WO2018193785A1 - Système d'extraction de ressources de fonds marins - Google Patents

Système d'extraction de ressources de fonds marins Download PDF

Info

Publication number
WO2018193785A1
WO2018193785A1 PCT/JP2018/011401 JP2018011401W WO2018193785A1 WO 2018193785 A1 WO2018193785 A1 WO 2018193785A1 JP 2018011401 W JP2018011401 W JP 2018011401W WO 2018193785 A1 WO2018193785 A1 WO 2018193785A1
Authority
WO
WIPO (PCT)
Prior art keywords
mining
base
submarine
seabed
arm
Prior art date
Application number
PCT/JP2018/011401
Other languages
English (en)
Japanese (ja)
Inventor
清 菊川
康介 菊川
Original Assignee
清 菊川
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 清 菊川 filed Critical 清 菊川
Publication of WO2018193785A1 publication Critical patent/WO2018193785A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C50/00Obtaining minerals from underwater, not otherwise provided for

Definitions

  • the present invention relates to a submarine resource mining system.
  • Prior Literature 1 discloses a seabed mineral mining system.
  • the mining system described in the document includes a seabed moving device having a grinding tool capable of grinding the surface of a seabed deposit.
  • the seabed moving device grinds the surface of the seabed deposit by an open grinding tool while moving the seabed by receiving electric power and a control signal from a supply source on the sea surface side.
  • the ground product produced by grinding is classified by classifying means so as not to exceed a predetermined size, and the classified ground product is transported to the sea.
  • the submarine auxiliary mining machine is a non-wireless remote control explorer (ROV) or a roped explorer operated by an umbilical cable connected to the sea surface.
  • ROV remote control explorer
  • the submarine auxiliary mining machine is operated on the sea floor alone, the mining machine is controlled, but the bottom of the sea surface during operation is uneven, and it is difficult to control the posture and the operation of the mining machine falls over. Stabilize.
  • many devices such as expansion of mining machines, submarine bulk mining machines, submarine mining machines (GM), and stock pile systems are distributed in the seabed. There are too many problems.
  • the present invention has been made paying attention to such problems, and is a method for increasing investment and operating efficiency by concentrating distributed devices and enabling a wide range of mining to be performed simultaneously. is there.
  • a base is provided at the center of the submarine resource mining system, and a plurality of mining devices are attached to the arm system arranged radially from the base. It is an object of the present invention to provide a movable / fixed submarine resource mining device by a cabled remote control method using an umbilical cable.
  • the first aspect of the present invention provides: In mining submarine resources, (1) A base that forms the center of a submarine resource mining device, and a plurality of long bases that are provided radially from the base and that are movable vertically and horizontally with a plurality of mining devices and transfer devices, and with support legs. Arm system, (2) an umbilical connection that receives power and control signals from a source on the surface of the sea; (3) Transfer means for transferring mined seabed resources to the offshore seafloor resource storage and loading platform; (4) A driving device and a control device for each of the above devices are provided.
  • the second aspect of the present invention is: As movable / fixed in the submarine resource mining system, a type (a) provided with an endless track device on the base of the submarine resource mining device, a tension tether type that suspends the base of the submarine resource mining device from the sea ( b), a mold (c) in which the base of the submarine resource mining apparatus is a large diameter steel pipe and the lower part of the large diameter steel pipe is embedded in the sea floor, or the upper and lower radials provided above the base of the submarine resource mining apparatus and A mold (d) supported and fixed by a plurality of base support legs that can be stretched or a mold (e) appropriately combined with any of the above-mentioned molds (a), (b), (c), (d) (e ).
  • the third aspect of the present invention is:
  • the arm system is composed of a plurality of long main arms provided radially with a support leg and an auxiliary arm movably attached below the main arm, which are arranged radially from the base of the submarine resource mining device. Is characterized in that the mining device and the transfer device are attached, and the transfer device is attached to the main arm.
  • the fourth aspect of the present invention is:
  • the base is provided with a crushing device, a classifying device, a temporary storage place, and an in-base transfer device for mined seabed resources.
  • a tent-type shielding device in which an elliptical annular body into which a fluid is press-fitted is attached to the upper and lower peripheral edges of a trapezoidal tent film covering the entire arm system and the mining device.
  • the sixth aspect of the present invention is: To the top of the tent-type shielding device attached with ring-shaped annular bodies into which fluid is injected into the upper and lower peripheral edges of the trapezoidal tent membrane body, such as classified mud generated when mining seabed resources It discharges from the discharge pipe extended from the base, sinks and stabilizes.
  • the operation is a searchable type and a single umbilical cable to the seabed is used. Troubles involving control and cables can be avoided.
  • the mining machine By placing the mining machine under the arm system that is arranged radially from the base, limit the attitude and mining area of the mining machine, simplify the function and maintenance of the mining machine, stabilize the operation, collapse, etc. Can be prevented.
  • the arm system makes it possible to widen the mining area with the base being stable and fixed, reduce the movement of the seabed resource mining equipment, increase the efficiency of the operation, and reduce the mining leakage. (4) Since the mining efficiency is high, the mining cost can be kept low.
  • Mining resources can cope with any state of lump, slurry, gas.
  • mining of methane hydrate is carried out in bulk (crystal) and can be transferred to the sea in bulk, so that mining costs can be reduced.
  • seawater pollution at the time of mining and seawater pollution at the time of discharge of unnecessary materials after classification can be suppressed to a low level. Such effects can be expected.
  • 1 is a schematic perspective view of an embodiment of the entire seabed resource mining system of the present invention.
  • 1 is a schematic view of a movable / fixed embodiment of a submarine resource mining system of the present invention. It is a schematic diagram of one embodiment of an arm system and a mining device of a submarine resource mining device of the present invention. It is a mining area
  • the apparatus is arranged radially from the base 2, the suspension cable 22 connecting the base 2 and the work ship 8, the umbilical cable 24, the transfer device 25, and the base 2.
  • a plurality of long arm systems 3 and 4 having support legs 32, a mining device 5 attached to the arm systems 3 and 4, and transfer devices 34 and 42 are provided.
  • the re-crushing 231 and the classifier 232, the temporary storage 234 of the resources, the transfer device 233, and the drive device 235 and the control device 236 of each device are common.
  • the submarine resource mining device 1 is suspended from the offshore work ship 8 during suspending or moving, and is connected to the cable connection portion 22, the umbilical connection portion 24, and the transfer for transferring to the offshore subsea resource storage and loading platform 8.
  • Platform 25 and the like are provided.
  • the arm systems 3 and 4 are composed of a main arm 3 and an auxiliary arm 4, and the mining device 5 is attached to the auxiliary arm 4 and has a feature that a mining area can be widened and deeply mined.
  • a semi-submersible platform having an automatic ship position holding device is preferable in consideration of the influence of the rough sea in winter on the seabed resource mining device 1 and the depth.
  • the seabed resources mining apparatus 1 When starting to mine seabed resources, the seabed resources mining apparatus 1 is suspended from the workboat 8 on the sea and installed on the seabed. At the same time, a transfer device 9 from the transfer platform 25 to the offshore seafloor resource storage and loading platform 8 (using the already disclosed technology of Japanese Unexamined Patent Application Publication No. 2016-204875, Patent Registration No. 6030785, Patent Application 2016-2222059, etc.), The umbilical cable 24 and, if necessary, the pressurized water and the like are integrated, and the suspension cable 22 or the chain 22 is tied to the base upper portion 2 and suspended. When the weight load of the submarine resource mining device 1 is large, the suspension cable 22 or the chain 22 is also connected to the main arm 3.
  • the submarine resource mining system can cope with any conditions such as marine weather conditions, sea depth, seabed formation, and resource conditions (lumps, mud) as long as it is a surface type submarine resource.
  • the transfer to the sea has the characteristics that the mined materials are collected on the base and can cope with any state of mass classification, slurry, and gas.
  • the outline of the movable / fixed embodiment of the seabed resource mining apparatus 1 will be described according to the form with reference to FIG.
  • it is a surface type submarine resource, it corresponds to any state of the weather condition of the sea area, the depth, the formation of the seabed, and the state of the resource (lump, mud). It has features for moving and fixing the table 2 and shows an outline thereof.
  • the schematic diagram is easy to understand, and the display of auxiliary arms and mining equipment is omitted.
  • Fig. 2-a is a type (a) with an endless track device 26 at the bottom of the base 2, suitable for mining where the mining resources are shallow and the ground is hard, Is suitable. Naturally, it is fixed at the mining site during the operation of resource mining, and after mining, the endless track device 26 is driven to move by itself.
  • Fig. 2-b is a method that enables the seabed resource mining device 1 to be operated in a stable state even if it is a soft formation with a lot of mud etc. in the seabed. It is a tension tether type (b) that suspends the submarine resource mining device 1. In the softer formation, the heavy submarine resource mining device 1 has a risk of subsidence or collapse, and is suitable for mining the surface methane hydrate on the Japan Sea side where the formation is weak or the rare earth in the Pacific Ocean.
  • Fig. 2-c is a mold (c) in which the lower part of the base 2 is driven or buried in the sea bottom as a method for stabilizing the seabed resource mining device 1 when the sea bottom is soft. Stabilize the base 2 by subsidizing the base 2, arm systems 3 and 4, and mining equipment 5 by using a toothed edge (diameter 5 to 20 meters, length 10 to 50 meters). Plan.
  • the base 2 is further submerged and fixed by driving high-pressure water into the tip of the large-diameter steel pipe with a nozzle or by applying vibration or the like to the large-diameter steel pipe. It is suitable for surface layer type methane hydrate on the Sea of Japan side where mud is contained in the seabed and is soft and the resource-containing layer is 100 meters thick.
  • FIG. 2D shows a type (d) of the submarine resource mining apparatus 1 in which a plurality of vertically and telescopic base support legs 21 provided on the upper circumference of, for example, a large diameter steel pipe are supported and fixed to the sea floor. Stabilize. Since there are also a plurality of arm systems 3 and 4 arranged radially from the base 2, the base support legs 21 are preferably arranged between the arm systems 3 and 4 in consideration of workability.
  • the outline is an arm system 3 and 4 which is arranged radially from the base 2 and can be moved up and down and to the left and right.
  • the main arm main arm, main arm revolving body 31, main arm hoisting rope 33, main arm support) Leg 32
  • auxiliary arm 4 auxiliary arm 4, auxiliary arm revolving unit 41
  • the main arm 3 is divided into 3 to 5 on the circumference of the side wall of the base 2 and is attached to a revolving body 31 fixed to the side wall.
  • the main arm 3 is an auxiliary that is movable under the main arm 3.
  • Install the arm 4, Mining device 5 (mining machine 51, crusher 52) and transfer devices 34 and 42 are attached to the auxiliary arm.
  • the transfer devices 34 and 42 attached to the main arm 3 and the auxiliary arm 4 may be a belt type, a bucket type, a pipe type using water pressure or the like, depending on the contents of the mining resource and the normal state.
  • the structure of the arm depends on the state of the seabed and the state of the resources (lump, mud), but the main arm length 3 is preferably 20-100 meters because it takes a large mining area and is fixed by the main arm support leg 32.
  • the auxiliary arm length 4 that places importance on mobility is preferably 5 to 20 meters.
  • the auxiliary arm 4 and the mining device are brought close to the base side 2 of the main arm 3, and the base 2 with the main arm 3 wound up is suspended from the work ship 8 and installed on the seabed. To do.
  • the auxiliary arm 4 and the mining device 5 are moved to the mining site below the main arm 3. That is, the weight load on the main arm 3 is small, and the arm tip 3 is supported by the arm support leg 32, so that the weight load can be minimized.
  • the movable area of the auxiliary arm 4 can be at all angles below the main arm 3.
  • the movable region may be 180 degrees in the longitudinal direction.
  • the mining equipment 5 is introduced according to the contents of the mining mineral resources, for example, (Technical Paper) Development of a submarine thermal ore mining elemental technology testing machine (Mitsubishi Heavy Industries Technical Report Vol.50 No.2 Special issue on ships and oceans).
  • a mining machine such as a drum cutter may be attached to the auxiliary arm 4.
  • a crusher which uses an impact force 52 is also attached.
  • FIG. 4 shows the movable region of the arm.
  • Base 2 When the submarine resource mining system 1 is installed on the seabed, a plurality of locations for fixing the rope 22 are provided at the top of the base 2 and connected to form the backbone of a device that hangs and descends from the work ship 8. (2) A plurality of arm systems 3 and 4 which are provided with a plurality of mining devices 5 and a transfer device 34 and which can be moved vertically and horizontally are mounted on the outer periphery.
  • the mined seabed resources are crushed 231, classification 232, in-table transport 233, temporary storage 234, umbilical connection unit 24 that receives power and control signals from a source on the sea surface, if necessary,
  • Each device has a driving device 235, controls each device 236, (4)
  • Each device is not special and varies depending on the content of the mineral resource to be mined, so that various explanations are omitted.
  • FIG. 6 a schematic diagram of pollution countermeasures and light specific gravity resource mining by the submarine resource mining system will be described. Due to the turbidity of seawater caused by open-type seabed deposits, there are concerns over deterioration in mining efficiency and environmental problems.For example, crabs live on the seabed on the Sea of Japan side, and in the mining of surface methane hydrate, Problems have been raised about mud contamination. Therefore, FIG. 6 shows a tent in which an elliptical annular body in which a fluid is press-fitted into the upper and lower peripheral edges of the trapezoidal shielding film body is attached to each of the arm systems 3 and 4 radially arranged from the base 2.
  • the shielding film 62 is sized to cover the arm systems 3 and 4 close to the bottom of the sea, and the specific gravity of the shielding film 62 and the tube 61 so as to form a trapezoid when seawater flows into the annular tube at the bottom of the sea. Is heavier than the specific gravity of seawater of about 1.5 to 2.0.
  • the construction of the tent type shielding device 6 is prepared when the submarine resource mining device 1 is on the sea, that is, the upper part of the gable of the trapezoidal tent is attached to the entire length of the main arm 3 in the longitudinal direction and the other parts are bundled
  • the arm systems 3 and 4 are lowered, and the tent (shielding film) 62 is expanded, the bundled part is released and seawater is injected into the tube 61.
  • the expanded tent (shielding film) 62 has a heavy specific gravity of the tube material constituting it, so that the main arm 3 is automatically covered with the gable portion at the top.
  • the tent-type shielding device 6 can extract such light specific gravity mining resources.
  • a hose or the like is used from the upper part of the base side 2 of the extended tent (shielding film) 62.
  • a system for sucking and introducing the base 2 may be provided.
  • the countermeasure method is a ring shape in which unnecessary substances such as mud classified in the base 2 are pressed into the upper and lower peripheral edges of the trapezoidal tent film body 73 provided at the discharge location through the discharge pipe 71. Is released to the upper part of the tent of the tent-type shielding device 7 (reference patent registration No. 6006442 and No. 5296914 is applied) to which the annular body 72 is attached. It escapes from the hole 74 by natural pressure.
  • the shape of the tent-type shielding device 7 is circular, and the size of the shielding film 73 depends on the amount of unwanted materials generated, but the diameter is 30 to 100 meters and the height is about 15 to 60 meters.
  • the tube 72 should have a specific gravity lighter than 1.0, and the tube 72 used in the lower portion should have a heavy specific gravity of about 1.5 to 2.
  • the tent-type shielding device 7 is set up by being lowered to the seabed in a folded state, and seawater is pressed into the tube 72 and expanded.
  • the seawater press-fitting pump can be attached to the tent-type shielding device 7, but the tent-type shielding device 7 is connected to the base 2 and the discharge pipe 71, and is performed from the base 2 of the submarine resource mining device 1.
  • there is also a method in which the unneeded material is transferred to the offshore seabed resource storage and loading platform 8 and solidified and dumped.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

[Problème] Système d'extraction de ressources de fonds marins. [Solution] La présente invention concerne l'extraction de ressources de fond marin, et fournit un système d'extraction de ressource de fonds marins mobile ou fixe caractérisé en ce qu'il comprend : une base constituant le centre du système d'extraction de ressources de fonds marins ; une pluralité de systèmes de bras qui sont agencés selon un motif radial à partir de la base, sont pourvus d'une pluralité de dispositifs d'extraction et d'un dispositif de transfert, et sont capables de se déplacer vers le haut, vers le bas, vers la gauche et vers la droite ; une unité de connexion ombilicale qui accepte de l'énergie électrique et des signaux de commande provenant d'une source d'alimentation à la surface de la mer ; un moyen de transfert pour transférer une ressource de fonds marins extraite à une plateforme de stockage et d'expédition de ressources de fonds marins en mer; et un dispositif d'entraînement et un dispositif de commande pour chaque dispositif.
PCT/JP2018/011401 2017-04-18 2018-03-22 Système d'extraction de ressources de fonds marins WO2018193785A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-081803 2017-04-18
JP2017081803A JP6201094B1 (ja) 2017-04-18 2017-04-18 海底資源採掘システム

Publications (1)

Publication Number Publication Date
WO2018193785A1 true WO2018193785A1 (fr) 2018-10-25

Family

ID=59895769

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/011401 WO2018193785A1 (fr) 2017-04-18 2018-03-22 Système d'extraction de ressources de fonds marins

Country Status (2)

Country Link
JP (1) JP6201094B1 (fr)
WO (1) WO2018193785A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021134613A (ja) * 2020-02-28 2021-09-13 古河機械金属株式会社 海底鉱床採鉱装置および海底鉱床の採鉱方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG10201902911YA (en) * 2019-04-01 2020-11-27 Keppel Marine & Deepwater Tech Pte Ltd Apparatus and method for seabed resources collection

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011142319A1 (fr) * 2010-05-10 2011-11-17 三菱重工業株式会社 Tête de trépan pour machine de forage sous-marin, machine de forage sous-marin et système de forage sous-marin
JP2012202108A (ja) * 2011-03-25 2012-10-22 Mitsui Eng & Shipbuild Co Ltd 海底鉱物資源採鉱システム及びその制御方法
JP2016000930A (ja) * 2014-06-12 2016-01-07 東亜建設工業株式会社 水底地盤掘削装置および水底地盤掘削システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011142319A1 (fr) * 2010-05-10 2011-11-17 三菱重工業株式会社 Tête de trépan pour machine de forage sous-marin, machine de forage sous-marin et système de forage sous-marin
JP2012202108A (ja) * 2011-03-25 2012-10-22 Mitsui Eng & Shipbuild Co Ltd 海底鉱物資源採鉱システム及びその制御方法
JP2016000930A (ja) * 2014-06-12 2016-01-07 東亜建設工業株式会社 水底地盤掘削装置および水底地盤掘削システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021134613A (ja) * 2020-02-28 2021-09-13 古河機械金属株式会社 海底鉱床採鉱装置および海底鉱床の採鉱方法
JP7340189B2 (ja) 2020-02-28 2023-09-07 古河機械金属株式会社 海底鉱床採鉱装置および海底鉱床の採鉱方法

Also Published As

Publication number Publication date
JP2018178601A (ja) 2018-11-15
JP6201094B1 (ja) 2017-09-20

Similar Documents

Publication Publication Date Title
US9879402B2 (en) Disconnectable method and system for seafloor mining
CN103228530B (zh) 浮体结构物作业系统、浮体结构物、作业船及浮体结构物的作业方法
US8282316B2 (en) Method and assembly for installing oilfield equipment at the water bottom
AU2009294382B2 (en) Method of locating a subsea structure for deployment
CN105235839A (zh) 自浮式海床基观测平台
CN101035708A (zh) 近海船舶系泊和升降器入舱系统
JP2003529689A (ja) 海中浚渫方法及び装置
CN105366005A (zh) 一种系泊锚腿的更换方法
EP3072804B1 (fr) Procédé d'installation d'une bouée au niveau d'un emplacement d'ancrage
WO2014130320A1 (fr) Plateforme sous-marine flottable (fsp)
WO2018193785A1 (fr) Système d'extraction de ressources de fonds marins
AU2011215983B2 (en) Rigless intervention
US8181589B2 (en) Gravity anchor
US4085781A (en) Materials delivery system for offshore terminal and the like
US4798500A (en) Method of launching long pipelines
KR20170055631A (ko) 침몰 선박을 인양하는 방법
US20120037063A1 (en) Subsea collection and containment system for hydrocarbon emissions.
JP2005239022A (ja) 浮体連結作業方法
KR102095380B1 (ko) 해양구조물의 계류라인 설치장치 및 해양구조물의 계류라인 설치방법
JPH0860645A (ja) 水中構造物の建造方法
KR101555957B1 (ko) 매설된 해저케이블의 복구방법
KR101628574B1 (ko) 석션 원리를 이용한 탈부착 가능한 석션 무어링 장치와 그 분리 및 설치 방법
CN221118448U (zh) 移动式模块化海上边际油田收割机
Chatzigiannakou et al. Mooring types of point absorbing wave energy converters
KR20120053984A (ko) 수력 터빈 엔진을 침강시키기 위한 시스템 및 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18787102

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase