WO2018130993A3 - Integrated project and equipment management system and method using iot devices and software applications - Google Patents
Integrated project and equipment management system and method using iot devices and software applications Download PDFInfo
- Publication number
- WO2018130993A3 WO2018130993A3 PCT/IB2018/050221 IB2018050221W WO2018130993A3 WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3 IB 2018050221 W IB2018050221 W IB 2018050221W WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- norms
- equipment
- project
- data
- insights
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
An integrated project and equipment management system and methods related to heavy civil construction and mining industries is disclosed. The method includes building detailed context based on project design data, execution plan; equipment efficiency norms, optimization parameters, alarm thresholds, predictive maintenance conditions; material norms and work norms; real time collection of tracking, operational and transaction data related to plants, machinery and materials usage, and populating the same on to a database; performing data pre- processing/aggregation, analytics on the real-time data applying various parameters of the context, bringing out various actionable insights; corrective actions performed based on the insights until the set optimization levels are achieved. The system facilitates equipment companies to share and update various equipment optimization parameters, norms, alarm thresholds and predictive maintenance conditions. This equipment specific dataset is used by the system to analyse project data and presents valuable insights to the construction companies.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN201641024099 | 2017-01-14 | ||
IN201641024099 | 2017-01-14 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2018130993A2 WO2018130993A2 (en) | 2018-07-19 |
WO2018130993A3 true WO2018130993A3 (en) | 2018-11-22 |
Family
ID=62839676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2018/050221 WO2018130993A2 (en) | 2017-01-14 | 2018-01-13 | Integrated project and equipment management system and method using iot devices and software applications |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2018130993A2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11556867B2 (en) | 2019-10-16 | 2023-01-17 | Caterpillar Inc. | System and method for worksite project tracking |
EP4119726B1 (en) * | 2020-03-11 | 2025-04-16 | Sumitomo Construction Machinery Co., Ltd. | Construction management system and asphalt finisher |
CN112149212B (en) * | 2020-09-22 | 2022-08-05 | 广西路桥工程集团有限公司 | Visual construction management platform for engineering project |
WO2022221453A1 (en) * | 2021-04-15 | 2022-10-20 | Invento, Inc. | System and method for managing construction and mining projects using computer vision, sensing and gamification |
US11609688B2 (en) | 2021-05-25 | 2023-03-21 | Caterpillar Inc. | Systems and methods for managing on-site machines by spatial and contextual information |
US20240370799A1 (en) * | 2023-05-04 | 2024-11-07 | Christopher Townsend Soles | System and Method for Enhancing Building Management Projects |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
-
2018
- 2018-01-13 WO PCT/IB2018/050221 patent/WO2018130993A2/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
Also Published As
Publication number | Publication date |
---|---|
WO2018130993A2 (en) | 2018-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018130993A3 (en) | Integrated project and equipment management system and method using iot devices and software applications | |
WO2022271686A3 (en) | Methods, processes, and systems to deploy artificial intelligence (ai)-based customer relationship management (crm) system using model-driven software architecture | |
EP3550426A3 (en) | Improving an efficiency of computing resource consumption via improved application portfolio deployment | |
AU2017246545A1 (en) | Selection of machine learning alogorithms | |
AR119380A1 (en) | MODELING AND CONTROL OF HYDRAULIC FRACTURING | |
EP4553715A3 (en) | Device placement optimization with reinforcement learning | |
EP4357979A3 (en) | Superpixel methods for convolutional neural networks | |
WO2016144546A3 (en) | Systems and methods for generating data visualization applications | |
MX2021002598A (en) | Method and electronic device for monitoring a manufacturing of a metal product, related computer program and installation. | |
CA2937968A1 (en) | Managing performance of systems at industrial sites | |
SG10201807358YA (en) | Workload automation and data lineage analysis | |
IN2015CH03327A (en) | ||
ATE435540T1 (en) | METHOD, SYSTEM AND COMPUTER PROGRAM PRODUCT FOR AUTOMATICALLY CLONING IT EQUIPMENT STRUCTURES | |
WO2018217686A3 (en) | Systems and methods for optimizing oil production | |
EP4350592A3 (en) | Work planning system and work planning method | |
WO2021033207A3 (en) | System and method for just in time characterization of raw materials | |
SG11201811136WA (en) | Flange fastening managing method, fastening managing system, fastening managing program, and fastening managing device | |
MX2015014246A (en) | Basin-to-reservoir modeling. | |
RU2014118921A (en) | HARDWARE AND SOFTWARE COMPLEX FOR MANAGEMENT OF INNOVATIVE DEVELOPMENT OF THE ENTERPRISE IN THE FIELD OF OIL PRODUCTION AND REFINING | |
EA201900512A1 (en) | METHOD FOR CONTROLLING LIFE CYCLE OF A COMPLEX ENGINEERING FACILITY AND SYSTEM FOR ITS IMPLEMENTATION | |
SG10201902788TA (en) | Method for evaluating the conformity of a tracking system to a set of requirements and associated devices | |
FI3607436T3 (en) | Disaggregating latent causes for computer system optimization | |
Quan et al. | Saturated repetitive control for a class of nonlinear systems: A contraction mapping method | |
CN119393146A (en) | An intelligent construction system for controlling overbreak and underbreak of tunnel blasting | |
WO2025049099A3 (en) | System and method for automated task allocation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |