電力を決定する、
    請求項1記載の電力制御装置。
  3.  前記グループ形成器は、前記複数の需要家設備のうち、前記単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第2の需要家設備を組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成する、
    請求項1又は2記載の電力制御装置。
  4.  前記グループ形成器は、前記単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第2の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第1及び第2の需要家設備のうち、前記単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第2の需要家設備を組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成する、
    請求項1又は2記載の電力制御装置。
  5.  前記グループ形成器は、前記単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第2の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第1及び第2の需要家設備のうち、互いに最も近接した場所に設けられた少なくとも1つの第1の需要家設備及び少なくとも1つの第2の需要家設備を組み合わせることにより、前記第1及び第2の需要家設備を含む少なくとも1つのグループを形成する、
    請求項1又は2記載の電力制御装置。
  6.  前記グループ形成器は、前記複数の需要家設備のうち、前記蓄電装置を備える少なくとも1つの需要家設備を含むように、前記単位時間期間において余剰電力量を有する少なくとも1つの第1の需要家設備と、前記単位時間期間において不足電力量を有する少なくとも1つの第2の需要家設備と、前記単位時間期間において余剰電力量及び不足電力量の両方を有する少なくとも1つの第3の需要家設備とを組み合わせることにより、前記第1~第3の需要家設備を含む少なくとも1つのグループを形成し、
     前記送受電制御器は、前記第1~第3の需要家設備を含む各グループにおいて、前記蓄電装置を備える各需要家設備の前記蓄電装置の蓄電量が前記単位時間期間にわたって前記第1のしきい値以下かつ前記第2のしきい値以上になるように、前記第1の需要家設備から前記第3の需要家設備への送電電力と、前記第3の需要家設備から前記第2の需要家設備への送電電力とを決定する、
    請求項1又は2記載の電力制御装置。
  7.  前記グループ形成器は、前記複数の需要家設備のうち、前記単位時間期間において互いに最も近接した余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせ、前記単位時間期間において互いに最も近接した不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つの第2の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせることにより、前記第1~第3の需要家設備を含む少なくとも1つのグループを形成する、
    請求項6記載の電力制御装置。
  8.  前記グループ形成器は、
     前記単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第3の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第1及び第3の需要家設備のうち、前記単位時間期間のうちの互いに最も近接した部分時間期間において余剰電力量及び不足電力量をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせ、
     前記単位時間期間において前記第3のしきい値よりも互いに近接する不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つの第2の需要家設備及び少なくとも1つの第3の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第2及び第3の需要家設備のうち、前記単位時間期間のうちの互いに最も近接した部分時間期間において不足電力量及び余剰電力量をそれぞれ有する少なくとも1つの第2の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせ、
     これにより、前記第1~第3の需要家設備を含む少なくとも1つのグループを形成する、
    請求項6記載の電力制御装置。
  9.  前記グループ形成器は、
     前記単位時間期間において第3のしきい値よりも互いに近接する余剰電力量の合計値及び不足電力量の合計値をそれぞれ有する少なくとも1つの第1の需要家設備及び少なくとも1つの第3の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第1及び第3の需要家設備のうち、互いに最も近接した場所に設けられた少なくとも1つの第1の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせ、
     前記単位時間期間において前記第3のしきい値よりも互いに近接する不足電力量の合計値及び余剰電力量の合計値をそれぞれ有する少なくとも1つの第2の需要家設備及び少なくとも1つの第3の需要家設備の複数の組み合わせが利用可能であるとき、前記利用可能な各組み合わせの第2及び第3の需要家設備のうち、互いに最も近接した場所に設けられた少なくとも1つの第2の需要家設備及び少なくとも1つの第3の需要家設備を組み合わせ、
     これにより、前記第1~第3の需要家設備を含む少なくとも1つのグループを形成する、
    請求項6記載の電力制御装置。
  10.  前記送受電制御器は、前記複数の需要家設備のうち、前記単位時間期間において余剰電力量及び不足電力量を有しない第4の需要家設備には、他の需要家設備との間で電力を送受信させない、
    請求項1~9のうちの1つに記載の電力制御装置。
  11.  前記電力制御装置は、予め決められたトリガに応じて、前記需要電力、前記発電電力、及び前記固有蓄電量の予測と、前記余剰電力量及び前記不足電力量の計算と、前記少なくとも1つのグループの形成と、前記送電電力の決定とを繰り返す再構成判定器をさらに備える、
    請求項1~10のうちの1つに記載の電力制御装置。
  12.  前記再構成判定器は、前記単位時間期間ごとに、前記需要電力、前記発電電力、及び前記固有蓄電量の予測と、前記余剰電力量及び前記不足電力量の計算と、前記少なくとも1つのグループの形成と、前記送電電力の決定とを繰り返す、
    請求項11記載の電力制御装置。
  13.  前記再構成判定器は、新たに予測された前記需要電力、前記発電電力、及び前記固有蓄電量のうちの少なくとも1つが、以前に予測された前記需要電力、前記発電電力、及び前記固有蓄電量とは異なるとき、前記余剰電力量及び前記不足電力量の計算と、前記少なくとも1つのグループの形成と、前記送電電力の決定とを繰り返す、
    請求項11又は12記載の電力制御装置。
  14.  前記再構成判定器は、実際の前記需要電力及び前記発電電力の少なくとも一方が、予測された前記需要電力及び前記発電電力とは異なるとき、前記需要電力、前記発電電力、及び前記固有蓄電量の予測と、前記余剰電力量及び前記不足電力量の計算と、前記少なくとも1つのグループの形成と、前記送電電力の決定とを繰り返す、
    請求項11~13のうちの1つに記載の電力制御装置。
  15.  前記再構成判定器は、前記需要家設備又は前記電力網の故障を検出したとき、前記需要電力、前記発電電力、及び前記固有蓄電量の予測と、前記余剰電力量及び前記不足電力量の計算と、前記少なくとも1つのグループの形成と、前記送電電力の決定とを繰り返す、
    請求項11~14のうちの1つに記載の電力制御装置。
  16.  前記各需要家設備は、電力会社設備に接続され、前記電力会社設備から商用電力の供給を受ける、
    請求項1~15のうちの1つに記載の電力制御装置。
  17.  前記過不足電力量計算器は、
     前記商用電力のピークカット目標電力の設定値を有し、
     前記ピークカット目標電力にさらに基づいて、前記余剰電力量及び前記不足電力量を計算する、
    請求項16記載の電力制御装置。
  18.  前記過不足電力量計算器は、前記商用電力が利用可能であるか否かに応じて、前記第1及び第2のしきい値のうちの少なくとも一方を変化させる、
    請求項16又は17記載の電力制御装置。
  19.  電力網を介して互いに接続された複数の需要家設備と、
     請求項1~18のうちの1つに記載の電力制御装置とを含む、
    電力システム。
  20.  前記各需要家設備は、他の需要家設備に送電するように前記電力制御装置から指示されたとき、前記他の需要家設備に送電するための予め決められた条件を満たしているか否かを判断し、前記条件を満たしているときのみ前記他の需要家設備に送電する需要家制御装置をそれぞれ備える、
    請求項19記載の電力システム。
  21.  電力網を介して互いに接続された複数の需要家設備を含む電力システムのための電力制御装置であって、
     前記電力システムは、前記複数の需要家設備のうちの少なくとも2つの需要家設備をそれぞれ含む複数の電力グリッド設備を含み、
     前記複数の電力グリッド設備は負荷装置をそれぞれ備え、前記複数の電力グリッド設備のうちの少なくとも1つは発電装置をさらに備え、前記複数の電力グリッド設備のうちの少なくとも2つは蓄電装置をさらに備え、
     前記電力制御装置は、予測器と、過不足電力量計算器と、グループ形成器と、送受電制御器とを備え、
     前記予測器は、
     単位時間期間における前記各電力グリッド設備の前記負荷装置の需要電力を予測し、
     前記発電装置を備える各電力グリッド設備について、前記単位時間期間における前記各電力グリッド設備の前記発電装置の発電電力を予測し、
     前記蓄電装置を備える各電力グリッド設備について、前記単位時間期間における前記各電力グリッド設備の前記蓄電装置の蓄電量であって、他の電力グリッド設備に対して電力を送受信しないときの蓄電量を示す固有蓄電量を予測し、
     前記過不足電力量計算器は、
     前記発電装置及び前記蓄電装置を備える各電力グリッド設備について、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が第1のしきい値に達しているときに前記発電装置によって発電されて前記負荷装置によって消費されない余剰電力量を計算し、
     前記蓄電装置を備える各電力グリッド設備について、前記需要電力及び前記固有蓄電量に基づいて、又は、前記需要電力、前記発電電力、及び前記固有蓄電量に基づいて、前記単位時間期間において前記固有蓄電量が前記第1のしきい値より小さい第2のしきい値に達しているときに他の電力グリッド設備から供給を受ける必要がある不足電力量を計算し、
     前記グループ形成器は、前記蓄電装置を備える各電力グリッド設備のうち、前記単位時間期間において余剰電力量を有する少なくとも1つの第1の電力グリッド設備と、前記単位時間期間において不足電力量を有する少なくとも1つの第2の電力グリッド設備とを組み合わせることにより、前記第1及び第2の電力グリッド設備を含む少なくとも1つのグループを形成し、
     前記送受電制御器は、前記第1及び第2の電力グリッド設備を含む各グループにおいて、前記第1及び第2の電力グリッド設備の前記蓄電装置の蓄電量が前記単位時間期間にわたって前記第1のしきい値以下かつ前記第2のしきい値以上になるように、前記第1の電力グリッド設備から前記第2の電力グリッド設備への送電電力を決定する、
    電力制御装置。
PCT/JP2018/008998 2017-03-13 2018-03-08 電力制御装置及び電力システム WO2018168646A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2019505940A JP7002041B2 (ja) 2017-03-13 2018-03-08 電力制御装置及び電力システム
CN201880018137.6A CN110419151B (zh) 2017-03-13 2018-03-08 电力控制装置和电力系统
US16/493,596 US10833505B2 (en) 2017-03-13 2018-03-08 Power controller apparatus for power system including multiple customer facilities with battery apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017047714 2017-03-13
JP2017-047714 2017-03-13

Publications (1)

Publication Number Publication Date
WO2018168646A1 true WO2018168646A1 (ja) 2018-09-20

Family

ID=63523417

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/008998 WO2018168646A1 (ja) 2017-03-13 2018-03-08 電力制御装置及び電力システム

Country Status (4)

Country Link
US (1) US10833505B2 (ja)
JP (1) JP7002041B2 (ja)
CN (1) CN110419151B (ja)
WO (1) WO2018168646A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200358287A1 (en) * 2018-02-19 2020-11-12 Honda Motor Co., Ltd. Supplying at least portion of excess power from one portable power supply device to another portable power supply device
JP2020188559A (ja) * 2019-05-13 2020-11-19 株式会社デンソー 地域コントローラ、建物コントローラおよびエネルギー管理システム
WO2023074149A1 (ja) * 2021-10-26 2023-05-04 株式会社Nttドコモ 電力制御システム
KR102537638B1 (ko) * 2022-11-18 2023-05-31 주식회사 크로커스 실계측된 설비 부하 전압에 기초한 전압 제어 장치
JP2023108966A (ja) * 2022-01-26 2023-08-07 京セラ株式会社 電力管理装置及び電力管理方法
JP2023174203A (ja) * 2022-05-27 2023-12-07 トヨタホーム株式会社 送電システム
JP2023183303A (ja) * 2022-06-15 2023-12-27 トヨタホーム株式会社 送電システム

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6820905B2 (ja) * 2017-12-29 2021-01-27 ゴゴロ インク 交換可能エネルギー貯蔵装置ステーションを管理するためのシステムおよび方法
US11817710B2 (en) * 2018-08-07 2023-11-14 Kyocera Corporation Control apparatus and control method for controlling charge and discharge of storage battery apparatuses
US10326305B1 (en) * 2018-08-27 2019-06-18 Ekergy Llc Personal power plant system and methods of inverse energy generation
JP7110963B2 (ja) * 2018-12-11 2022-08-02 トヨタ自動車株式会社 滞空する凧型構造体を用いた風力発電システム
US20220043414A1 (en) * 2020-08-05 2022-02-10 Korea Advanced Institute Of Science And Technology Apparatus and method for operating energy storage system
CN114065644B (zh) * 2021-11-24 2025-07-15 中国商用飞机有限责任公司 一次配电系统的配电盘箱获取方法、装置和计算机设备
EP4485732A1 (en) * 2023-06-29 2025-01-01 Instituto Superior de Engenharia do Porto A computational method and a system for the management of energy resources provided in a neighbourhood

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004015882A (ja) * 2002-06-05 2004-01-15 Mitsubishi Heavy Ind Ltd 分散電源システムおよびその運用方法、並びに運用プログラム
JP2013187935A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp システム、情報処理方法及びコンピュータ・プログラム
JP2016010276A (ja) * 2014-06-26 2016-01-18 三菱電機株式会社 エネルギーマネジメントシステム

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8401708B2 (en) * 2007-03-26 2013-03-19 Vpec, Inc. Electric power system
JP5467010B2 (ja) 2010-07-22 2014-04-09 ニチコン株式会社 学習型蓄電池マネジメントシステム
JP2012252580A (ja) * 2011-06-03 2012-12-20 Sony Corp 電力制御装置、電力管理装置および電力管理システム
JP5364768B2 (ja) 2011-09-26 2013-12-11 株式会社東芝 電力需給スケジューリング装置
JP5909555B2 (ja) 2012-08-27 2016-04-26 株式会社日立製作所 需要家協調支援装置
EP2915693B1 (en) 2012-10-31 2020-09-16 Kabushiki Kaisha Toshiba Power management device and power management system
JP2014222396A (ja) * 2013-05-13 2014-11-27 パナソニック株式会社 管理装置、機器管理方法、管理システム
WO2014207851A1 (ja) * 2013-06-26 2014-12-31 三菱電機株式会社 需給計画装置、需給計画方法、需給計画プログラムおよび記録媒体
JP6148120B2 (ja) * 2013-08-29 2017-06-14 京セラ株式会社 エネルギー管理装置、エネルギー管理方法及びエネルギー管理システム
JP6133447B2 (ja) 2014-02-13 2017-05-24 株式会社日立製作所 電力融通管理システムおよび電力融通管理方法
US20170070089A1 (en) * 2014-03-12 2017-03-09 Nec Corporation Storage battery sharing system, information processing device, storage battery sharing method, and recording medium recording storage battery sharing program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004015882A (ja) * 2002-06-05 2004-01-15 Mitsubishi Heavy Ind Ltd 分散電源システムおよびその運用方法、並びに運用プログラム
JP2013187935A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp システム、情報処理方法及びコンピュータ・プログラム
JP2016010276A (ja) * 2014-06-26 2016-01-18 三菱電機株式会社 エネルギーマネジメントシステム

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200358287A1 (en) * 2018-02-19 2020-11-12 Honda Motor Co., Ltd. Supplying at least portion of excess power from one portable power supply device to another portable power supply device
US11799294B2 (en) * 2018-02-19 2023-10-24 Honda Motor Co., Ltd. Supplying at least portion of excess power from one portable power supply device to another portable power supply device
JP2020188559A (ja) * 2019-05-13 2020-11-19 株式会社デンソー 地域コントローラ、建物コントローラおよびエネルギー管理システム
WO2023074149A1 (ja) * 2021-10-26 2023-05-04 株式会社Nttドコモ 電力制御システム
JP2023108966A (ja) * 2022-01-26 2023-08-07 京セラ株式会社 電力管理装置及び電力管理方法
JP7551672B2 (ja) 2022-01-26 2024-09-17 京セラ株式会社 電力管理装置及び電力管理方法
JP2023174203A (ja) * 2022-05-27 2023-12-07 トヨタホーム株式会社 送電システム
JP7728731B2 (ja) 2022-05-27 2025-08-25 トヨタホーム株式会社 送電システム
JP2023183303A (ja) * 2022-06-15 2023-12-27 トヨタホーム株式会社 送電システム
JP7749518B2 (ja) 2022-06-15 2025-10-06 トヨタホーム株式会社 送電システム
KR102537638B1 (ko) * 2022-11-18 2023-05-31 주식회사 크로커스 실계측된 설비 부하 전압에 기초한 전압 제어 장치

Also Published As

Publication number Publication date
US10833505B2 (en) 2020-11-10
CN110419151B (zh) 2022-11-15
JP7002041B2 (ja) 2022-01-20
JPWO2018168646A1 (ja) 2020-01-09
US20200083711A1 (en) 2020-03-12
CN110419151A (zh) 2019-11-05

Similar Documents

Publication Publication Date Title
WO2018168646A1 (ja) 電力制御装置及び電力システム
KR101945501B1 (ko) 에너지 저장 장치와 태양광 발전을 이용한 전력 공급 제어 시스템 및 방법
US11757304B2 (en) Versatile site energy router
US20070005192A1 (en) Fast acting distributed power system for transmission and distribution system load using energy storage units
US9153963B2 (en) Electric power control apparatus and grid connection system having same
US20220244076A1 (en) Distributed control of energy storage device charging and grid stability
US9893526B2 (en) Networked power management and demand response
US8335595B2 (en) System and method for adaptive islanding for stored/distributed energy devices
US20130178998A1 (en) Systems and methods for controlling power systems
US10461535B2 (en) Power management system, power management method, and computer program
JP6025332B2 (ja) 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
US11404877B2 (en) Hierarchical power control system
JP2013143814A (ja) 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
JP2017034968A (ja) 電力管理方法
KR101918625B1 (ko) 에너지 저장 장치를 이용하여 복수의 수용가를 대상으로 전력 서비스를 제공하는 시스템 및 방법
JP2019126157A (ja) 電力管理システムおよび電力管理方法
US20120330671A1 (en) System and method for implementing congestion pricing in a power distribution network
WO2016144357A1 (en) Power distribution plan
WO2019211826A1 (en) System and method for managing a hierarchic power distribution grid
JP2020048370A (ja) 電力管理方法および電力管理システム
CN112655127B (zh) 电力控制装置和电力系统
JP6936097B2 (ja) 電力管理装置および電力管理方法
JP7225142B2 (ja) 電力供給源管理システム
GB2607574A (en) Energy management devices and methods
Postelnicu et al. FRACTAL AND MARKOV-BASED LOAD MODELING FOR MULTI-GENERATOR DISPATCH AND PROTECTION IN URBAN NETWORKS

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18767262

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019505940

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18767262

Country of ref document: EP

Kind code of ref document: A1