WO2018198437A1 - 電源システム、電源システムの故障診断方法およびシステム制御装置 - Google Patents
電源システム、電源システムの故障診断方法およびシステム制御装置 Download PDFInfo
- Publication number
- WO2018198437A1 WO2018198437A1 PCT/JP2017/047046 JP2017047046W WO2018198437A1 WO 2018198437 A1 WO2018198437 A1 WO 2018198437A1 JP 2017047046 W JP2017047046 W JP 2017047046W WO 2018198437 A1 WO2018198437 A1 WO 2018198437A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power supply
- voltage
- switching
- switch
- supply device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/4207—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
- H01M10/482—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/02—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from AC mains by converters
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
- H01M2010/4271—Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
Definitions
- the present invention relates to a power supply system, a failure diagnosis method for the power supply system, and a system control apparatus.
- Patent Document 1 As a conventional power supply system, a configuration described in Patent Document 1 is known.
- This power supply system has a configuration in which a plurality of power supply devices are connected in parallel to the load, and before starting, there is a disconnection abnormality by turning on and off the switch provided for each power supply device for each power supply device. Is diagnosed.
- An object of the present invention is to shorten the diagnosis time.
- a power supply system includes a power supply group in which a plurality of power supply devices are connected in parallel to a load, and a system control unit that controls the power supply group.
- Switching means connected in series to the battery device and switching between connection and disconnection, and voltage detection means for detecting the voltage of the battery device, and the system control means includes the switching means of at least one power supply device.
- the fault diagnosis is performed based on the voltage value detected by the voltage detection means of the power supply apparatus to which the switching means not switched to the connection side belongs while switching to the connection side.
- FIG. 1 is a block diagram of a power supply system according to Embodiment 1.
- FIG. 2 is an example of an electrical contact structure according to the first embodiment. It is a flowchart in the power supply system of FIG. It is a flowchart in the power supply system of FIG. It is the figure which contrasted Embodiment 1 and a comparative example. It is the figure which contrasted Embodiment 2 and a comparative example. It is a figure explaining the diagnostic path
- Reference numeral 1 denotes a load / regenerative device, for example, an inverter and a motor mounted on a vehicle. Electric power from the power supply device is supplied to the motor via the inverter, and the vehicle is driven by rotating the wheels by the rotation of the motor. In addition, the power generated by the regenerative braking of the motor is supplied to the power supply device.
- a load / regenerative device for example, an inverter and a motor mounted on a vehicle. Electric power from the power supply device is supplied to the motor via the inverter, and the vehicle is driven by rotating the wheels by the rotation of the motor.
- the power generated by the regenerative braking of the motor is supplied to the power supply device.
- 4 is a relay. In FIG. 1, one end of the relay 4 is connected to the high voltage harness 3 on the low voltage side.
- Reference numeral 5 denotes a mating type connector, and one of the two mated connectors is connected to the other end of the relay 4.
- 6 is a fitting connector similar to 5, and one of the connectors is connected to the load / regenerative device 1 via the high voltage harness 2 on the high voltage side.
- a battery group 7 includes a high-voltage side high-voltage harness 8 connected to the other connector of the connector 6, a low-voltage side high-voltage harness 9 connected to the other connector of the connector 5, and four power supply devices 10. , 20, 30, 40.
- the power supply devices 10, 20, 30 and 40 have substantially the same configuration and are connected in parallel to the load / regenerative device 1.
- the power supply device 10 has an electrical contact 11 connected to the harness 8, an electrical contact 12 connected to the harness 9, a plurality of single cells connected in series, and a negative electrode end connected to the electrical contact 12.
- the battery device 13, the switch 14 having one end connected to the positive terminal of the battery device 13 and the other end connected to the electrical contact 11, between the electrical contact 11 and the switch 14, the electrical contact 12, and the battery device
- the voltmeter 15 for measuring the voltage difference between the negative electrode terminal 13 and the voltage value measured by the voltmeter 15 are input, and the input voltage value is transmitted to a master BMS (Battery Management System) 17 to be described later.
- a master BMS Battery Management System
- Slave BMS Battery Management System
- S-BMS S-BMS
- M-BMS M-BMS
- the master BMS 17 as the system control means and the slave BMS 16 as the battery control means are configured by one control unit 100 in the first embodiment.
- the components 21 to 26 of the power supply device 20 in FIG. 1 and their connection relationships, the components 31 to 36 of the power supply device 30 and their connection relationships, the components 41 to 46 of the power supply device 40 and their connection relationships are shown in FIG.
- the master BMS 17 which is a part of the control unit 100 of the power supply apparatus 10 is different from the other power supply apparatus in that the slave BMSs 26, 36, and 46 are connected to the control unit 100 (functional part of the master BMS 17) of the power supply apparatus 10. Has been.
- reference numeral 200 denotes a VCU (Vehicle Control Unit), which is a load / regenerative device 1, a relay 4, a control unit 100, an ignition switch (not shown), and a sensor (vehicle speed sensor or the like) 300 for inputting a vehicle state signal. It is connected to the.
- the VCU 200 inputs the state of the ignition switch, and the startup process of the VCU 200 itself, the startup command to the master BMS 17 of the control device 100, and the switches 14, 2, 43, 44 are turned on (closed) to the slave BMSs 16, 26, 36, 46. Order).
- the relay 4 turns off the relay 4 Turns on (closes) and starts charge / discharge control.
- the VCU 200 inputs a vehicle status signal from the sensor 300 or inputs a status signal of the battery group 7 from the master BMS 17 to calculate a target value to be output to the load / regenerative device 1 or to check a charging status of the battery group.
- a command for monitoring and charge / discharge control is output to the master BMS 17.
- FIG. 2 shows an example of the electrical contacts 11, 12, 21, 22, 31, 32, 41, 42.
- the electrical contact 11 will be described as an example.
- Reference numeral 111 denotes an insulating substrate, which is attached to, for example, a case 110 that stores the battery group 7.
- a metal plate 112 is fixed to the insulating plate 111.
- 113 is a round terminal attached to one end of the harness 8
- 114 is a round terminal attached to one end of the harness 9.
- Reference numeral 115 denotes a metal bolt which is inserted into a hole formed in the round terminal 113 and a hole formed in the metal plate 112 and screwed to the insulating substrate 111.
- Reference numeral 116 also denotes a metal bolt that is inserted into a hole formed in the round terminal 114 and another hole formed in the metal plate 112 and screwed into another hole of the insulating substrate 111.
- Step (hereinafter referred to as S) 1 is a step of determining whether or not the VCU 200 has detected an operation of an ignition switch operated by the vehicle operator at the start of traveling.
- the VCU 200 instructs the master BMS 17 and the slave BMSs 16, 26, 36, and 46 to start up.
- the master BMS 17 performs a transition from the sleep state to the non-sleep state as a start process, and transmits a start completion flag to the VCU 200 after the shift is completed.
- the VCU 200 that has received the activation completion flag from the master BMS 17 transmits a diagnosis start command to the master BMS 17.
- each slave BMS performs a transition from the sleep state to the non-sleep state as a start process, and transmits a start completion flag to the master BMS 17 after the shift is completed. At this time, each slave BMS performs an on-fixation diagnosis and an off-fixation diagnosis of the switch, and transmits it together with a start completion flag.
- the master BMS 17 receives the diagnosis start command from the VCU 200, receives the start completion flag from each slave BMS, and determines whether or not the switch sticking diagnosis results are all normal.
- the switch turn-on order for charge / discharge preparation stored in advance in the memory of the master BMS 17 is read out. In the following, it is assumed that the switches 14, 24, 34, 44 are turned on in order in order to simplify the description. If any of the conditions is not met, an abnormal signal is transmitted to the VCU 200 (proceeds to S12).
- the master BMS 17 transmits an instruction to turn on the switch 14 to the slave BMS 16 of the power supply device 10.
- the slave BMS 16 turns on the switch 14. Thereafter, the master BMS 17 is notified that it is on.
- the master BMS 17 confirms whether or not the notification that the switch 14 is in the ON state is received from the slave BMS 16, and if received, the voltage value is applied to the slave BMS 26 of the power supply device 20 to be turned on next. An instruction signal to be sent is transmitted.
- the slave BMS 26 determines whether or not the voltage value measured by the voltmeter 25 is equal to or higher than a predetermined voltage. If the voltage is equal to or higher than the predetermined voltage, the slave BMS 26 determines that the voltage is normal. A normal or abnormal signal is transmitted to the master BMS 17.
- the predetermined voltage is a voltage determined by multiplying the voltage value smaller than the voltage when the SOC (State of Charge) of the single cell used in the power supply device is 0% by the number of single cells, and the reference voltage is higher than this. If there is, it can be judged that there is no disconnection including contact failure.
- S11 normal or abnormal information is received from the slave BMS 26 of the second power supply device 20 in the order of input, and if normal, the process proceeds to S30 in FIG. If abnormal, an abnormal signal is transmitted to the VCU 200.
- S12 when the VCU 200 receives an abnormal signal, the VCU 200 transmits a stop command to the slave BMS 16 via the master BMS 17 (S13). Since the switch 14 has been turned on in the description so far, an instruction to turn off the switch 14 is transmitted to the slave BMS 16.
- the switch 14 is turned off by the slave BMS16. Thereafter, a flag indicating that the state is turned off is transmitted to the VCU 200 via the master BMS 17 (S15).
- the VCU 200 executes a stop process. As the stop process, for example, an abnormal lamp is lit on the in-vehicle monitor or the shift to the running mode is prohibited.
- the master BMS 17 gives an instruction to turn on the switch 24 of the second power supply device 20 in the turn-on order.
- the slave BMS 26 turns on the switch 24, and then notifies the master BMS 17 that it is in the on state.
- the master BMS 17 confirms whether or not the notification that the switch 24 is ON is received. If received, the instruction signal for sending the voltage value to the slave BMS 36 of the power supply device 30 to be turned on next. Send.
- the slave BMS 36 determines whether or not the voltage value measured by the voltmeter 35 is equal to or higher than a predetermined voltage, and determines that it is normal if it is equal to or higher than the predetermined voltage, and abnormal if it is lower than the predetermined voltage.
- a normal or abnormal signal is transmitted to the master BMS 17.
- the predetermined voltage is a voltage determined by multiplying the voltage value smaller than the voltage when the SOC (State of Charge) of the single cell used in the power supply device is 0% by the number of single cells, and the reference voltage is higher than this. If there is, it can be judged that there is no disconnection including contact failure.
- S34 normal or abnormal information is received from the slave BMS 36 of the third power supply device 30 in the order of input, and if normal, the process proceeds to S35. If abnormal, an abnormal signal is transmitted to the VCU 200 (proceeding to S12). In S ⁇ b> 35, the master BMS 17 transmits an instruction to turn on the switch 34 of the third power supply device 30 in the order of input to the slave BMS 36. In S36, the slave BMS 36 turns on the switch 34, and then notifies the master BMS 17 that it is on.
- the master BMS 17 confirms whether or not the notification that the switch 34 is ON is received. If received, the instruction signal for sending the voltage value to the slave BMS 46 of the power supply device 40 to be turned on next. Send.
- the slave BMS 46 determines whether or not the voltage value measured by the voltmeter 45 is equal to or higher than a predetermined voltage, and determines that it is normal if it is equal to or higher than the predetermined voltage, and abnormal if it is lower than the predetermined voltage. A normal or abnormal signal is transmitted to the master BMS 17.
- the predetermined voltage is a voltage determined by multiplying the voltage value smaller than the voltage when the SOC (State of Charge) of the single cell used in the power supply device is 0% by the number of single cells, and is higher than this. If there is, it can be judged that there is no disconnection including contact failure.
- S39 normal or abnormal information is received from the slave BMS 46 of the fourth power supply apparatus 40 in the order of input, and if normal, the process proceeds to S40. If abnormal, an abnormal signal is transmitted to the VCU 200 (proceeding to S12).
- the master BMS 17 transmits to the slave BMS 46 an instruction to turn on the switch 44 of the fourth power supply device 40 in the turn-on order.
- the slave BMS 46 turns on the switch 44, and then notifies the master BMS 17 that it is in the on state.
- the master BMS 17 confirms that all the power supply devices have been switched on, and transmits an all-on state signal to the VCU.
- the VCU 200 starts charging / discharging.
- the processing from S12 to S16 is performed when an abnormal state occurs, such as overcharge or overdischarge determined by the VCU during charge / discharge.
- FIG. 5 is a process chart in which the diagnosis process part and the charge / discharge preparation process are extracted from the flowcharts of FIGS. 3 and 4, and the effects of the first embodiment will be described.
- FIG. 5A shows the diagnostic process of the first embodiment
- FIG. 5B shows the diagnostic process of the comparative example.
- the power supply apparatus starts from a state where all the switches are turned off.
- the preparatory process is a state for starting charge / discharge, and is a state in which all switches are turned on.
- the process of FIG. 5A will be described. First, after the switch 14 is turned on in S501, the voltage is measured by the voltmeter 25 in S502, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage described above.
- the switch 24 is turned on in S503, the voltage is measured by the voltmeter 35 in S504, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage described above.
- the switch 34 is turned on in S505, the voltage is measured by the voltmeter 45 in S506, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage described above. If it is determined that the voltage is smaller than the predetermined voltage in any of the determinations, it is determined in S508 that the disconnection abnormality includes a contact failure and abnormality processing is performed. For example, the processing is shown in S12 to S16 of FIG. If the voltages of all the power supply devices are equal to or higher than the predetermined voltage, the remaining switch 44 is turned on in S07, and the diagnosis process and the preparation process are normally completed (S509).
- a voltmeter is prepared as the only one common to each power supply device as in Patent Document 1, and the switch is turned on in turn for each power supply device, voltage measurement, Indicates diagnostic procedure to turn off.
- FIGS. 5A and 5B when the entire diagnosis process and preparation process are compared, there is no process of turning off the switch that has been turned on and turning it on again, so that the process can be shortened. Even if only the diagnostic process is compared, that is, excluding the process of turning on from the off state, the disconnection failure can be diagnosed by turning on the switch of at least one power supply device by the voltage applied to the other power supply device. .
- the switch 24 of the next power supply device 20 determined in S6 is turned on.
- the normality of the path is determined in S33, the next power supply determined in S6.
- the switch 34 of the device 30 is turned on and it is determined that the path is normal in S38, the switch 44 is turned on, such as the switch 44 of the next power supply device 40 determined in S6 is turned on.
- the failure diagnosis is performed with the voltage of the power supply device in which the switch is off, the diagnosis itself is not affected, and a step of changing the switch from off to on is not necessary after the diagnosis to prepare for charging.
- step S601 the switch 14 is turned on.
- step S602 the voltage value is measured by the voltmeter 25 of the power supply device 20 to which the switch 24 to be turned on secondly belongs, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage.
- step S603 the voltage value is measured by the voltmeter 35 of the power supply device 30 to which the switch 34 to be turned on third belongs, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage described above.
- step S604 a voltage value is measured by the voltmeter 45 of the power supply device 40 to which the switch 44 scheduled to be turned on belongs, and it is determined whether or not the voltage is equal to or higher than the predetermined voltage.
- S605 if the voltages of all the power supply devices are equal to or higher than the predetermined voltage, it is determined as normal.
- FIG. 7 illustrates a path for diagnosing the presence or absence of a disconnection abnormality in the second embodiment.
- the path 61 is diagnosed by S601, S602, the path 62 is diagnosed by S603, and the path 63 is diagnosed by S604.
- the presence or absence of disconnection of the high-voltage harness can be diagnosed and the presence or absence of contact failure can be diagnosed.
- the path 61 of FIG. 7 is diagnosed by S501 and S502 of FIG. 5A
- the path 62 is diagnosed by S504, and the path 63 is diagnosed by S506.
- the path 62 and the voltage of S604 are set with the value of the voltmeter 35 of S603 without turning on the switches 24, 34, 44 that are turned off.
- the path 63 can be diagnosed with a total of 45 values. As described above, since the voltage can be applied to the power supply device to which the switch in the off state belongs by turning on the switch of at least one power supply device in the power supply group 7 (closed state), the disconnection including the contact failure Diagnosis can be performed in a short time.
- each power supply device has a structure having electrical contacts at both ends of a circuit including the switch and the battery device, it is possible to determine a contact failure at the electrical contacts.
- the master BMS 17 is configured by the same CPU as the BMS of the power supply apparatus 10, but the master BMS 17 and the slave BMS may be configured by different CPUs.
- the transmission of signals from the master BMS 17 to the slave BMSs 26, 36, 46 has been described by serial communication. However, parallel communication in which the master BMS 17 communicates with the slave BMSs 26, 36, 46 independently may be used. There may or may not be a case for storing the battery group 7. There may or may not be a case for storing the power supply.
- the master BMS 17 is not essential and may be shared by the VCU.
- the load / regenerative device 1 is not limited to a vehicle driving motor or an inverter, but may be a power load other than a moving body, that is, a stationary power supply device.
- the relay 4 was demonstrated in the example arrange
- the battery apparatus 13 showed the example which connected the cell in series, the thing which connected the cell in series and parallel may be used, and what was connected in parallel may be sufficient as it.
- connection relationship is not limited to that shown in FIG. 1, and is necessary as appropriate, such as adding a thermometer for detecting the temperature of the unit cell or battery device 13, an ammeter for detecting the current flowing through the battery device 13, or a fuse.
- You may arrange an electric circuit component in the middle.
- electrical contacts 11, 12, 21, 22, 31, 32, 41, 42 as shown in FIG. 2 provided at both ends of the circuit including the switch of each power supply device and the battery device are provided.
- the electrical contacts may be mating connectors.
- a storage case may be prepared for each battery device, one connector of the mating connector may be attached to the case, and the other connector may be connected to 8.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Tests Of Electric Status Of Batteries (AREA)
Abstract
診断時間の低減を図る。電源システム(10,20,30,40)は、電池装置(13,23,33,43)と、各電池装置にそれぞれ直列に接続されたスイッチ(14,24,34,44)と、それぞれの電池装置及びスイッチで構成される回路の電圧を計測する電圧計(15,25,35,45)とを有し、電源装置(10,20,30,40)を並列に接続した電源システムを制御する装置は、少なくとも一つの電源装置のスイッチをオンにすると共に、オフ状態のスイッチが属する電源装置の電圧値に基づいて故障診断を行う。
Description
本発明は、電源システムと電源システムの故障診断方法とシステム制御装置に関するものである。
従来の電源システムとしては、特許文献1に記載されている構成が知られている。この電源システムは負荷に対して複数の電源装置を並列に接続した構成となっており、その始動前に、それぞれの電源装置に設けられたスイッチを電源装置毎にオンオフすることで断線異常の有無を診断している。
しかしながら、電源装置毎に電源装置内のスイッチのオンオフを繰り返すため、電源装置の数が増えると、診断時間が長くなる。本発明は、診断時間の短縮を図ることを目的とする。
本発明の一実施形態である電源システムは、負荷に対して複数の電源装置が並列に接続された電源群と、電源群を制御するシステム制御手段とを有し、電源装置は、電池装置と、電池装置に直列に接続されかつ接続と切断を切り替える切り替え手段と、当該電池装置の電圧を検出する電圧検出手段と、を有し、システム制御手段は、少なくとも一つの電源装置の前記切り替え手段を接続側に切り替えると共に、接続側に切り替えていない切り替え手段が属する電源装置の電圧検出手段により検出した電圧値に基づいて故障診断を行うことを特徴とする。
故障診断の時間を短縮することができる。
図を使用して、実施形態1に係る電源システムを説明する。まず、図1のブロック図を使用して各部品や機能を説明する。
1は負荷・回生機器であり、例えば車両に搭載されたインバータ及びモータである。電源装置からの電力を、インバータを介してモータに供給しモータの回転により車輪を回転させて車両を走行させる。またモータの回生制動により発生した電力を電源装置に供給する。
1は負荷・回生機器であり、例えば車両に搭載されたインバータ及びモータである。電源装置からの電力を、インバータを介してモータに供給しモータの回転により車輪を回転させて車両を走行させる。またモータの回生制動により発生した電力を電源装置に供給する。
2は負荷・回生機器1と接続された高電圧側の強電ハーネスであり、3は負荷・回生機器1と接続された低電圧側の強電ハーネスである。4はリレーであり、図1ではリレー4の一端が低電圧側の強電ハーネス3と接続されている。5は勘合型のコネクタであり、勘合された状態の2つのコネクタのうち一方のコネクタはリレー4の他端に接続されている。6も5と同様の勘合型のコネクタであり、一方のコネクタは高電圧側の強電ハーネス2を介して負荷・回生機器1に接続されている。
7は電池群であり、コネクタ6の他方のコネクタと接続された高電圧側の強電ハーネス8と、コネクタ5の他方のコネクタに接続された低電圧側の強電ハーネス9と、4つの電源装置10,20,30,40とを有している。電源装置10,20,30,40はほぼ同様の構成をしており、負荷・回生機器1に対し並列に接続されている。
以下、電源装置10を例に説明する。電源装置10は、ハーネス8に接続された電気的接点11と、ハーネス9に接続された電気的接点12と、複数の単電池を直列に接続しかつ負極端が電気的接点12に接続された電池装置13と、一端が電池装置13の正極端に接続されかつ他端が電気的接点11に接続されたスイッチ14と、電気的接点11及びスイッチ14の間と、電気的接点12及び電池装置13の負極端との間の電圧差を計測する電圧計15と、電圧計15で計測した電圧値を入力し、入力した電圧値を後述するマスタBMS(BatteryManagement System)17に送信しマスタBMS17からの指示に従いスイッチ14のオン(閉成)及びオフの切り替えを制御するスレーブBMS(Battery Management System)16とを有している。図中ではスレーブBMSはS-BMS、マスタBMSはM-BMSと表記している。システム制御手段としてのマスタBMS17と、電池制御手段としてのスレーブBMS16は、実施形態1では一つのコントロールユニット100により構成されている。
なお、図1中の電源装置20の21から26の部品とその接続関係、電源装置30の31から36の部品とその接続関係、電源装置40の41から46の部品とその接続関係は、図1中の電源装置10の11から16の部品とその接続関係は同じであり、説明を省略する。電源装置10のコントロールユニット100の一部であるマスタBMS17が他の電源装置にない点が異なっており、スレーブBMS26、36、46は、電源装置10のコントロールユニット100(マスタBMS17機能部分)と接続されている。
次に、200は、VCU(Vehicle Control Unit)であり、負荷・回生機器1、リレー4、コントロールユニット100、及びイグニッションスイッチ(不図示)や車両の状態信号を入力するセンサ(車速センサ等)300に接続されている。
VCU200は、イグニッションスイッチの状態を入力してVCU200自身の起動処理や制御装置100のマスタBMS17への起動指令や各スレーブBMS16,26,36,46にスイッチ14,2,43,44のオン(閉成)を指示する。
VCU200は、イグニッションスイッチの状態を入力してVCU200自身の起動処理や制御装置100のマスタBMS17への起動指令や各スレーブBMS16,26,36,46にスイッチ14,2,43,44のオン(閉成)を指示する。
VCU200は、各スレーブBMS16,26,36,46のスイッチ14,24,34,44が全てオンしたことを示す信号を受信したマスタBMS17から充放電の準備が完了した旨を受信すると、リレー4をオン(閉成)し、充放電の制御を開始する。
VCU200は、車両の状態信号をセンサ300から入力したりマスタBMS17からの電池群7の状態信号を入力して、負荷・回生機器1へ出力する目標値を演算したり、電池群の充電状態をモニタし充放電の制御をする指令をマスタBMS17に出力したりする。
VCU200は、車両の状態信号をセンサ300から入力したりマスタBMS17からの電池群7の状態信号を入力して、負荷・回生機器1へ出力する目標値を演算したり、電池群の充電状態をモニタし充放電の制御をする指令をマスタBMS17に出力したりする。
図2は、電気的接点11,12,21,22,31,32,41,42の一例を示している。電気的接点11を例に説明する。111は絶縁基板であり、電池群7を格納する例えばケース110に取り付けられている。112は金属板であり絶縁板111に固定されている。
113はハーネス8の一端に取り付けられた丸型端子であり、114はハーネス9の一端に取り付けられた丸型端子である。115は金属製ボルトであり丸型端子113に形成された孔及び金属板112に形成された孔部に挿入され絶縁基板111にねじ止めされる。116も金属製ボルトであり丸型端子114に形成された孔及び金属板112に形成された別の孔部に挿入され絶縁基板111の別の孔部にねじ止めされる。
113はハーネス8の一端に取り付けられた丸型端子であり、114はハーネス9の一端に取り付けられた丸型端子である。115は金属製ボルトであり丸型端子113に形成された孔及び金属板112に形成された孔部に挿入され絶縁基板111にねじ止めされる。116も金属製ボルトであり丸型端子114に形成された孔及び金属板112に形成された別の孔部に挿入され絶縁基板111の別の孔部にねじ止めされる。
図3を使用して実施形態1の電源システムのフローチャートを説明する。
ステップ(以下、Sと表記する)1は、VCU200にて、車両操作者が走行開始時に操作するイグニッションスイッチの操作を検出したか否かを判断するステップである。イグニッションスイッチの操作を検出した場合、S2にて、VCU200はマスタBMS17及びスレーブBMS16,26,36,46に対し、起動処理を指示する。
ステップ(以下、Sと表記する)1は、VCU200にて、車両操作者が走行開始時に操作するイグニッションスイッチの操作を検出したか否かを判断するステップである。イグニッションスイッチの操作を検出した場合、S2にて、VCU200はマスタBMS17及びスレーブBMS16,26,36,46に対し、起動処理を指示する。
S3では、マスタBMS17が起動処理としてそれぞれスリープ状態から非スリープ状態への移行を行い、移行完了後、起動完了フラグをVCU200に送信する。S4では、マスタBMS17から起動完了フラグを受信したVCU200が、診断開始指令をマスタBMS17に送信する。
S5では、各スレーブBMSが起動処理としてそれぞれスリープ状態から非スリープ状態への移行を行い、移行完了後、起動完了フラグをマスタBMS17に送信する。このとき各スレーブBMSはスイッチのオン固着診断及びオフ固着診断を行い、起動完了フラグと共に送信する。
S5では、各スレーブBMSが起動処理としてそれぞれスリープ状態から非スリープ状態への移行を行い、移行完了後、起動完了フラグをマスタBMS17に送信する。このとき各スレーブBMSはスイッチのオン固着診断及びオフ固着診断を行い、起動完了フラグと共に送信する。
S6では、マスタBMS17が、VCU200からの診断開始指令を受信しかつ各スレーブBMSからの起動完了フラグを受信しかつスイッチ固着診断結果が全て正常である場合か否かを判定する。全ての条件がそろった場合、S7において、マスタBMS17のメモリに予め記憶された充放電準備のためのスイッチ投入順番を読み出す。以下は説明を簡単にするため、スイッチ14,24,34,44の順にオンするものとする。なお、いずれかの条件がそろわなかった場合は、異常信号をVCU200に送信する(S12に進む)。
S7では、マスタBMS17が電源装置10のスレーブBMS16に対しスイッチ14をオンする指示を送信する。S8では、スレーブBMS16がスイッチ14をオンにする。その後、マスタBMS17に対しオン状態である旨を通知する。S9では、マスタBMS17が、スレーブBMS16からスイッチ14がオン状態である旨の通知を受信したか否かを確認し、受信した場合は、次に投入する電源装置20のスレーブBMS26に対し電圧値を送付する指示信号を送信する。
S10では、スレーブBMS26が、電圧計25で計測した電圧値が予め定めた電圧以上か否かを判定し、予め定めた電圧以上であれば正常、予め定めた電圧より小さければ、異常と判定し、正常または異常の信号をマスタBMS17に送信する。ここで予め定めた電圧とは電源装置で使用する単電池のSOC(Stateof Charge)が0%の時の電圧より小さい電圧値に単電池数を乗じて定められる電圧を基準電圧とし、これ以上であれば接点不良を含む断線がない状態と判断できる。
S11では、投入順2番目の電源装置20のスレーブBMS26から正常または異常の情報を受信し、正常であれば図4のS30に進む。異常であれば、VCU200に異常信号を送信する。S12では、VCU200が異常信号を受信した場合は、VCU200は停止指令をマスタBMS17を介してスレーブBMS16に送信する(S13)。ここまでの説明ではスイッチ14をオンした状態なので、スレーブBMS16にスイッチ14をオフする指示を送信する。
S14ではスレーブBMS16によりスイッチ14をオフにする。その後、オフ状態になったことを示すフラグをマスタBMS17を経由してVCU200に送信される(S15)。S16では、VCU200が、停止処理を実行する。停止処理としては、例えば車載モニタに異常ランプを点灯したり、または走行モードへの移行を禁止する。次に、図4のS30では、マスタBMS17が、投入順2番目の電源装置20のスイッチ24をオンする指示を行う。
S31では、スレーブBMS26が、スイッチ24をオンし、その後、マスタBMS17に対しオン状態である旨を通知する。S32では、マスタBMS17が、スイッチ24がオンである旨の通知を受信したか否かを確認し、受信した場合は、次に投入する電源装置30のスレーブBMS36に対し電圧値を送付する指示信号を送信する。
S33では、スレーブBMS36が、電圧計35で計測した電圧値が予め定めた電圧以上か否かを判定し、予め定めた電圧以上であれば正常、予め定めた電圧より小さければ、異常と判定し、正常または異常の信号をマスタBMS17に送信する。ここで予め定めた電圧とは電源装置で使用する単電池のSOC(Stateof Charge)が0%の時の電圧より小さい電圧値に単電池数を乗じて定められる電圧を基準電圧とし、これ以上であれば接点不良を含む断線がない状態と判断できる。
S34では、投入順3番目の電源装置30のスレーブBMS36から正常または異常の情報を受信し、正常であればS35に進む。異常であれば、VCU200に異常信号を送信する(S12に進む)。S35では、マスタBMS17が、投入順3番目の電源装置30のスイッチ34をオンする指示をスレーブBMS36に送信する。S36では、スレーブBMS36がスイッチ34をオンし、その後、マスタBMS17に対しオン状態である旨を通知する。
S37では、マスタBMS17が、スイッチ34がオンである旨の通知を受信したか否かを確認し、受信した場合は、次に投入する電源装置40のスレーブBMS46に対し電圧値を送付する指示信号を送信する。
S38では、スレーブBMS46が、電圧計45で計測した電圧値が予め定めた電圧以上か否かを判定し、予め定めた電圧以上であれば正常、予め定めた電圧より小さければ、異常と判定し、正常または異常の信号をマスタBMS17に送信する。ここで予め定めた電圧とは電源装置で使用する単電池のSOC(Stateof Charge)が0%の時の電圧より小さい電圧値に単電池数を乗じて定められる電圧を基準電圧とし、これ以上であれば接点不良を含む断線がない状態と判断できる。
S38では、スレーブBMS46が、電圧計45で計測した電圧値が予め定めた電圧以上か否かを判定し、予め定めた電圧以上であれば正常、予め定めた電圧より小さければ、異常と判定し、正常または異常の信号をマスタBMS17に送信する。ここで予め定めた電圧とは電源装置で使用する単電池のSOC(Stateof Charge)が0%の時の電圧より小さい電圧値に単電池数を乗じて定められる電圧を基準電圧とし、これ以上であれば接点不良を含む断線がない状態と判断できる。
S39では、投入順4番目の電源装置40のスレーブBMS46から正常または異常の情報を受信し、正常であればS40に進む。異常であれば、VCU200に異常信号を送信する(S12に進む)。S40では、マスタBMS17が、投入順4番目の電源装置40のスイッチ44をオンする指示をスレーブBMS46に送信する。S41では、スレーブBMS46がスイッチ44をオンし、その後、マスタBMS17に対しオン状態である旨を通知する。
S42では、マスタBMS17が全ての電源装置のスイッチがオンしたことを確認し、VCUに対し全オン状態信号を送信する。S43で、VCU200は充放電を開始する。なお、図示してはいないが、充放電中にVCUで過充電や過放電と判定される等、異常状態になったらS12からS16の処理が行われる。
図5は図3,図4のフローチャートから診断工程部分と充放電準備工程を抜き出した工程表であり、実施形態1の効果について説明する。
図5(a)は実施形態1の診断工程であり、(b)は比較例の診断工程である。なお、図5(a)(b)のいずれにおいても電源装置のスイッチは全てオフしている状態から開始する。また準備工程とは充放電を開始するための状態でありスイッチ全てがオンした状態である。
図5(a)の工程を説明する。まずS501でスイッチ14をオンした後、S502で電圧計25により電圧を計測し、前述した所定電圧以上か否かを判定する。次に、S503でスイッチ24をオンした後、S504で電圧計35により電圧を計測し、前述した所定電圧以上か否かを判定する。
次に、S505でスイッチ34をオンした後、S506で電圧計45により電圧を計測し、前述した所定電圧以上か否かを判定する。いずれかの判定において、所定電圧より小さい場合と判定されると、S508で接点不良を含む断線異常と判定し異常処理を行う。例えば、図3のS12からS16に示した処理である。全ての電源装置の電圧が所定電圧以上の場合には、S07で残ったスイッチ44をオンし、正常に診断工程と準備工程が完了する(S509)。
図5(a)は実施形態1の診断工程であり、(b)は比較例の診断工程である。なお、図5(a)(b)のいずれにおいても電源装置のスイッチは全てオフしている状態から開始する。また準備工程とは充放電を開始するための状態でありスイッチ全てがオンした状態である。
図5(a)の工程を説明する。まずS501でスイッチ14をオンした後、S502で電圧計25により電圧を計測し、前述した所定電圧以上か否かを判定する。次に、S503でスイッチ24をオンした後、S504で電圧計35により電圧を計測し、前述した所定電圧以上か否かを判定する。
次に、S505でスイッチ34をオンした後、S506で電圧計45により電圧を計測し、前述した所定電圧以上か否かを判定する。いずれかの判定において、所定電圧より小さい場合と判定されると、S508で接点不良を含む断線異常と判定し異常処理を行う。例えば、図3のS12からS16に示した処理である。全ての電源装置の電圧が所定電圧以上の場合には、S07で残ったスイッチ44をオンし、正常に診断工程と準備工程が完了する(S509)。
図5(b)に示した比較例は、電圧計が特許文献1のように各電源装置共通の唯一のものとして用意され、かつ電源装置毎に順番にスイッチをオン、電圧の計測、スイッチをオフする診断手順を示している。
図5(a)と(b)による対比から明らかなように、診断工程及び準備工程の全体で比較した場合、オンしたスイッチをオフし再度オンする工程がないため、工程が短縮できる。診断工程だけを比較しても、つまりオフした状態からオンする工程を除いても、少なくとも一つの電源装置のスイッチをオンすることで、他の電源装置に印加される電圧によって断線故障を診断できる。
図5(a)と(b)による対比から明らかなように、診断工程及び準備工程の全体で比較した場合、オンしたスイッチをオフし再度オンする工程がないため、工程が短縮できる。診断工程だけを比較しても、つまりオフした状態からオンする工程を除いても、少なくとも一つの電源装置のスイッチをオンすることで、他の電源装置に印加される電圧によって断線故障を診断できる。
また、図3のS10で経路の正常が判定されると、S6で定めた次の電源装置20のスイッチ24をオンにし、S33で経路の正常が判定されると、S6で定めた次の電源装置30のスイッチ34をオンにし、S38で経路の正常が判定されると、S6で定めた更に次の電源装置40のスイッチ44をオンにするというように、スイッチをオンにしたままであってもスイッチがオフ状態の電源装置の電圧で故障診断をするため、診断自体に影響を与えないばかりか、診断後に充電準備のためにスイッチをオフからオンへ変化させる工程も不要となる。
次に、図6を使用して、図5の工程表に示した手順を変えた実施形態2について説明する。なお、ブロック図は図1、電気的接点構造は図2と同様であるため、説明を省略する。また図6(b)は図5(b)と同じ比較例の診断工程を示している。また、図6(a)(b)のいずれにおいても電源装置のスイッチは全てオフしている状態から開始している。
図6(a)の工程を説明する。S601はスイッチ14をオンする。S602は2番目に投入予定のスイッチ24が属する電源装置20の電圧計25により電圧値を計測し前述した所定電圧以上か否かを判定する。
S603は3番目に投入予定のスイッチ34が属する電源装置30の電圧計35により電圧値を計測し前述した所定電圧以上か否かを判定する。S604は4番目に投入予定のスイッチ44が属する電源装置40の電圧計45により電圧値を計測し前述した所定電圧以上か否かを判定する。S605は全ての電源装置の電圧が所定電圧以上であれば正常と判定する。
図6(a)の工程を説明する。S601はスイッチ14をオンする。S602は2番目に投入予定のスイッチ24が属する電源装置20の電圧計25により電圧値を計測し前述した所定電圧以上か否かを判定する。
S603は3番目に投入予定のスイッチ34が属する電源装置30の電圧計35により電圧値を計測し前述した所定電圧以上か否かを判定する。S604は4番目に投入予定のスイッチ44が属する電源装置40の電圧計45により電圧値を計測し前述した所定電圧以上か否かを判定する。S605は全ての電源装置の電圧が所定電圧以上であれば正常と判定する。
S606は、S602,S603,S604のいずれかで所定電圧未満と判定された場合、接点不良を含む断線異常と判定し異常処理を行う。例えば、図3のS12からS16に示した処理である。
図7は、実施形態2における断線異常の有無を診断する経路について説明する。S601,S602によって経路61を、S603で経路62を、S604で経路63を診断している。強電系のハーネスの断線の有無が診断できると共に接点不良の有無も診断することができる。なお、実施形態1では、図5(a)のS501,S502により図7の経路61を、S504で経路62を、S506で経路63を診断していることなる。
図7は、実施形態2における断線異常の有無を診断する経路について説明する。S601,S602によって経路61を、S603で経路62を、S604で経路63を診断している。強電系のハーネスの断線の有無が診断できると共に接点不良の有無も診断することができる。なお、実施形態1では、図5(a)のS501,S502により図7の経路61を、S504で経路62を、S506で経路63を診断していることなる。
図6(a)(b)による対比及び図7から明らかなように、オフしているスイッチ24,34,44をオンすることなく、S603の電圧計35の値で経路62を、S604の電圧計45の値で経路63を診断できる。このように電源群7のうち少なくとも一つの電源装置のスイッチをオン状態(閉成状態)とすることでオフ状態のスイッチが属する電源装置に電圧を印加することができるため、接点不良を含む断線診断を短時間で実施することができる。
また、図6のS601で電源装置10のスイッチ14をオンにした後、S602,S603,S604で経路の正常が判定されることで、図5(a)と比べて診断を確実にかつ短い工程で行うことができる。また、各電源装置はスイッチと電池装置とを含む回路の両端に電気的接点を有する構造としたため、電気的接点での接触不良も判定することができる。
以上、2つの実施形態について説明したが、これに限るものではなく、発明の趣旨を逸脱しない範囲で変更することができる。例えば、図1ではマスタBMS17を電源装置10のBMSと同一のCPUで構成したがマスタBMS17とスレーブBMSは別のCPUで構成してもよい。
以上、2つの実施形態について説明したが、これに限るものではなく、発明の趣旨を逸脱しない範囲で変更することができる。例えば、図1ではマスタBMS17を電源装置10のBMSと同一のCPUで構成したがマスタBMS17とスレーブBMSは別のCPUで構成してもよい。
また、マスタBMS17からスレーブBMS26,36,46への信号の送信はシリアル通信で説明したが、マスタBMS17からスレーブBMS26,36,46にそれぞれ独立に通信するパラレル通信にしてもよい。電池群7を格納するケースはあっても無くてもよい。電源装置を格納するケースはあっても無くてもよい。マスタBMS17は必須ではなくVCUで兼用してもよい。
また、負荷・回生機器1は車両駆動用モータやインバータにかぎらず、移動体以外、すなわち定置型電源装置の電力負荷であってもよい。また、リレー4は低電圧側に配置した例で説明したが高電圧側に配置してもよいし高低両側にあってもよい。また、リレー4はなくても実現は可能である。電池装置13は、単電池を直列に接続した例を示したが、単電池を直並列に接続したものでもよいし並列に接続したものでもよい。
また、接続関係は、図1に示したものに限らず、単電池や電池装置13の温度を検出する温度計や電池装置13を流れる電流を検出する電流計やヒューズを追加するなど適宜必要な電気回路部品を途中に配置させてもよい。
また、電気的接点の例として、各電源装置のスイッチと電池装置とを含む回路の両端に設けた図2のような電気的接点11,12,21,22,31,32,41,42を一例として説明したが、電気的接点は勘合型コネクタとすることもできる。この場合、電池装置毎に格納用ケースを用意し、ケースに勘合型コネクタの一方のコネクタを取り付け、8に他方のコネクタを接続してもよい。
また、電気的接点の例として、各電源装置のスイッチと電池装置とを含む回路の両端に設けた図2のような電気的接点11,12,21,22,31,32,41,42を一例として説明したが、電気的接点は勘合型コネクタとすることもできる。この場合、電池装置毎に格納用ケースを用意し、ケースに勘合型コネクタの一方のコネクタを取り付け、8に他方のコネクタを接続してもよい。
1・・・負荷・回生機器
7・・・電源群
10,20,30,40・・・電源装置
13,23,33,34・・・電池装置
17・・・マスターBMS(システム制御手段)
16,26,36,46・・・スレーブBMS(電池制御手段)
14,24,34,44・・・スイッチ(切り替え手段)
15,25,35,45・・・電圧計(電圧検出手段)
100・・・コントロールユニット
200・・・VCU
7・・・電源群
10,20,30,40・・・電源装置
13,23,33,34・・・電池装置
17・・・マスターBMS(システム制御手段)
16,26,36,46・・・スレーブBMS(電池制御手段)
14,24,34,44・・・スイッチ(切り替え手段)
15,25,35,45・・・電圧計(電圧検出手段)
100・・・コントロールユニット
200・・・VCU
Claims (3)
- 負荷に対して複数の電源装置が並列に接続された電源群と、該電源群を制御するシステム制御手段と、を有し、
前記電源装置は、電池装置と、前記電池装置に直列に接続されかつ接続と切断を切り替える切り替え手段と、当該電池装置の電圧を検出する電圧検出手段と、を有し、
前記システム制御手段は、少なくとも一つの電源装置の前記切り替え手段を接続側に切り替えると共に、接続側に切り替えていない切り替え手段が属する電源装置の電圧検出手段により検出した電圧値に基づいて故障診断を行うことを特徴とする電源システム。 - 電池装置と、前記電池装置に直列に接続されかつ接続と切断を切り替える切り替え手段と、当該電池装置の電圧を検出する電圧検出手段とを有する電源装置を、負荷に対して並列に接続した電源システムの故障診断方法であって、
少なくとも一つの電源装置の前記切り替え手段を接続側に切り替えた後に、接続側に切り替えていない切り替え手段が属する電源装置の電圧検出手段により検出した電圧値に基づいて故障診断を行うことを特徴とする電源システムの故障診断方法。 - 電池装置と、当該電池装置に直列に接続されかつ接続と切断を切り替える切り替え手段と、前記電池装置と前記切り替え手段を含む回路の両端の電圧を計測する電圧検出手段とを有する電源装置を並列に接続した電源群を制御するシステム制御装置であって、
少なくとも一つの電源装置の前記切り替え手段を接続側に切り替えると共に、接続側に切り替えていない切り替え手段が属する電源装置の電圧値に基づいて故障診断を行うことを特徴とするシステム制御装置。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17906940.6A EP3618218A4 (en) | 2017-04-27 | 2017-12-27 | POWER SUPPLY SYSTEM, PROCESS FOR FAULT DIAGNOSIS FOR AN POWER SUPPLY SYSTEM, AND SYSTEM CONTROL DEVICE |
CN201780090091.4A CN110832726B (zh) | 2017-04-27 | 2017-12-27 | 供电系统、供电系统的故障诊断方法和系统控制装置 |
JP2019515089A JP6770184B2 (ja) | 2017-04-27 | 2017-12-27 | 電源システム、電源システムの故障診断方法およびシステム制御装置 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017-088106 | 2017-04-27 | ||
JP2017088106 | 2017-04-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018198437A1 true WO2018198437A1 (ja) | 2018-11-01 |
Family
ID=63919652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/047046 Ceased WO2018198437A1 (ja) | 2017-04-27 | 2017-12-27 | 電源システム、電源システムの故障診断方法およびシステム制御装置 |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3618218A4 (ja) |
JP (1) | JP6770184B2 (ja) |
CN (1) | CN110832726B (ja) |
WO (1) | WO2018198437A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113224470A (zh) * | 2020-02-05 | 2021-08-06 | 大有能源科技有限公司 | 电动载具的供电电池 |
WO2021155499A1 (zh) * | 2020-02-05 | 2021-08-12 | 大有能源科技有限公司 | 电动载具的供电电池 |
JPWO2022092239A1 (ja) * | 2020-10-28 | 2022-05-05 | ||
JP2024514921A (ja) * | 2021-11-08 | 2024-04-03 | エルジー エナジー ソリューション リミテッド | バッテリーシステム |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117638792A (zh) * | 2023-11-27 | 2024-03-01 | 阳光电源股份有限公司 | 故障定位方法、装置、计算机设备、存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012034535A (ja) | 2010-08-02 | 2012-02-16 | Hitachi Vehicle Energy Ltd | 電池制御装置を備えた蓄電装置 |
JP2013247773A (ja) * | 2012-05-25 | 2013-12-09 | Toyota Motor Corp | 蓄電システムおよび断線判別方法 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0609101B1 (en) * | 1993-01-29 | 2002-06-26 | Canon Kabushiki Kaisha | Electric power accumulating apparatus and electric power system |
KR101062101B1 (ko) * | 2006-11-06 | 2011-09-02 | 테카엠에스 블롬 플루스 포스 노드씨베르케 게엠베하 | 고출력 에너지 축전지들을 포함하는 잠수함 직류 회로망 |
JP5076812B2 (ja) * | 2006-12-18 | 2012-11-21 | 日産自動車株式会社 | 異常診断装置 |
JP5469813B2 (ja) * | 2008-01-29 | 2014-04-16 | 株式会社日立製作所 | 車両用電池システム |
JP2010088202A (ja) * | 2008-09-30 | 2010-04-15 | Toshiba Corp | 電池ユニットおよびこれを用いた電池システム |
JP5449840B2 (ja) * | 2009-04-17 | 2014-03-19 | パナソニック株式会社 | 充放電制御回路、及び電源装置 |
JP2010271267A (ja) * | 2009-05-25 | 2010-12-02 | Mitsubishi Motors Corp | 電池監視装置 |
JP5355224B2 (ja) * | 2009-05-28 | 2013-11-27 | 矢崎総業株式会社 | 複数組電池の電圧監視装置 |
JP2014175127A (ja) * | 2013-03-07 | 2014-09-22 | Toshiba Corp | 電池モジュール及び電池モジュールシステム |
JPWO2014115513A1 (ja) * | 2013-01-22 | 2017-01-26 | 三洋電機株式会社 | 電池モジュールの故障推定システム |
FR3012693B1 (fr) * | 2013-10-27 | 2016-02-05 | Commissariat Energie Atomique | Protection d'une alimentation incluant plusieurs batteries en parallele contre un court circuit externe |
EP3240131B1 (en) * | 2014-12-24 | 2020-02-26 | GS Yuasa International Ltd. | Power supply protection device, power supply device, and switch fault diagnosis method |
-
2017
- 2017-12-27 EP EP17906940.6A patent/EP3618218A4/en active Pending
- 2017-12-27 JP JP2019515089A patent/JP6770184B2/ja active Active
- 2017-12-27 CN CN201780090091.4A patent/CN110832726B/zh active Active
- 2017-12-27 WO PCT/JP2017/047046 patent/WO2018198437A1/ja not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012034535A (ja) | 2010-08-02 | 2012-02-16 | Hitachi Vehicle Energy Ltd | 電池制御装置を備えた蓄電装置 |
JP2013247773A (ja) * | 2012-05-25 | 2013-12-09 | Toyota Motor Corp | 蓄電システムおよび断線判別方法 |
Non-Patent Citations (1)
Title |
---|
See also references of EP3618218A4 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113224470A (zh) * | 2020-02-05 | 2021-08-06 | 大有能源科技有限公司 | 电动载具的供电电池 |
WO2021155499A1 (zh) * | 2020-02-05 | 2021-08-12 | 大有能源科技有限公司 | 电动载具的供电电池 |
JPWO2022092239A1 (ja) * | 2020-10-28 | 2022-05-05 | ||
WO2022092239A1 (ja) * | 2020-10-28 | 2022-05-05 | 本田技研工業株式会社 | 起動装置、蓄電装置、及び電力装置 |
JP7724794B2 (ja) | 2020-10-28 | 2025-08-18 | 本田技研工業株式会社 | 起動装置、蓄電装置、及び電力装置 |
JP2024514921A (ja) * | 2021-11-08 | 2024-04-03 | エルジー エナジー ソリューション リミテッド | バッテリーシステム |
JP7590071B2 (ja) | 2021-11-08 | 2024-11-26 | エルジー エナジー ソリューション リミテッド | バッテリーシステム |
Also Published As
Publication number | Publication date |
---|---|
JP6770184B2 (ja) | 2020-10-14 |
CN110832726B (zh) | 2024-01-30 |
EP3618218A4 (en) | 2021-02-24 |
EP3618218A1 (en) | 2020-03-04 |
JPWO2018198437A1 (ja) | 2020-02-20 |
CN110832726A (zh) | 2020-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6770184B2 (ja) | 電源システム、電源システムの故障診断方法およびシステム制御装置 | |
US9590432B2 (en) | Battery control device comprising a plurality of cell controllers and being capable of determining whether a cell controller is operating abnormally | |
JP5854242B2 (ja) | 電動車両を用いた電力供給装置 | |
JP5469909B2 (ja) | 車両用電池制御システム | |
JP6382453B2 (ja) | 電池監視装置 | |
US10114056B2 (en) | Deterioration specifying device and deterioration specifying method | |
JP5334620B2 (ja) | 充電装置および充電方法 | |
JP2012090474A (ja) | 電池システム | |
JP2007252175A (ja) | 蓄電装置 | |
WO2013084353A1 (ja) | 電池制御装置 | |
US11508997B2 (en) | Battery control device and abnormality sensing method | |
US10333182B2 (en) | Estimation of cell voltage excursion in the presence of battery pack sensing faults | |
KR20210102852A (ko) | 전지 진단 장치 및 차량 | |
WO2018101005A1 (ja) | 電池制御装置 | |
WO2019193973A1 (ja) | 診断装置及び診断方法 | |
JP2019184578A (ja) | 診断装置及び診断方法 | |
KR101918361B1 (ko) | 차량의 배터리 관리 시스템 | |
CN115891660A (zh) | 换电连接器检测方法、装置、电路、电子设备及存储介质 | |
WO2022136434A2 (en) | Method and equipment for monitoring a failure in a high-voltage circuit of a vehicle, and high-voltage circuit system | |
JP2023081533A (ja) | 車載システム | |
JP2014134488A (ja) | 電池監視装置 | |
JP2016127696A (ja) | 電池監視装置 | |
JP6659887B2 (ja) | 診断装置及び診断方法 | |
JP2023179282A (ja) | 制御装置、制御方法、及び制御プログラム | |
KR20220161927A (ko) | 릴레이의 진단을 위한 배터리 시스템 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17906940 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019515089 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2017906940 Country of ref document: EP Effective date: 20191127 |